HomeMy WebLinkAbout20201640 Ver 1_HYD_SMP_10022018_20201202(Version 2.07; Released October 2016)
17BP.7.C.17 TIP No.:County(ies):Guilford Page 1 of 1
TIP Number:Date:
Phone:Phone:
Email:Email:
County(ies):
CAMA County?
No
Design/Future:Year:2018 Existing:Year:
Aquatic T&E Species?No Comments:
No Yes
No
Wetlands within Project Limits?
None
Supplemental Classification:
Rural
UT to Reedy Fork
0.1
50ft
Project Description
Proposed Project
Cape FearRiver Basin(s):
City/Town:
0.1
Typical Cross Section Description:
Surrounding Land Use:
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
No
gcail@ncdot.gov
Address:
10/2/2018
Guilford
Galen Cail
Raleigh, NC 27610
WBS Element:
Culvert ReplacementWBS Element:
NCDOT Contact:
(919) 707-6711
Contractor / Designer:
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
Project Type:
1020 Birch Ridge Address:
General Project Information
17BP.7.C.17
Impairments:
Other Stream Classification:
Primary Classification:
Project Built-Upon Area (ac.)
Culvert project will replace existing 1 @ 6' x 4.3 tile arch culvert with a 1 @ 87" x 67" corrugated aluminum alloy pipe arch w/ headwall on SR 2735 (Sockwell Rd). Armor stream
banks with rip rap for stabilization. Existing pipe is perched at outlet. New culvert will be buried below stream bed with inlet and outlet sills. Existing fill slopes are very steep and
unstable. New slopes will be flatter 2:1 grassed slopes.
Jordan LakeBuffer Rules in Effect:
540
11 ft lanes w/ 6 ft grassed shoulders
Waterbody Information
2018
NCDWR Stream Index No.:
NRTR Stream ID:
Annual Avg Daily Traffic (veh/hr/day):
Existing Site
Project Length (lin. miles or feet):
ac.
Surface Water Body (1):
Class CNCDWR Surface Water Classification for Water Body
ac.
11 ft lanes w/ 3' grassed shoulders
540
Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)