Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20201537 Ver 1_401 Application_20201207
1 0 patel' 4 1 gob T.E. ALLEN ENGINEERING, PC TERRY E. ALLEN, PE, MSE CONSULTING ENGINEER Post Office Box 103 Rosman, North Carolina 28772 Phone (828) 877-4883 Email: tealleneng@comporium.net Mobile (828) 553-3004 Firm # C-1997 November 12, 2020 SUBJECT: Engineering Services for 401/404 Permitting for new Boathouse Foundation at John L & Susan P Kimmey Residence, 814 North East Shore Drive (B A L29-R East Shore Dr ), Lake Toxaway, Transylvania County, NC PIN: 8522-14- 9815-000 NC DWQ, 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Dear DWQ: DEC 0 7 2020 WDEQIDWR/NMES Enclosed, please find five (5) copies of the 401/404 application (PCN form). A check for the application review fee is also enclosed. This PCN to address the construction of a new Boathouse Foundation at the Kimmey Residence, 814 North East Shore Drive, Lake Toxaway, Transylvania County, North Carolina. The work shall be in accordance with attached Sheets C-1 through C-6. Lake Toxaway has a water quality classification of B; Tr. All disturbed areas not to be filled or flooded will be vegetated pursuant to the seeding schedule in the Erosion and Sediment Control Planning and Design Manual. If you have any questions or require any additional information, please do not hesitate to contact me at (828) 877-4883 or email tealleneng@comporium.net. Sincerely,-.-,--, y Terr;,El Allen, PE, MSE Consulting Engineer Enclosures 5 copies of 401/404 PCN Application Form Check for application review fee Copy Furnish w/ attachment: 401 PERMITTING Kaylie Yankura NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, NC 28711 828 296 4685 office 828 2319634 mobile kaylie. yankura@ncdenr. gov NC FISH & WILDLIFE PERMITTING Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Bldg B Marion, NC 28752 828-400-4223 andrea.leslie@ncwildlife.org USACE 404 PERMITTING Mr. David Brown, PG Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Ave, Room 208 Asheville, NC 28801-5006 828-271-7980 x4232 david.w.brown@usace.army.mil Regional Office � Asheville Regional Office 'N28 290-4500 Reviewer List ^ KaylioYanku,a Pre -Filing Meeting Request sWbmmitted10/2W/2020 Contact Name Terry E. Allen Contact Email Address* Project Name ' Project Owner Project County* Owner Address: |sthis utransportation project? ^ NEW BOATHOUSE FOUNDATION Transylvania Street Address 814North East Shore Drive Address mme Oty LuKoTnxaway amtal/7inCode 2877228747 Type(s)orapproval sought from the oxvm W 401Water Quality Cortifioadon- r- 4O1Water Quality Certifinadnn' Regular Express F- Individual Permit [— Modification [] Shoreline Stabilization Does this project have anexisting project |o#v+ r Yes r No Rate /Rovmo /nEqmn NC uamtry United States Do you know the name of the staff member you would like to request a meeting with? Please give abrief project description below. ° r ,r Construction new20'x30' Boathouse Foundation PIN: 8522-14-9815-000 B A L29-R East Shore Dr Date: 07/2019 Book: 00886 Page: 0495 Plat Book: F19 Page: 194 Kimmey John L III && Kimmey Susan P 4087 Beechwood Dr Atlanta, GA 30327 Please give a couple of dates you are available for a meeting. 10/28/2020 Please attach the documentation you would like to have the meeting about. re -Y By digitally signing below, I certify that 1 have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements. • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/20/2020 f ea o�oF W ArF�Qc o -c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18 - New Boathouse Foundation or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: NEW BOATHOUSE FOUNDATION at KIMMEY RESIDENCE 2b. County: Transylvania 2c. Nearest municipality / town: Brevard 2d. Subdivision name: Lake Toxaway 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: John L Kimmey III & Susan P Kimmey 3b. Deed Book and Page No. Date: 07/2019 Book: 00886 Page: 0495 Plat Book: F19 Page: 194 3c. Responsible Party (for LLC if applicable): 3d. Street