Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8010127_Current Permit_20121210
NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman Governor Director Secretary December 10, 2012 Herbert E. Walton, Jr., Manager Skyway Investments, LLC 3602 Owencroft Ct. Wilmington, NC 28409 Subject: Name Change I Ownership Change Authur Howard Site Stormwater Permit No. SW8 010127 New Hanover County Dear Mr. Walton: On November 15, 2012, the Wilmington Regional Office received a request to change the address and the signing officials name of the Stormwater Management Permit for the subject project. By acknowledging receipt of the permit, and by signing the Name/Ownership Transfer form, you have accepted the responsibility for complying with the terms and conditions outlined in this permit. If you need additional copies of the permit, or copies of the approved plans, please contact the Division of Water Quality in the Wilmington Regional Office at the phone number below. For your records, please find enclosed a copy of the updated page 2 of the permit, and a copy of the Name/Ownership Change form submitted on November 15, 2012. Please be aware that the project's built -upon area and stormwater controls must be built and maintained in compliance with the permit documents and the approved plans. Maintenance of the approved system shall be performed in accordance with the signed Operation and Maintenance agreement. Any modifications to this project must be submitted to the Division of Water Quality and approved prior to construction. The issuance of this approval does not preclude you from complying with all other applicable. statutes, rules, regulations or ordinances, which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning the requirements of the permit, please do not hesitate to call David Cox at (910) 796-7215. Sincerely, r 57,n Charles Wakild, P.E., Director Division of Water Quality CW/GDS/ dwc: S:1WQS\Stormwater\Permits & Projects120011010127HD1201212 permit 010127 cc: Daniel B. Huggins Wilmington Regional Office Stormwater File Wilmington Regional office 127 Cardinal Drive ExterWon, Wilmington, North Carolina 28405 We Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance:1-877-623-6748 NofthCarolina Internet: www.navateryualittr.org 9,��lif� An Equal Opportunity 1 Affirmative Adon Employer A��A State Stormwater Management Systems Permit No. SW8 010127 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Skyway Investments, LLC Arthur Howard Site 3602 Owencroft Ct., Wilmington, New Hanover County FOR THE operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H A 000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 2, 2015 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 93,371 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The runoff from all onsite and offsite built -upon area permitted with this project must be directed into the permitted stormwater control system. 2 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STATE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I. CURRENT PERMIT INFORMATION.. 1 Stormwater Management Permit Number: .2 Project Name; 3. Current Permit Holder's Company Name/Organization: Sky WA`.f LLC. 4. Signing Official's Name: I'ANteu iqs ; LJ:I�G& mr Title: "jy&aek 5. Mailing Address: 4?-IR V LkA71,C l-Ai L ilk• City: W t LA& tN &7t0�J State: 9C Zip: 2-8, 4ti 6. Phone: { qLO) 3 q S- l Fax: �''i( I O ) +Sa —`-4 �Le II. PROPOSED PERMITTEE / OWNER / PROJECT / ADDRESS INFORMATION This request is for: (please check ali that apply) Ul"'Name change of the owner (Please complete Items 1, 2 and 3 below) ❑ Name change of project (Please complete Item 5 below) 0 Change in ownership of the property/company (Please complete Items 1, 2, 3, and 4 below) ❑'Mailing address / phone number change. (Please complete Item 4 below) 0 Other (please explain): 1. Proposed permittee's company name/organization: _5:V_k WAV (N v 3tALC-VJ'ZS, LC.0 2. Proposed permittee's signing official's name: 1+EgA 1R7 3. Proposed permittee's title: AA_ A?JA G EV_ 4. Mailing Address: ©2 o wL-tj cxo I<T t-. City: W t LKLO L,Za 0 State: CL Zip: "2R 40 9 Phone: 0I( i 0) 3 c'9_•-6 q92- Fax: (mil 10)_ 9 7 -7 4 3 4 5. New Project Name to be placed on permit: 1 i Please check the appropriate box. The proposed permittee listed above is: ❑ HOA or POA (Attach documentation showing that the HOA or POA owns, controls, or has a recorded easement for all areas that contain stormwater system features. Print name of HOA or POA in #1 above and provide name of HOA/POA's authorized representative in #2 above) [W]'rhe property owner ❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on page 4) ❑ Purchaser (Attach a copy of the pending sales agreement. Final approval of this transfer will be granted upon receipt of a copy of the recorded deed) ❑ Developer (Complete Property Owner Information on page 4) ECEIVE' SSW N/O Change Rev24Sept2012 Page 1 of 4 NOV 15 201 BY: III. REQUIRED ITEMS A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all of the applicable required items listed below are included with the submittal. Failure to provide the listed items may result in processing delays or denial of the transfer. 