Loading...
HomeMy WebLinkAboutSW6201202_Calcs (Ditch)_202012101691- Faithwill Farms Subdivision Ditch Calculations Q = 2.53 cfs Ditch #1 Ditch #5 Road A Sta. 4+00 to 8+00 right Road A Sta. 2+50 to 4+00 left Tc = 31.6 min; use 30 min Tc = 5 min Kerby: L = 430 If; s = 0.005; n = 0.4 DA = 0.12 ac DA=1.22ac C=0.8 C=0.45 1=7.90in/hr I = 3.86 in/hr Q = 0.76 cfs Q = 2.12 cfs Ditch #6 Ditch #2 Road A Sta. 0+00 to 2+50 left Road A Sta. 2+50 to 4+00 right Tc = 5 min Tc = 21.7 min; use 15 min DA = 0.15 ac Kerby: L = 191 If; s = 0.005; n = 0.4 C = 0.8 DA = 0.51 ac I = 7.90 in/hr C = 0.45 1 = 5.33 in/hr Q = 0.95 cfs Q = 1.22 cfs Ditch #7 Ditch #3 Tc = 30 min Road A Sta. 0+00 to 2+50 right DA = 3.60 ac C = 0.45 Tc = 45 min I = 3.86 in/hr DA = 3.09 ac C=0.45 Q=6.25cfs I = 3.19 in/hr Ditch #8 Q = 4.44 cfs Tc = 45 min Ditch #4 DA = 4.25 ac Road A Sta. 4+00 to 8+00 left C = 0.45 1 = 3.19 in/hr Tc = 5 min DA=0.40 Q=6.10cfs C=0.8 1 = 7.90 in/hr Koaa H Jia. 4+uu io zS+uu leii U = u.45 I = 3.19 in/hr Tc = 5 min DA=0.40 Q=6.10cfs C=0.8 1 = 7.90 in/hr Koaa H Jia. 4+uu io 6+uu leii u = u.4.7 I = 3.19 in/hr Tc = 5 min DA=0.40 Q=6.10cfs C=0.8 1 = 7.90 in/hr Koaa H Jia. 4+uu io 6+uu leii u = u.4.7 I = 3.19 in/hr Tc = 5 min DA=0.40 Q=6.10cfs C=0.8 1 = 7.90 in/hr Koaa H Jia. 4+uu io 6+uu leii u = u.4.7 I = 3.19 in/hr Tc = 5 min DA=0.40 Q=6.10cfs C=0.8 1 = 7.90 in/hr Koaa H Jia. 4+uu io 6+uu leii u = u.4.7 I = 3.19 in/hr Tc = 5 min DA=0.40 Q=6.10cfs C=0.8 1 = 7.90 in/hr