address: 814 North East Shore Drive (B A L29-R East Shore Dr) 3e. City, state, zip: Lake Toxaway, NC 28747 3f. Telephone no.: (404) 932-9091 3g. Fax no.: 3h. Email address: Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Terry Allen, PE 5b. Business name (if applicable): T.E. ALLEN ENGINEERING, PC 5c. Street address: P.O. Box 103 5d. City, state, zip: Rosman, NC 28772 5e. Telephone no.: 828-877-4883 5f. Fax no.: 5g. Email address: tealleneng@comporium.net Page 2 of 13 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 8522-14-9815-000 1 b. Site coordinates (in decimal degrees): Latitude: 35.128 Longitude: - 82.941 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 0.714 (from Transylvania County GIS) acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Toxaway 2b. Water Quality Classification of nearest receiving water: B, Trout 2c. River basin: Savannah Page 3 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This home site located in Toxaway Estates, a private residential development in western Transylvania County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential. There is an existing seawall (Bulkhead) along the shoreline. A portion of the existing seawall will be removed as necessary to install the new boathouse foundation. 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: Construct new 26"x32' Boathouse Foundation meeting side yard setback rules. New work to be in accordance with Sheets C1 through C6. The boathouse foundation work will be performed "IN THE DRY" using a coffer dam to create a dry work area, or during the Lake Draw Down Period. Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. A minimum of three (3) rows of temporary Silt Fence shall be provided to separate the work area from the dry Lake Bed. All temporary Erosion Control Measures shall be removed prior to impoudment refill or at the conclusion of Boathouse Foundation work. All Trout Buffer disturbance shall be repaired in accordance with the NCDEQ-DLR Trout Buffer and Riparian Area planting requirements. See attached Sheet C3 for location of work. Page 4 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be used: New Boathouse Foundation (84 LF of permanent impacts). BOATHOUSE FOUNDATION. The Boathouse Foundation work shall be performed "IN THE DRY" using a coffer dam to create a dry work area. Three (3) rows of Turbitidy Curtains shall be used in addition to the Coffer Dam. To comply with Water Quality requirements, the work will be performed in the dry. Where a coffer dam is used, the work area will be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ's Turbidity Standards (15A NCAC 02B.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF-400 from Rain -for -Rent with a 100 to 1 micron nominal rating (P.O.C. at Rain -for -Rent is Jeremy at 704-393-3345). The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the dredging areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. Uncured concrete shall not be allowed to come into direct contact with surface waters. This will be accomplished by establishing a "dry work area" as described above. "High Early" cementious material shall be in the stone work to minimize curing time. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Furnish and install multiple layers of turbidity curtains as necessary to insure regulatory compliance. Permanent Fill (i.e., Boathouse Foundation) shall not exceed 25 cubic yards meeting the following requirements; (a) The quantity of discharged material and the volume of area excavated do not exceed 25 cubic yards below the plane of the ordinary high water mark or the high tide line; (b) The discharge will not cause the loss of more than 1/10-acre of waters of the United States; and (c) The discharge is not placed for the purpose of a stream diversion. No disturbance within existing Vegetated Trout Buffer. Provide Turbidity Curtains around work area to maintian water quality. See attached Sheet C3 for location of work. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: [4-d-. