Loading...
HomeMy WebLinkAbout20201640 Ver 1_C17_EC and Construction Seq_20201202NA 2011NAD 83/CREEK(SR 2736) TO BALDWIN RD (SR 1500) OSSIPEE RD TO GIBSONVILLE -L- STA. 11+50.00 BEGIN PROJECT 17BP.7.C.17 -L- STA. 13+25.00 END PROJECT 17BP.7.C.17 -L- STA. 12+50.00 PROP CULVERT -L- SR 2735 (SOCKWELL RD)-L- SR 2735 (SOCKWELL RD) NFRASTRUCTURE CHARLOTTE, NORTH CAROLINA 28273 IUS IUS OF CAROLINA, INC. N.C. LICENSE # C-1950 9140 ARROWPOINT BLVD, SUITE 200 STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PLAN FOR PROPOSED HIGHWAY EROSION CONTROL EROSION AND SEDIMENT CONTROL MEASURES Temporary Silt Ditch Temporary Silt Fence Silt Basin Type B Stilling Basin TDTemporary Diversion Temporary Rock Silt Check Type-B Temporary Rock Silt Check Type-A Temporary Rock Sediment Dam Type-A Temporary Rock Sediment Dam Type-B Type A Type B Type C A B C Temporary Silt Fence TSD Std. #Description Symbol Temporary Berms and Slope Drains Rock Inlet Sediment Trap: 1630.03 1630.05 1605.01 1622.01 1633.01 1634.01 1634.02 1635.01 1635.02 1630.04 1632.01 1632.02 1632.03 Rock Pipe Inlet Sediment Trap Type-A Rock Pipe Inlet Sediment Trap Type-B Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Temporary Silt Fence Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design revison thereto are applicable to this project and by reference hereby are considered a part of these plans. Rock Pipe Inlet Sediment Trap Type A EC-1 1606.01 Special Sediment Control Fence 1634.01 1634.02 1635.01 1605.01 1630.01 Temporary Berms and Slope Drains 1606.01 1622.01 Special Sediment Control Fence Riser Basin 1635.02 Rock Pipe Inlet Sediment Trap Type B 1604.01 Railroad Erosion Control Detail 1607.01 Gravel Construction Entrance Skimmer Basin Tiered Skimmer Basin Infiltration Basin Special Stilling Basin1630.06 Temporary Rock Silt Check Type-A with Matting and Polyacrylamide (PAM) Wattle/Coir Fiber Wattle Wattle/Coir Fiber Wattle with Polyacrylamide (PAM) 1630.02 1633.02 1630.05 Temporary Diversion 1630.04 Stilling Basin 1630.03 Temporary Silt Ditch 1630.02 Silt Basin Type B 1630.06 Special Stilling Basin 1631.01 Matting Installation 1632.02 1632.01 Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type A 1632.03 Rock Inlet Sediment Trap Type C 1633.01 1633.02 Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A 1640.01 Coir Fiber Baffle 1645.01 Temporary Stream Crossing EW CFW ROADSIDE ENVIRONMENTAL UNIT Raleigh, NC 27611 1 South Wilmington St. Prepared in the Office of: NAME LEVEL III CERTIFICATION NO. Reviewed by: Reviewed in the Office of: Designed by: SANDRA P. HAYES, PE GUILFORD COUNTY 2018 STANDARD DRAWINGS 3280 LOCATION: TYPE OF WORK: CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS GRAPHIC SCALE PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) 10 20 10 20 2 4 0 0 0 RESOURCES. RESOURCES DIVISION OF WATER OF ENVIRONMENT AND NATURAL THE NORTH CAROLINA DEPARTMENT AUGUST 1, 2016 AND ISSUED BY CONSTRUCTION PERMIT EFFECTIVE BY THE NCG-010000 GENERAL THE REGULATIONS SET FORTH CONTROL PLANS COMPLY WITH THESE EROSION AND SEDIMENT GRADING, PAVING, SHOULDER CONSTRUCTION, GUARDRAIL, & CULVERT 17BP.7.C.17 WBS PROJECT: 17BP.7.C.17REPLACE PIPE #40 2112 ON SR 2735 (SOCKWELL RD) - 1.2 MI. E. JCT. NC 61 AARON HARPER 2018 STANDARD