Loading...
HomeMy WebLinkAbout20201640 Ver 1_Revised - Division 7 - STR - Buffer (Haw) - CF 02 (Agony Acres)_20201202 dS74 ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary April 24,2019 TIM BAUMGARTNER Director Mr.Jerry Parker NCDOT Division 7 Environmental Supervisor North Carolina Department of Transportation Post Office Box 14996 Greensboro,North Carolina 27415-4996 Dear Mr.Parker: Subject: DMS Mitigation Acceptance Letter: Division 7 Project—Replace Bridge 40 over UT to Reedy Fork on SR 2735 (Sockwell Road),Guilford County,WBS No. 17BP.7.C.17 The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services(NCDEQ DMS)will provide the stream and buffer mitigation for the subject project. Based on the information supplied by you on April 22,2019, the impacts are located in CU 03030002 of the Cape Fear River basin in the Central Piedmont(CP)Eco-Region,and are: Cape Fear 03030002 Stream Wetlands Buffer(Sq.Ft.) Jordan—Haw Arm — , CP Cold Cool Warm Riparian Non-Riparian Coastal Marsh Zone 1 Zone 2 Impacts(feet/acres) 0 0 26.0 0 0 0 1,190.0 207.0 *Some of the stream and wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio.See permit application for details. All buffer mitigation requests and approvals area administrated through the Riparian Restoration Buffer Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer mitigation will be provided in the agreed upon method of fund transfer. Upon receipt of the NCDWR's Buffer Authorization Certification,NCDEQ DMS will transfer funds from the NCDOT 2984 Fund into the Riparian Restoration Buffer Fund. Upon completion of transfer payment,NCDOT will have completed its riparian buffer mitigation responsibility for this project. This bridge replacement project encroaches on DMS mitigation project Agony Acres. The USACE determined that stream mitigation is required and there is a loss of enhancement II stream credits from the mitigation project. If the stream mitigation credits are needed by NCDOT for future needs,then additional stream mitigation credits will be implemented. DMS will commit to implement sufficient compensatory stream mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28,2010.If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Beth Harmon at 919-707-8420. Sincerely, urP &C:it-Lq Jo S. Stanfill D Asset Management Supervisor cc: Mr.David Bailey,USACE—Raleigh Regulatory Field Office Ms.Amy Chapman,NCDWR Ms.Linda Fitzpatrick,NCDOT PDEA P:!Q3 North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976