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 5 of 13 PCN Form - Version 1.3 December 10, 2008 Version S. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ®No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. TROUT BUFFER. All disturbance within the Trout Buffer shall be restored in accordance with the NCDEQ-DLR Trout Buffer and Riparian Area planting requirements. Page 6 of 13 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT DWQ S3 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 7 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T Temporary Coffer Dam for 01 []PET Lake Toxaway Boathouse Foundation 75 Linear Lake 0.04 Acres Ft (+/-) 02 []PET Lake ToxawayTemporary Turbidity Curtain to Lake 0.04 Acres Repair Seawall, 75 Linear Ft Permanent Boathouse 03 ®P ❑ T Lake Toxaway Foundation (84 Linear Ft x 3 Ft Lake 0.02 Acres horizontal projection) 04 ❑P❑T 4L Total open water impacts 0.10 Acres 4g. Comments: The work will be performed while the lake is at normal pool elevation, or during the upcoming Lake Draw - down. 1.0 NEW BOATHOUSE FOUNDATION new presast concrete block foundation to support new boathouse structure. 2.0 Boathouse foundation work will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. Three (3) rows of Turbidity Curtains shall be installed in addition to the Coffer Dam. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. Turbidity Curtains to remain in place untll work is complete and the turbidity in the work area is less than 10 NTUs above background. 3.0 Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. S. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 8 of 13 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required. B1 ®P❑T El Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The work will be performed while the lake is at normal pool elevation using a Coffer Dam to create a Dry Work Area, or the work may be performed buring the planned Lake Draw Down period. 1.0 Boathouse foundation work will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. Three (3) rows of Turbidity Curtains shall be installed in addition to the Coffer Dam. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. Turbidity Curtains to remain in place until work is complete and the turbidity in the work area is less than 10 NTUs above background. 3.0 Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment practicable. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation Page 9 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Should project exceed 10% or 1 00'in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land Resources Page 10 of 13 PCN Form —Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. El Yes El No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 11 of 13 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N.A. Page 12 of 13 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) . ........................... 5a. Will this project occur in or near an area with federally protected species or ®Na habitat? Yes 5b. Have you checked with the USFWS concerning Endangered Species Act ❑Yes impacts? No ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? I F71 Yes Z No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7, Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal ❑ governments have designated as having historic or cultural preservation Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? .......... . .......... 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) Ba. Will this project occur in a FEMA-designated 1 00-year floodplain? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? John L Kinimey III Ll Susan P Kimmey r�1111,4 Date 'J ' Applicant/Agebt's Signature Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant is provided.) ji Page 1 -2 of 13 PCN Form - Version 1.3 December 10, 2008 Version 814 North East Shore Drive, Lake Toxaway, NC 1.0 This Project is to install a new Boathouse Foundation. The Architectural and Structural features of the new Boathouse above the top —of —foundation shall be designed by others. Comply with the latest edition of the Lake Toxaway Community Association Architectural Review Standards. 