SPECIFICATIONS Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest for Special Considerations. Refer To E. C. Special Provisions ON THIS PROJECT SENSITIVE AREA(S) EXIST ENVIRONMENTALLY STANDARDS. SENSITIVE WATERSHED BEEN DESIGNED TO THIS PROJECT HAS FLOW A A WIDTH PLAN SECTION A-A SECTION B-B B B 2/3 CHANNEL STRUCTURAL STONE SEDIMENT CONTROL STONE 12" EXCELSIOR MATTING EXCELSIOR MATTING CLASS B STONE PAM INSET A See Inset A USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. EXCELSIOR MATTING CLASS B STONE R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. NOT TO SCALE TEMPORARY ROCK SILT CHECK TYPE 'A' WITH EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT TO BE APPLIED TO EACH ROCK SILT CHECK. INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM) (4 OZ.) H = 2' MIN 1' MIN 1' MIN INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01. NOTES: EC-217BP.7.C.17 4 SUBTOTAL MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER TOTAL SAY SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY)STATION TO SIDESTATION FROM LINE SHEET NO. CONST ESTIMATE (SY) MATTING FOR EROSION CONTROL PERMANENT SOIL REINFORCEMENT MAT SUBTOTAL TOTAL SAY ADDITIONAL PSRM TO BE INSTALLED SHEET NO.PROJECT REFERENCE NO. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. SOIL STABILIZATION SUMMARY SHEET 4 -L- -L- 11+50 lt 490 EC-3 11+50 13+25 13+25 rt 430 920 950 950 30 17BP.7.C.17 NA 2011NAD 83/B STN STN 10'10'10'10'++++10'10'GEORGE Y TEAGUE 1 GEORGE Y TEAGUE 1 1 GEORGE Y TEAGUE 1 GEORGE Y TEAGUE 690 685 680 675675680685690695700670666686 6 8 4 6 8 2 674672672674682684686695SR 2735 (SOCKWELL RD) 20' BST 2 3 4 S S S1-9 S1-8 S1-7 12' SOILS1-4 S1-5 S1-3 W1-4 S1-6 S1-1 S1-2 WOODS WOODS 48" W/WW/W ELECTRIC FENCE W-5 & CAP REBAR 60.00'60.00'DB 4486 PG 1855 DB 4486 PG 1855 DB 4486 PG 1851 DB 4486 PG 1851 NAIL SET IN POWER POLE TBM #2 EL=692.43' BL-100 NAIL SET IN 23" HICKORY TBM #1 EL=684.43' WITH FLAGGING 1" PVC 24" CEDAR WD POST 16' SOIL PATHWD POST WD POST 15" RCP CONC. CONC. WOODS 15" DIP48" W/WS S EX. 72" ATPEX. INV=667.22' EX. INV=667.32' -L- -L- EXISTING R/W & CAP REBAR PB 185 PG 118 CONSERVATION EASEMENT NORTH CAROLINA EXISTING R/W EXISTING R/W EXISTING R/W WOODS (SR 2736) TO BALDWIN RD (SR 1500) OSSIPEE RD TO GIBSONVILLE WOODSPOT Sta. 10+00.00PI Sta. 13+96.87POT Sta. 14+97.15 EXEX0.020.020.020.02EXEXSKEW=95 W/ HEADWALL & ENDWALL 87"x63" CAAPA C ELEV.=677.64' C STA. 12+50.00 -L-L L GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 +62 30' +13 45' +56 53'+89 30' +44 52' +09 30' +84 30' 48" W/W FENCE RESET 160 LF OF EX. 72" ATP REMOVE EST 13 SY GEOTEXTILE EST 4 TONS SEE DETAIL A TOE PROTECTION EST 30 SY GEOTEXTILE EST 10 TONS SEE DETAIL A TOE PROTECTION EST 15 SY GEOTEXTILE EST 10 TONS SEE DETAIL B W/CLASS I RIP RAP OUTLET CHANNEL BANKS EST 15 SY GEOTEXTILE EST 10 TONS SEE DETAIL B W/CLASS I RIP RAP INLET CHANNEL BANKS RETAIN RETAIN REMOVE CONCRETE -L- STA. 11+50.00 BEGIN PROJECT 17BP.7.C.17 -L- STA. 13+25.00 END PROJECT 17BP.7.C.17REVISIONS R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/990 GRAPHIC SCALE 20 401020 EC-4/CONST.4 ENGINEER. NEED TO BE INSTALLED AS DIRECTED BY THE ADDITIONAL EROSION CONTROL DEVICES MAY REQUIRE PRIOR APPROVAL BY ENGINEER. NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL