HomeMy WebLinkAbout310386_30 day poa_20201209PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-386
Facility Name:
Certified Operator Name:
County: Dupl i n
William Edward Brock Farm
Melissa Wallace Operator #: AWA 17319
lagoon to the lowest point on the top of the dam for lagoons without spillways; and from
the current liquid level in the lagoon to the bottom of the spillway for lagoons with
spillways.
Structure 1
Lagoon Name (ID): 1
Spillway (Yes or No): No
Level (inches): 16"
2. Check all applicable items
Structure 2 Structure 3 Structure 4
E
me
24"
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions per mi t
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Emily Brock Phone:
Facility Owner/Manager (print)
Date:
Facility Owner/Manager (signature)
Cover Page Edward Brock Farm (31-386) PoA30day (12-9-20)
(910) 271-1746
12/9/2020
Page 1 of 1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: William Edward Brock Farm (1) 31-386
line m = 300.9
-lb PAN
2.
Structure ID: William Edward Brock Farm (2) 31-386
line m = 309.9
-lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 610.8 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
4776-1
1
Small Grain Overseed
1.76
30.00
52.8
10/1 - 3/31
4776-1
2
Small Grain Overseed
2.31
30.00
69.3
10/1 - 3/31
4787-2
3
Small Grain Overseed
2.49
30.00
74.7
10/1 - 3/31
4787-2
4
Small Grain Overseed
2.32
30.00
69.6
10/1 - 3/31
4787-2
5
Small Grain Overseed
1.30
30.00
39.0
10/1 - 3/31
4787-2
6
Small Grain Overseed
1.28
30.00
38.4
10/1 - 3/31
4787-4
7
Small Grain Overseed
1.94
30.00
58.2
10/1 - 3/31
4787-4
8
Small Grain Overseed
1.92
30.00
57.6
10/1 - 3/31
4787-4
9
Small Grain Overseed
2.38
30.00
71.4
10/1 - 3/31
4787-4
10
Small Grain Overseed
1.72
30.00
51.6
10/1 - 3/31
4776-4
11
Small Grain Overseed
3.92
30.00
117.6
10/1 - 3/31
4776-4
12
Small Grain Overseed
3.84
30.00
115.2
10/1 - 3/31
4776-4
13
Small Grain Overseed
2.48
30.00
74.4
10/1 - 3/31
4776-4
14
Small Grain Overseed
2.93
30.00
87.9
10/1 - 3/31
4776-4
15
Small Grain Overseed
3.29
30.00
98.7
10/1 - 3/31
4776-4
16
Small Grain Overseed
0.75
30.00
22.5
10/1 - 3/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1098.9 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 610.8 Ib. PAN
x. Crop's remaining PAN balance (line v from section III) = 1098.9 Ib. PAN
y. Overall PAN balance (w - x) _ -488 Ib. PAN
Summary Edward Brock Farm (31-386) PoA30day (12-9-20) Page 1 of 2
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based
on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
This is update to PoA dated 11-13-20. Waste will be applied as soon as weather permits.
Summary Edward Brock Farm (31-386) PoA30day (12-9-20) Page 2 of 2
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I William Edward Brock Farm (1) 31-386
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 3.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 64,476 ft2
e. line c/12 x line d x 7.48 gallons/ft3 140,665 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 71,210 ft3
h. current herd # 2,160 certified herd # 2,160
actual waste produced = current herd # x line g = 71,210 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 39,463 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 137,972 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 11/5/2020 1.08 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 300.9 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 1 Edward Brock Farm (31-386) PoA30day (12-9-20) Page 1 of 1
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I William Edward Brock Farm (2) 31-386
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 24.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 27.0 inches
c. line b - line a (inches in red zone) = 3.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 90,8161 ft2
e. line c/12 x line d x 7.48 gallons/W 169,826 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 79,123 ft3
h. current herd # 2,400 certified herd # 2,400
actual waste produced = current herd # x line g = 79,123 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 67,095 ft3
k. (lines h + i +j) x 7.48 x 30 days/line f= 182,285 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 11/5/2020 0.88 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 309.9 Ibs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 2 Edward Brock Farm (31-386) PoA30day (12-9-20) Page 1 of 1