2.0 CONDITIONS FOR USE OF THIS PLAN. These conditions apply to all sheets and all engineering provided herein. By accepting this Plan, you and any others to whom it is distributed, agree to the following conditions; 2.1 As a result of this design, a number of observations have been made and recommendations provided, including plan(s), details and specifications. It should be noted that the plon(s), detail and specifications provided herein are based on information provided as of this writing. It is conceivable that additional information may be forthcoming which bears on these details and specifications. The right is reserved, therefore, to review and modify all observations, conclusions, details and specifications at any future point in time should, in fact, additional information become available. 2.2 Limitation of Liability. All other work that may be required, but not shown herein, shall be designed by the Contractor. By accepting this engineering document, the Owner, Contractor and any others to whom it is distributed, agree to a strict limitation of liability for TERRY E. ALLEN ENGINEER, Terry E. Allen PE, T.E. ALLEN ENGINEERING, P.C., and its employees to an amount not to exceed $25,000.00 or one—half the total amount of paid invoices, whichever is less. 2.3 Indemnification. The Owner and the Contractor shall indemnify and hold harmless T.E. Allen Engineering, PC (hereinafter the `Engineer), and its officers, agents, employees and assigns, to the fullest extent permitted by law, for any loss, cost expenses or damages incurred by the Engineer as a result of the Owner's and/or Contractor's breach of this Agreement or for any act or omission caused solely by the negligence of the Owner and/or Contractor, its employees and its other consultants and subcontractors. This requirement to indemnify and hold harmless shall include compensation for the Engineer's reasonable attorneys fees. 3.0 All work shall be in accordance with 2018 North Carolina State Residential Building Code, OSHA Safety and Health Requirements, US Army Corps of Engineers 404 permit requirements, NCDEQ Division of Water Quality 401 permit requirements, NC Sedimentation Pollution Control Act, Lake Toxaway Community Assoc requirements, and all other applicable codes, ordinances, and regulations. The Contractor shall coordinate all work with the Lake Toxaway Operations Manager, 16801 Rosman Hwy, Lake Toxaway, NC 28747. 4.0 TURBIDITY CONTROL. The Contractor shall not violate water quality stream standards during the performance of this work. The Turbidity Level in the lake waters shall not exceed 10 NTUs above background levels at any time during performance of this work pursuant to 15A NCAC 02B.0211 (3)(k). The Contractor shall employ any and all methods necessary to prevent a violation of the Turbidity Standards. As a minimum, the following turbidity control measures shall be employed. These methods shall be modified and improved as necessary to prevent violation of water quality standards; 4.1 To ensure compliance with Water Quality requirements, the work shall be performed "IN THE DRY" using a coffer dam to create a dry work area. In addition to the coffer dam, a minimum of three (3) turbidity curtains shall be used around the outside (wet side) of the coffer dam. The work area isolated by the coffer dam may be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ's Turbidity Standards (15A NCAC 02B.