1. This completed and signed form. This certification must be completed and signed by both the current permit holder and the new applicant if this is a change of ownership. 2. Legal documentation of the property transfer to a new owner. 3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit. 4. The designer's certification (DIWO Engineer and Designer Certification Forms are availabie from each DWQ Regional office), if required by the permit and if not already submitted to DWQ. 5. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability company, or other corporate entity, provide documentation showing the authority of the named representative to act on behalf of the proposed permittee. 6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing fee is not required. Subsequent ownership transfers will require the $40.00 processing fee. IV. CURRENT PERMITTEE'S CERTIFICATION Please check one of the following statements and fill out the certification below that statement. ❑ Check here if the current permittee is only changing his/her/its name, the project name, or mailing address, but will retain the permit. I, , the current permittee, hereby notify the DWQ that I am changing my name and/or I am changing my mailing address and/or I am changing the name of the permitted project. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge: I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. [B""Check here if current permittee is transferring the property to a new owner and will not retain ownership of the permit. I, tea.- A , WG6 I,0S the current permittee, am submitting this application for a transfer of ownership for permit # , W 61 fl 1X7 . I hereby notify DWQ of the sale or other legal transfer of the stormwater system associated with this permit. I have provided a copy of the most recent permit, the designer's certification for each BMP, any recorded deed restrictions, covenants, or easements, the DWQ approved plans and/or approved as -built plans, the approved operation and maintenance agreement, past maintenance records, and the most recent DWQ stormwater inspection report to the proposed permittee named in Sections II and V of this form. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. I assign all rights and obligations as permittee to the proposed permittee named in Sections II and V of this form. I understand that this transfer of ownership cannot be approved by the DWQ unless and until the facility is in compliance with the permit. n Signature: `t Date: l (- C3--17- a Notary Public for the State of County of{.��¢,�,a , do hereby certify that personally appeared before me this the P3 day of f,%���. �e z , 20-L-2, , and acknowledge the due execution of the forgoing instr Wit ess my hand and official seal, ( +� Ne$OMWatdfe SSW N/O Change Rev24Sept2012 a of 4 2012 6Y: — O/Vo ok G e�� V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permittee for all transfers of ownership) �1 I, eR7 L-::- 7 -, LAAL:70,0 t 'Jk. , hereby notify the DWQ that I have acquired through sale, lease or legal transfer, the responsibility for operating and maintaining the permitted stormwater management system, and, if applicable, constructing the permitted system. I acknowledge and attest that I have received a copy of: (check all that apply to this permit) 9 the most recent permit the designer's certification for each BAIIP ❑ any recorded deed restrictions, covenants, or easements ❑ the DWQ approved plans and/or approved as -built plans ❑ the approved operation and maintenance agreement p� f�ast maintenance records from the previous permittee (where required) LI DWQ stormwater inspection report showing compliance within 90 days prior to this transfer I have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not incl ded, this applic ' n pa age will be returned as incomplete. C74Signature: Date: it 3 a Notary Public for the State of County of �. /.�,.,�., ,�,� , do hereby certify that w`A1.-ryoa. , ITZ . personally appeared before me this the f day of �% �.�,.n , 20 a -L-, and acknowl d execution of the .f forgoing ins ument. Witness my hand and official seal, G 0 OTAAY "441 4Notaty Seal) N ot"rfafur "U130a z, ti �y�I OVER 09 Additional copies of the original permit and the approved Operation and Maintenance agreement can be obtained from the appropriate Regional Office of the Division of Water Quality. This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural Resources, Division of Water Quality, as shown on the attached map. Please note that if the Proposed Permittee listed above is not the property owner, the property owner must complete and sign page 4 of this document. Both the lessee / developer and the property owner will appear on the permit as permittees. CIV SSW N/O Change Rev24Sept2012 