NOTE: UTILIZE TEMPORARY SEDIMENT BASIN OR SPECIAL STILLING BASIN(S) AS STILLING BASIN WHERE APPLICABLE. NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT INSTALLED DURING CLEARING AND GRUBBING PHASE. PERIMETER EROSION CONTROL MEASURES SHALL BE NOTE: LOCATED WITHIN EXISTING R/W OR EASEMENT. ALL EROSION CONTROL DEVICES SHOWN ARE NOTE: 12,870 SF DISTURBED AREA CONSTRUCTION SHEET 4 EROSION CONTROL FOR CLEARING AND GRUBBING 17BP.7.C.17 SILL & CHANNEL DETAIL B INLET/OUTLET NOT TO SCALE INLET & OUTLET SILL INSET 2 ft MIN INLET & OUTLET SILL INSET 2 ft MIN FLOW SILL PLAN VIEW PROFILE VIEWX-SECTION VIEW TO TOP OF BANK @ 1.5:1 OR FLATTER CLASS I RIP RAP 1 ft SILL NOTES: -SILL DIMENSIONS THE SAME @ INLET AND OUTLET 87"x63" CAAPA FROM STA. 12+58 TO STA. 12+76 -L- RT FROM STA. 11+86 TO STA. 12+35 -L- LT Fill Slope2:1 or Flatter b= 2 Ft. d= 1 Ft. Type of Liner= CLASS B Rip-Rap b DETAIL A Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile F F F F F F NA 2011NAD 83/B STN STN 10'10'10'10'++++10'10'GEORGE Y TEAGUE 1 GEORGE Y TEAGUE 1 GEORGE Y TEAGUE SR 2735 (SOCKWELL RD) 20' BST 2 3 S S 12' SOILWOODS 48" W/WW/W ELECTRIC FENCE & CAP REBAR 60.00'DB 4486 PG 1855 DB 4486 PG 1855 DB 4486 PG 1851 NAIL SET IN POWER POLE TBM #2 EL=692.43' BL-100 NAIL SET IN 23" HICKORY TBM #1 EL=684.43' WITH FLAGGING 1" PVC 24" CEDAR WD POST 16' SOIL PATHWD POST WD POST 15" RCP CONC. CONC. WOODS 15" DIP48" W/WS S EX. 72" ATPEX. INV=667.22' EX. INV=667.32' -L- EXISTING R/W & CAP REBAR PB 185 PG 118 CONSERVATION EASEMENT NORTH CAROLINA EXISTING R/W WOODS WOODSEXEX 0.020.020.020.02EXEXSKEW=95 W/ HEADWALL & ENDWALL 87"x63" CAAPA C ELEV.=677.64' C STA. 12+50.00 -L-L L GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 48" W/W FENCE RESET 160 LF OF EX. 72" ATP REMOVE DIKE 2 IMPERVIOUS DIKE 1 IMPERVIOUS EST 13 SY GEOTEXTILE EST 4 TONS SEE DETAIL A TOE PROTECTION EST 30 SY GEOTEXTILE EST 10 TONS SEE DETAIL A TOE PROTECTION EST 15 SY GEOTEXTILE EST 10 TONS SEE DETAIL B W/CLASS I RIP RAP OUTLET CHANNEL BANKS EST 15 SY GEOTEXTILE EST 10 TONS SEE DETAIL B W/CLASS I RIP RAP INLET CHANNEL BANKS RETAIN RETAIN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED REVISIONS R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION CONSTRUCTION SEQUENCE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 0 GRAPHIC SCALE 20 401020 LOCATED WITHIN EXISTING R/W OR EASEMENT. ALL EROSION CONTROL DEVICES SHOWN ARE NOTE: EC-4A/CONST.417BP.7.C.17 12 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. UPON STABILIZATION OF ALL DISTURBED AREAS, REMOVE ALL TEMPORARY SEDIMENT CONTROL DEVICES. CONDITIONS. PREPARE AND STABILIZE SLOPES AND ALL OTHER DISTURBED AREAS. AREAS WITHIN JURISDICTIONAL WATERS SHALL BE RESTORED TO THE PRE-PROJECT CULVERT(S). REMOVE DOWNSTREAM, THEN UPSTREAM DIKE(S), ALL PUMPS, HOSES, AND STABILIZED OUTLETS. ALLOW FLOW THROUGH NEWLY CONSTRUCTED UPON COMPLETION OF WORK, REMOVE ANY SEDIMENT ACCUMULATION BEHIND IMPERVIOUS DIKES. PLANS. CONSTRUCT PROPOSED CULVERT(S), HEADWALL & ENDWALL (AS REQUIRED BY PLANS), BACKFILL, CHANNEL IMPROVEMENTS, AND PROPOSED ROADWAY PER PERFORM REQUIRED EXCAVATION FOR PROPOSED CULVERT(S) INCLUDING REMOVAL OF EXISTING CULVERT(S). DE-WATER THE WORKING AREA, AS NEEDED FOR CONSTRUCTION, INTO THE SPECIAL STILLING