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF-400 from Rain —for —Rent with a 100 to 1 micron nominal rating (P.O.C. at Rain —for —Rent is Jeremy at 704-393-3345). The dewatering flow from the flirtation bag shall be discharged in front of (on the work side of) the two (2) turbidity curtains for additional filtration. The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the work areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. v� o E.2 w x?0 W.0 a ❑ V ti U C N ,2 00 o Q 10, c 's `v0.0 g s s O p o N c o. ° U a. 60 U C N G7 z 0 � W > pppp pppg .g 0 Y i O x z W S& z �$ W J J r � Q W z O C Lc, w U7 O Q m w z zU :1 o E ocjc) 0 L +� ;> 4 in- ca rw�E~N a, ca W) Zo z a co o H o V � .se o � I 11-12-2= I PRELIMINARY — NOT C-1 Copyright 2020 T.E. ALLEN ENGINEERING PC. All Rights Reserved Worldwide. FOR CONSTRUCTION SHEET' OF GENERAL NOTES AND SPECIFICATIONS. 1.0 All work shall be in accordance with the latest edition of the North Carolina Building Code, ACI 301 — Specifications for Structural Concrete for Buildings, ACI 318 & 318R — Building Code Requirements for Structural Concrete, ACI 548.1R Guide for Use of Polymers in Concrete, ACI 546R Concrete Repair Guide, AISC Steel Construction Manual, OSHA Safety and Health requirements, and all other applicable codes, ordinances, and regulations. Contractor shall obtain all required permits prior to beginning work 2.0 The existing property lines and the Side Yard Setback shall be located, marked and flagged by a Professional Land Surveyor prior to beginning work. Verify actual setback requirement with the most current Lake Toxaway Community Association Architectural Review Standards. 3.0 Contractor shall verify and establish all Finish Floor Elevations (FFE) prior to beginning work. Do not locate any part of the structure within any set —back, easement, right—of—way, floodway or flood fringe, NCDEQ regulated set —back, trout stream buffer zone (or other buffer zone or set back). Contractor shall obtain all required permits prior to beginning work. Contractor shall locate all property boundaries prior to beginning work. Contractor shall locate, flag and protect all underground utilities prior to beginning work. 4.0 Design criteria and assumptions: Design Method = ASCE-7, Minimum Design Loads for Buildings and other Structures Soil Bearing Capacity = 2000 psf, assumed Floor Live Load = 40 psf Floor Dead Load = 15 psf 5.0 FOOTINGS. The bottom of footings shall be located below the frost line. Footings shall be stepped where it is necessary to change the elevation of the top surface of the footings or where the slope of the bottom surface of the footings will exceed 0.1 unit vertical in ten units horizontal (1% slope). All individual pier footings shall be restrained from sliding with anti —slide keys, helical piers, etc). 6.0 CONCRETE. Concrete shall have a minimum compressive strength of 4000 psi at 28 days and shall have 5 to 7% entrained air. DO NOT ALLOW FRESH CONCRETE TO CONTACT LAKE WATERS. 7.0 REINFORCING STEEL. All reinforcing steel and anchor dowels shall conform to ASTM A 615, Grade 60 and shall have standard deformations. All footer reinforcing bars shall have a minimum of 3" of concrete cover. All rebar lap splices shall be 60 bar diameters unless otherwise noted. All footer steel shall be bonded and grounded per the NEC. 8.0 TROUT BUFFER REQUIREMENTS. Where the "on shore" work is within 25—ft of the top —of —bank, and exceeds 10% of the shoreline frontage, the Contractor shall obtain a Trout Buffer Variance from the NCDEQ—DLR Asheville Regional Office (P.O.C. Stan Akin, 828-296-4500). 15A NCAC 04B .0125 BUFFER ZONE REQUIREMENTS. (a) Unless otherwise provided, the width of a buffer zone is measured from the edge of the water to the nearest edge of the disturbed area, with the 25 percent of the strip nearer the land —disturbing activity containing natural or artificial means of confining visible siltation. (b) The 25 foot minimum width for an undisturbed buffer zone adjacent to designated trout waters shall be measured horizontally from the top of the bank. (c) Where a temporary and minimal disturbance is permitted as an exception by G.S. 113A-57(1), land —disturbing activities in the buffer zone adjacent to designated trout waters shall be limited to a maximum of ten percent of the total length of the buffer zone within the tract to be distributed such that there is not more than 100 linear feet of disturbance in each 1000 linear feet of buffer zone. Larger areas may be disturbed with the written approval of the Director. (d) No land —disturbing activity shall be undertaken within a buffer zone adjacent to designated trout waters that will cause adverse temperature fluctuations, as set forth in 15A NCAC 2B .0211 "Fresh Surface Water Classification and Standards", in these waters. PROPERTY OWNERS OF RECORD: John L Kimmey III © Copyright 2020 T.E. Susan P Kimmey ALLEN ENGINEERING PC. 4087 Beechwood Dr All Rights Reserved Worldwide. Atlanta, GA 30327 The Estate of Susan Kimmey. 