Page 3 of 4 NOV 15 2012 BY; VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION C N (A If the Proposed Permittee listed in Sections Il and V of this form is not the Property Owner, the Property Owner must provide his/her Contact Information below and sign this form: Printed Name: Organization: Title within the Organization: Street Address: City: Mailing Address: City: _ Phone: Email: State: (if different from street address) State: Fax: Zip: Zip: I certify that I own the property identified in this permit transfer document and have given permission to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy of the lease agreement or other contract, which indicates the party responsible for the construction and/or operation and maintenance of the stormwater system, has been provided with the submittal. As the legal property owner I acknowledge, understand, and agree by my signature below, that I will appear as a permittee along with the lessee/developer and I will therefore share responsibility for compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a developer, lessee or purchaser for the property. I understand that failure to operate and maintain the stormwater treatment facility in accordance with the permit is a violation of NC General Statute (NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature of the property owner County of Date: a Notary Public for the State of do hereby certify that personally appeared before me this the day of , 20 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, Notary Signature SSW N/O Change Rev248ept;2012 Page 4 of 4 (Notary Seal) 1ECEIVE ; NOV 15 2012 BY: o�oF wArFgpG r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources —I Alan W. Klimek P.E.,Director '< Division of W ater Quality Coleen H. Sullins, Deputy Director Division of Water Quality April 16, 2004 Mr. Peter Davis, Owner 5613 Greenville Loop Road Wilmington, NC 28409 Subj ect: Permit No. SW8 010127 Mod Arthur Howard Site High Density Stormwater Project Dear Mr. Davis: New Hanover County The Wilmington Regional Office received a complete application requesting a name/ownership change of Stormwater Management Permit SW8 010127 for Arthur Howard Site on March 23, 2004. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 010127 dated April 16, 2004, for the construction of Arthur Howard Site. This permit shall be effective from the date of issuance until March 2, 2011, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The following changes were made to the permit: Ownership Change Information Existing New Owner Mr. Arthur L. Howard Peter Davis Signing Official Mr. Arthur L. Howard, Owner Mr. Peter Davis, Owner Mailing Address 9029 St. Stephens Place 5613 Greenville Loop Road Wilmington, NC 28412 Wilmington, NC 28409 N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer service A My Wilmington Regional office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 State Stormwater MaLgement Systems Permit No. SW'8 010127 If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/rbh: S:\WQS\STORMWAT\PERMIT\010127.APR04 cc: Phil Tripp, P.E. Tony Roberts, New Hanover County Inspections Beth Wetherill, New Hanover County Engineering Rhonda Hall Wilmington Regional Office Central Files 0j, State Stormwater Management Systems Permit No. SW8 010127 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Peter Davis New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 2, 2011 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 93,371 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The runoff from all onsite and offsite built -upon area permitted with this project must be directed into the permitted stormwater control system. 3 State Stormwater Management Systems Permit No. SW8 010127 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Stream/Index #: Classification of Water Body: If Class SA, chloride sampling result Pond Depth, feet: Permanent Pool Elevation, FMSL: Drainage Area, acres: Total Impervious Surfaces, ft2: Offsite Area entering Pond, ft2: Required Surface Area, ft2: Provided Surface Area, ft2: Required Storage Volume, ft3: Provided Storage Volume, ft3: Temporary Storage Elevation, FMSL Controlling Orifice: DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Arthur Howard Site SW8 010127 New Hanover County Mr. Peter Davis, Owner Peter Davis 5613 Greenville Loop Road Wilmington, NC 28409 March 1, 2001 March 23, 2004 Cape Fear River / CFR 18-71 VISC 11 s: n/a 7.50 14.50 3.15 93,371 none, per Engineer 3,049 4,054 7,575 10,143 16.50 1.25" cp pipe 4 State Stormwater Management Systems Permit No. SW8 010127 II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriatc designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. A modification must be permitted prior to any construction. The following items will require a modification to the permit. The Director may determine that other revisions to the project should require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition,,or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum often years from the date of the completion of construction. