Loading...
HomeMy WebLinkAbout490008_Compliance Evaluation Inspection_20201210Type of Visit: QXompliance Inspection 0 Operation Review 0 Structure Evaluation p Technical Assistance Reason for Visit: C'Routine 0 Complaint ® Follow-up ® Referral O Emergency ® Other O Denied Access Date of Visit: Z - t, ®Arrival Time: Departure Time: /y County: Farm Name: o>'� Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: &Ld Certified Operator: Sack -up Operator: Location of Farm: AFL V�ooog Title: Latitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Phone: Integrator: Certification Number: Certification Number: Longitude: Region: ® Yes to ❑ NA ❑ NE ❑ Yes No ❑ NA ® NE ❑ Yes ❑ No ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ® Yes ® No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ET<o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes 010 ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: - Date of Inspection: L 7® Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ED/No a. If yes, is waste level into the structural freeboard? ❑ Yes [-]No Identifier: ❑NA ❑NE ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Spillway?: Designed Freeboard (in): 2 S-, Observed Freeboard (in): �4_® 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes dNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes LJ No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes dNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [E(No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes EJ/No ® NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ® NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [D/No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes gNo ❑ NA ❑ NE ❑ Yes E3�No ❑ NA ❑ NE ❑ Yes 6/No ❑ NA ❑ NE [:]Yes dNo [:]Yes [:]10 ❑ Yes E(No ❑ Yes Q No ❑NA NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ® Yes EfNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 6No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes [:]No ❑ NA E f NE Page 2 of 3 21412015 Continued Facility Number: - Date of Inspection: / CT 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No [3 NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [:]Yes ®No ONA ® NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes �No NA ❑ NE [:]Yes No ® NA ® NE ❑ Yes r� No ❑ NA ❑ NE [:]Yes ®No ❑ NA [--KIE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ENo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes �No ❑ NA ❑ NE Reviewer/Inspector Name: r lei Phone: / J t ` 701 —00_,� Reviewer/Inspector Signature: Page 3 of 3 Date: 21412015