1151 Northmoor Ct NW Atlanta, GA 30327 Ikimme�gmail.com PRELIMINARY —NOT FOR CONSTRUCTION (404) 932-9091 U C N (D z � � W n �� W o z N O W S v� � W J n c y V LLi m r✓ Z _O Q O W O Q 3 w Z 11-12-2020 1 C-2 SHEET 2 OF 6 DO NOT SCALE DRAWINGS Lat 35.128' NOTES U Lon-82.941 1.0 All Trout Buffer disturbance shall be BOAT SLIP (Maintain 50—Ft repaired in accordance with the NCDEQ-DLR E Trout Buffer and Riparian Area planting > E °i minimum set —back from requirements. o E •o new Shoreline (lake water E 1� o W-4 ~E inside Boat Slip t0 any 2.0 The new Boathouse Foundation shall meet 2 E o art of the existing septic LAKE TOXAWAY all LTCA and State On -Site Wastewater Setback a T U S P g P p requirements. 0N_ o system. - 7 3.0 The New Boathouse will change the o = J�F shoreline. The New Shoreline (lake water) to w a� o U o C QF remain 50-Ft minimum from any part of the - 5 - Z - b - ��o existing septic system. >v ` i o c ' ro LAKE TOXAWAY 4 Q a1 £ ^ ro C. 4.0 Boathouses shall not exceed 30 feet in width, / 35 feet in depth (outside dimensions) or 18 feet in O ° U Normal Pool Elev. height, measured from the normal lake water level (30of El N % (3,010' above Mean Sea Level) to the highest point including railings, parapet walls, roof and any attachments to the roof, and are prohibited from protruding into or over the lake. Maximum roof pitch is 6:12 and cannot exceed the pitch of roof on Z �•!�� the house. The height of boathouses should be , E APprox. p�L si QSHORELINE designed to be kept at a minimum to protect lake W O� %� y�� v views of neighboring properties. A 15-foot side yard Z o z setback must be adhered to and maintained, unless CV \ ��� Q�cF a greater set -back is shown on the engineering Site Z $ N o Plan. L+•i S W a NEW BOATHOUSE FOUNDATION. 5.0 Where the work is performed during the 26' Wide X 32' Long. See upcoming Lake draw -down, temporary Silt Fence and J rn rs, ,� `o Foundation Details on Sheets Stone Check Dams shall be used for erosion control Q ' E 4/ Q C-4, C-5 & C-6. around the work area. All temporary Erosion Control U o Measures shall be in accordance with the latest + Total Permanent Impacts edition of the NC EROSION and SEDIMENT CONTROL La1 (26'+26'+32') = 84 Linear Ft. PLANNING and DESIGN MANUAL. A minimum of three I- (3) rows of temporary Silt Fence shall be provided to separate the work area from the dry Lake Bed. All temporary Erosion Control Measures shall be removed z PIN 8522-14-9815-000 prior to impoudment refill or at the conclusion of O U Q\" Boathouse Foundation work. z Q Ql0} 6.0 Limitation of Liability. By accepting this -d engineering document the Owner, Contractor (D a) :5 and astrict to others olim limitation of liability distributed, for C U Q agree p (EXISTING HOUSE NOT SHOWN) TERRY E. ALLEN ENGINEER, Terry E. Allen PE, O y p .'a v� T.E. ALLEN ENGINEERING, P.C., and its I'- E o '" employees to an amount not to exceed W E $25,000.00 or one-half the total amount of as paid invoices, whichever is less. p, cCU W O LI > N 2 ca © Copyright 2020 T.E. ¢ 'Z o ALLEN ENGINEERING PC. rn Zco 3 All Rights Reserved m °� x a '7. Worldwide. 3 a " O E- Ilk zCd F 11-12-2020 1 BOATHOUSE SITE PLAN PRELIMINARY — NOT C-3 Not to Scale FOR CONSTRUCTION C-3 SKEET 3 OF 6 DO NOT SCALE DRAWINGS TOXAWAY BLOCK, precast concrete segmental block, 24"W x 18"H x L "Toxaway Block" 26'-0" Concrete Segmental Buttress Block Foundation Wall. See Detail o on Sheet C-6. 