HomeMy WebLinkAbout490008_Compliance Evaluation Inspection_20201210Type of Visit: QXompliance Inspection 0 Operation Review 0 Structure Evaluation p Technical Assistance
Reason for Visit: C'Routine 0 Complaint ® Follow-up ® Referral O Emergency ® Other O Denied Access
Date of Visit: Z - t, ®Arrival Time: Departure Time: /y County:
Farm Name: o>'� Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative: &Ld
Certified Operator:
Sack -up Operator:
Location of Farm:
AFL V�ooog
Title:
Latitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Region:
® Yes to ❑ NA ❑ NE
❑ Yes No ❑ NA ® NE
❑ Yes ❑ No ❑ NA ❑ NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ® Yes ® No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ET<o ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes 010 ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facility Number: - Date of Inspection: L 7®
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ED/No
a. If yes, is waste level into the structural freeboard? ❑ Yes [-]No
Identifier:
❑NA ❑NE
❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Spillway?:
Designed Freeboard (in): 2 S-,
Observed Freeboard (in): �4_®
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes dNo ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes LJ No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes dNo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [E(No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes EJ/No ® NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ® NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [D/No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ Yes gNo ❑ NA ❑ NE
❑ Yes E3�No ❑ NA ❑ NE
❑ Yes 6/No ❑ NA ❑ NE
[:]Yes dNo
[:]Yes [:]10
❑ Yes E(No
❑ Yes Q No
❑NA NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ® Yes EfNo ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections [:]Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 6No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes [:]No ❑ NA E f NE
Page 2 of 3 21412015 Continued
Facility Number: - Date of Inspection: / CT
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No [3 NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [:]Yes ®No ONA ® NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes �No NA ❑ NE
[:]Yes No ® NA ® NE
❑ Yes r� No ❑ NA ❑ NE
[:]Yes ®No ❑ NA [--KIE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ENo ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes �No ❑ NA ❑ NE
Reviewer/Inspector Name: r lei
Phone: / J t ` 701 —00_,�
Reviewer/Inspector Signature:
Page 3 of 3
Date:
21412015