Loading...
HomeMy WebLinkAbout20050844 Ver 2_Application Returned_20100922NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary September 22, 2010 Richard A. Lipsey 6823 Exchequer Drive Baton Rouge, LA 70809 Subject: Return of Application 401 Water Quality Certification Lipsey Water Facility DWQ Project # 05-0844 V 2 Macon County Dear Mr. Lipsey: The Division of Water Quality (DWQ) has reviewed the most recent application submittal, dated June 24, 2010, for the subject project. The requisite information required to complete the review process was not included. Therefore, the project application is considered incomplete and inadequate for review by the Division of Water Quality (DWQ). Please note: No impacts associated with the subiiect project are approved at this time. To pursue the project further, a new Pre-Construction Notification (PCN) and applicable fee will be required. Prior to resubmitting a PCN for this project, it is recommended you utilize the 401 Oversight/Express Permitting PCN Submittal Checklist. This document provides a comprehensive list of submittal requirements and is available from the DWQ website: littp:Hportal.ncdeiir.orWweb/wq/swp/ws/40 1/certsandpermits/apply/forms. Upon receipt of a complete application along with the applicable fee, the DWQ will promptly review the package and respond accordingly. Please call Chuck Cranford 828-296-4664, if you have any questions. Sincerely, 4 Roger C. Edwards, Regional Supervisor Surface Water Protection Asheville Regional Office cc: John Jacobs - 543 Depot St. Franklin, NC 28734 Ronnie Dilbeck - Green Solutions Environmental (e-copy) Lori Beckwith - USACE (e-copy) David McHenry - NCWRC (e-copy) Matt Mason - Macon County (e-copy) Ian McMillan - 401 Permitting Unit ARO File copy S:\SWP\Macon\401s\Non-DOT\Lipsey Water Facility\RTN.9.22.10.doc