HomeMy WebLinkAbout20201735 Ver 1_Pre-Filing Meeting Request_20201111ID#* 20201735
Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 11/11/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jon Swaim
jon.swaim@mcgillassociates.com
Boiling Spring Lakes Dam Construction/Reconstruction
City of Boiling Spring Lakes
Brunswick
Street Address
1013 State Farm Road
Address Line 2
aty
Boone
Postal / Zip Code
28607
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Robb Mairs
Please give a brief project description below.
The City of Boiling Spring Lakes is in the early stages of repairing
four dams within the Boiling Springs Lake system. The lake system
consists of four existing dam sites — Sanford Dam, Pine Lake Dam,
Upper Dam, and North Lake Dam (see attached Map). The four dams
were breached and/or outlet structures were damaged during
Hurricane Florence in September of 2018. Proposed plans will involve
repair and/or replacement of earthen dams, concrete risers, and
other infrastructure.
Please give a couple of dates you are available for a meeting.
11 /16/2020
11 /23/2020
11 /30/2020
Please attach the documentation you would like to have the meeting about.
Project Map.pdf 625.04KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/11/2020
0. y..
la
� ,z I - .11•�l -ti �. r5. � - 1 1 �
•North Lake 4
- . . .1 AN
Ilk
AP
Op
Pine Lakea ... }. 4Lal
Dam
Water Syrface
1 Ft
MSL
IrO
law
ode
Elev. 38.0 Ft
MSL
je
Lg
fAl