Loading...
HomeMy WebLinkAbout20201640 Ver 1_HYD_SMP_10022018_20201202(Version 2.07; Released October 2016) 17BP.7.C.17 TIP No.:County(ies):Guilford Page 1 of 1 TIP Number:Date: Phone:Phone: Email:Email: County(ies): CAMA County? No Design/Future:Year:2018 Existing:Year: Aquatic T&E Species?No Comments: No Yes No Wetlands within Project Limits? None Supplemental Classification: Rural UT to Reedy Fork 0.1 50ft Project Description Proposed Project Cape FearRiver Basin(s): City/Town: 0.1 Typical Cross Section Description: Surrounding Land Use: General Project Narrative: (Description of Minimization of Water Quality Impacts) No gcail@ncdot.gov Address: 10/2/2018 Guilford Galen Cail Raleigh, NC 27610 WBS Element: Culvert ReplacementWBS Element: NCDOT Contact: (919) 707-6711 Contractor / Designer: North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Project Type: 1020 Birch Ridge Address: General Project Information 17BP.7.C.17 Impairments: Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.) Culvert project will replace existing 1 @ 6' x 4.3 tile arch culvert with a 1 @ 87" x 67" corrugated aluminum alloy pipe arch w/ headwall on SR 2735 (Sockwell Rd). Armor stream banks with rip rap for stabilization. Existing pipe is perched at outlet. New culvert will be buried below stream bed with inlet and outlet sills. Existing fill slopes are very steep and unstable. New slopes will be flatter 2:1 grassed slopes. Jordan LakeBuffer Rules in Effect: 540 11 ft lanes w/ 6 ft grassed shoulders Waterbody Information 2018 NCDWR Stream Index No.: NRTR Stream ID: Annual Avg Daily Traffic (veh/hr/day): Existing Site Project Length (lin. miles or feet): ac. Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body ac. 11 ft lanes w/ 3' grassed shoulders 540 Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)