00 O 0 I N prox o �4'�� 0 06'0 o O 06'0 4' 0 00 0 0 O O I 0 V) J 0 N J Y - O o V) m o U) 0 m U 0 08' 0 0 33 O 0 00 O 11 ri I 1—1 I I—� � o Clear Inside oreline 21 1--- LAKE TOXAWAY v O F i En N O O A o 7 0 m W O 2 (N O J N J o � Q O m r - o a� 0 0 8'O O 0 o m 0 00 0 o --1 2>l___ Approx Furnish and install #8 epoxy coated vertical dowel bar w/ 16" top hook, continuous through all segmental blocks cells. All cells in segmental blocks to be grouted solid w/ 4000 psi hydraulic cementious grout suitable for underwater application. See Detail on Sheet C-6. BOATHOUSE FOUNDATION - ODD NUMBERED COURSES Not to Scale Limitation of Liability. By accepting this engineering document, the Owner, Contractor and any others to whom it is distributed, agree to a strict limitation of liability for TERRY E. ALLEN ENGINEER, Terry E. Allen PE, T.E. ALLEN ENGINEERING, P.C., and its employees to an amount not to exceed $25,000.00 or one—half the total amount of pai( invoices, whichever is less. ne © Copyright 2019 T.E. ALLEN ENGINEERING PC. All Rights Reserved Worldwide. PRELIMINARY — NOT FOR CONSTRUCTION `� w ° U a 2 E U N L) c� _ L t�O 00 V Q >•"+ 0 w� va0Up r N N o ° _b N� a,xz `v.a Cd nGq° WW N< Z ' ^ V Z 5 Y LLJ c7 E W z �s w g" J Q U E 4i 11—,2-2020 C-4 SHEET 4 OF 6 Furnish and install #8 epoxy coated vertical dowel bar w/ 16" top hook, continuous through all segmental blocks cells. All cells in segmental blocks to be grouted solid w/ 4000 psi hydraulic cementious grout suitable for underwater application. Reinforced Concrete Grade Beam —\ all around, (18 x24 xCont.). See Grade Beam Reinforcing Schedule. Backfill w/ #57 clean. washed stone. ____ Provide non -woven needle punched geotextile fabric — between stone and earth. 18" Min jT_ 18" Min. Increase depth as required to insure foundation bears on satisfactory insitu material having a minimum bearing capacity of 2,000 PSF Minimum bridging depth 10-FT. All structure above the Toxaway Block Foundation to be designed by others. See Architectural Plans and Structural Plans designed by others. MEM 1 \ 22'-0" ~- ....... .... 2 I Clear Inside I --* / p Water 11 s'. Furnish and install #8 epoxy coated vertical dowel bar w/ 16" top hook, continuous through all segmental blocks cells. All cells in segmental blocks to be grouted solid w/ 4000 psi hydraulic cementious grout suitable for underwater application. Reinforced Concrete Grade Beam all around, (18 x24 xCont.). See Grade Beam Reinforcing Schedule. 1 ip ; Backfill w/ #57 clean washed stone. r� .,��iiii - ODU , V � , .. "Toxawa <:7 y I > Y ti .�. Block" Y- Concrete 6'-0" Segmental 6'-0" Block L�subgracle and Foundation Wall. Cover subgrade and wrap footer stone wrap footer stone with Mirafi 50OX with Mirafi 50OX geotextile fabric geotextile fabric REINFORCED CONCRETE GRADE BEAM (18"x24"xCont.) REINFORCING SCHEDULE 4 #5 Bottom Longitudinal Bars continuous, enclosed w/ #3 Stirrups 6" O.C. 2 #5 Top Longitudinal Bars continuous, enclosed w/ #3 Stirrups ® 6" O.C. #3 Stirrups at 6" on center. Stirrups to have 3" concrete cover all around. 1 BOATHOUSE FOUNDATION SECTION C-6 Not to Scale cO Provide non -woven needle punched geotextile fabric between stone and earth. 18" Min 18" Min. Increase depth as required to insure foundation bears on satisfactory insitu material having a minimum bearing capacity of 2,000 PSF Minimum bridging depth 10-FT. DO NOT SCALE DRAWN( Limitation of Liability. By accepting this engineering document, the Owner, Contractor and any others to whom it is distributed, agree to a strict limitation of liability for TERRY E. ALLEN ENGINEER, Terr E. Allen PE, T.E. ALLEN ENGINEERING, P.C., and its employees to an amount not to exceed $25,000.00 or one-half the total amount of paid invoices, whichever is less. © Copyright 2019 T.E. ALLEN ENGINEERING PC. All Rights Reserved Worldwide. PRELIMINARY - NOT FOR CONSTRUCTION U itz a 0 Z E o w �� W m u z � tw g .J Q U E Us] z O � 0 z � a"oQUo OCd 0 Q) O' o C/) G, m W 4 O w��N 2 C', = vN Cj 00 Z �oo� XA�. a o z " a I 11-12-2= I C-6 SHEET 6 OF 6