Loading...
HomeMy WebLinkAbout20201560 Ver 1_Pre-Filing Meeting Information_20201211DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Ple ase list all e xisting proje ct ID's associate d with this proje cts.* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* Jerry Parker jparker@ncdot.gov NCDOT Smith Rd Bridge Replacement (Bridge # 166) Rockingham City Greensboro State / Province / Region NC Postal / Zip Code 27415-4996 Country USA Street Address P.O. Box 14996 Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No WBS 17BP.7.R.109 Dave Wanucha The North Carolina Department of Transportation (NCDOT) has proposed to replace Rockingham County Bridge #166 on Smith Road (SR 1360) over Pawpaw Creek. The existing structure is a single span bridge (1@40’4”) steel plank deck on I-Beams. The end bents are timber caps and piles. The proposed structure is a single span (1@80'), 33" box beam with 4' deep caps. This structure has been designed to have as little environmental, wetland, and surface water impacts as possible. 2:1 roadway fill slope will be used in the wetland areas to minimize wetland impacts. Permanent drainage easement (PDE) will be set to have as little wetland impacts as possible. No meeting necessary Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature * Submittal Date 11/5/2020 780166_Permit_Drawings_20180731.pdf 2.58MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 10/23/2020