BASIN AND TEMPORARY STABILIZED OUTLET. INSTALL DOWNSTREAM IMPERVIOUS DIKE(S), DE-WATERING PUMP(S), AND TEMPORARY FLEXIBLE HOSE(S). INSTALL UPSTREAM IMPERVIOUS DIKE(S) AND BEGIN PUMPING (CLEAN WATER EFFLUENT) DOWNSTREAM TO TEMPORARY STABILIZED OUTLET. INSTALL CLEAN WATER PUMP-AROUND PUMP(S) AND TEMPORARY FLEXIBLE HOSE(S). REFER TO STD. DRAWING 1630.06. INSTALL SPECIAL STILLING BASIN (DE-WATERING BAG) AND TEMPORARY STABILIZED OUTLET(S) AT THE DOWNSTREAM END OF THE WORKING AREA. INSTALL TEMPORARY SEDIMENT CONTROL DEVICES: PERIMETER EROSION CONTROL, SAFETY FENCING, AND JURISDICTIONAL FLAGGING. RESIDENT ENGINEER. DIRECTED, AND IN SUCH A MANNER APPROVED BY THE MATERIAL, IN LOCATIONS NOTED ON THE PLANS OR AS DIKES SHALL BE CONSTRUCTED OF AN ACCEPTABLE CONTRIBUTE TO SILTATION OF THE STREAM. IMPERVIOUS SEEPAGE OF WATER INTO THE CONSTRUCTION SITE OR THE IN-STREAM WORKING AREA AND SHALL NOT PERMIT IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE2. DIKES AND KEPT DE-WATERED. OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS EXCAVATION SHALL BE PERFORMED IN DRY CONDITIONS ALL CULVERT AND CHANNEL WORK INVOLVING 1. NOTES: -L- STA. 11+50.00 BEGIN PROJECT 17BP.7.C.17 -L- STA. 13+25.00 END PROJECT 17BP.7.C.17 F F F F F F NA 2011NAD 83/B STN STN 10'10'10'10'++++10'10'GEORGE Y TEAGUE 1 GEORGE Y TEAGUE 1 1 GEORGE Y TEAGUE 1 GEORGE Y TEAGUE SR 2735 (SOCKWELL RD) 20' BST 2 3 S S S1-9 S1-8 S1-7 12' SOILS1-4 S1-5 S1-3 W1-4 S1-6 S1-2 WOODS 48" W/WW/W ELECTRIC FENCE W-5 & CAP REBAR 60.00'60.00'DB 4486 PG 1855 DB 4486 PG 1855 DB 4486 PG 1851 DB 4486 PG 1851 NAIL SET IN POWER POLE TBM #2 EL=692.43' BL-100 NAIL SET IN 23" HICKORY TBM #1 EL=684.43' WITH FLAGGING 1" PVC 24" CEDAR WD POST 16' SOIL PATHWD POST WD POST 15" RCP CONC. CONC. WOODS 15" DIP48" W/WS S EX. 72" ATPEX. INV=667.22' EX. INV=667.32' -L- -L- EXISTING R/W & CAP REBAR PB 185 PG 118 CONSERVATION EASEMENT NORTH CAROLINA EXISTING R/W EXISTING R/W EXISTING R/W WOODS (SR 2736) TO BALDWIN RD (SR 1500) OSSIPEE RD TO GIBSONVILLE WOODSPOT Sta. 10+00.00PI Sta. 13+96.87POT Sta. 14+97.15 EXEX0.020.020.020.02EXEXSKEW=95 W/ HEADWALL & ENDWALL 87"x63" CAAPA C ELEV.=677.64' C STA. 12+50.00 -L-L L GREU TL-3 GREU TL-3 GREU TL-3 GREU TL-3 +62 30' +13 45' +56 53'+89 30' +44 52' +09 30' +84 30' 48" W/W FENCE RESET 160 LF OF EX. 72" ATP REMOVE EST 13 SY GEOTEXTILE EST 4 TONS SEE DETAIL A TOE PROTECTION EST 30 SY GEOTEXTILE EST 10 TONS SEE DETAIL A TOE PROTECTION EST 15 SY GEOTEXTILE EST 10 TONS SEE DETAIL B W/CLASS I RIP RAP OUTLET CHANNEL BANKS EST 15 SY GEOTEXTILE EST 10 TONS SEE DETAIL B W/CLASS I RIP RAP INLET CHANNEL BANKS RETAIN RETAIN W/HW & EW 87" x 63" CAAPA REMOVE CONCRETE -L- STA. 11+50.00 BEGIN PROJECT 17BP.7.C.17 -L- STA. 13+25.00 END PROJECT 17BP.7.C.17REVISIONS R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 ENGINEER. NEED TO BE INSTALLED AS DIRECTED BY THE ADDITIONAL EROSION CONTROL DEVICES MAY REQUIRE PRIOR APPROVAL BY ENGINEER. NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL 0 GRAPHIC SCALE 20 401020 Sta. 11+50 to Sta. 13+25 on Slope as Work Allows. Place Matting for Erosion Control EC-5/CONST.4 SHEET 4 FOR CONSTRUCTION FINAL EROSION CONTROL LOCATED WITHIN EXISTING R/W OR EASEMENT. ALL EROSION CONTROL DEVICES SHOWN ARE NOTE: 17BP.7.C.17 F F F F F F