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the pemitted amount, a modification to the permit must be submitted and approved prior to construction. 5 State Stormwater Management Systems Permit No. SW8 010127 12. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 13. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as maybe appropriate. The approval of this request will be considered on its merits and mayor may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Permit issued this the 16a' day of April, 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION �-. C= -Y Alan W. ek, P.E. Director I-19A Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 010127 Cal State Stormwater Management Systems Permit No. SW8 010127 Arthur Howard Site Stormwater Permit No. SW8 010127 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 7 State Stormwater Management Systems Permit No. SW8 010127 Certification Requirements: The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approvcd plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspector 0 r . State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quailty , -,. &W"f NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES WATER QUALITY SECTION COASTAL STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM L CURRENT PERMIT INFORMATION: Stormwater Management Permit Number: SW8 010127 1 2. 3 2. 3 Permit holder's name: Mr. Arthur L. Howard Permit's signing official's name and title: Mr. Arthur L. Howard (Person legally responsible for permit) Owner (Title) Mailing address: 9029 St. Stephens Place City: Wilmington State: NC Zip Code: 28412 Phone: 910-343-5600 FAX: (Area Code and Number) NEW OWNER/NAME INFORMATION: This request is for: X a. b. C. Change in ownership of property/company Name change of project or company. Other (please explain): New owner's name (name to be put on permit): Peter Davis (Area Code and Number) New owner's signing official's name and title: Peter Davis (Person legally responsible for permit) Owner (Title) 4. Mailing address: 5613 Greenville Loop Road City: Wilmington State: NC I Zip Code: 28409 Phone: 910-262-9925 FAX: (Area Code and Number) (Area Code and Number) PERMIT NAME / OWNERSHIP CHANGE FORM THIS APPLICATION PACKAGE WILL NOT BE ACCEPTED BY THE DIVISION OF WATER QUALITY UNLESS ALL OF THE APPLICABLE ITEMS LISTED BELOW ARE INCLUDED WITH THE SUBMITTAL. REQUIRED ITEMS: 1. This completed application 2. Legal documentation of the transfer of ownership 3. A copy of the recorded deed restrictions, if required by the permit. 4. The engineer's certification, if required by the permit. 5. A signed Operation and Maintenance plan, if a system that requires maintenance will change ownership. CERTIFICATION MUST BE COMPLETED AND SIGNED BY BOTH THE CURRENT PERMIT HOLDER AND THE NEW APPLICANT IN THE CASE OF CHANGE OF OWNERSHIP. FOR NAME CHANGES, COMPLETE AND SIGN THE CURRENT PERMITTEE'S CERTIFICATION. Current Permittee's Certification: I, :'9 AT H C4 & L - HO tj ^ R,0 attest that this application for name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature: Date: 3 -o?3 -o V Applicant's Certification: attest that this application for a namelownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature: Date: THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDDRESS: North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 ATTN: Linda Lewis State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may he photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Arthur L. Howard 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Arthur L. Howard, Owner 3. Mailing Address for person listed in item 2 above: 9029 St. St hens Place City: Wilmin n State: NC Zip: 28412 'telephone Number: 910-343-5600 4. Project Name (subdivision, facility, or establishment name —should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Arthur Howard Site 5. Location of Project (street address): Sunn ale Drive City: Wilmington County: New Hanover 6. Directions to project (from nearest major intersection): approx. 2501f west from the intersection of SR 1236 and SR 1100 7. Latitude : N 34010'15" Longitude: W 77°57'00" of project 8. Contact person who can answer questions about the project: Name: Phillip G.Trio Telephone Number: 910-763-5100 II. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list The existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other �. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control 404//401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. stormwater detention pond 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: 3.15 acres 5. How many drainage basins does the project have? 1 4. Project Built Upon Area: 68.0 %. 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Receiving Stream Name Unnamed trib. toCape Fear River Receiving Stream Class Sc Drainage Basin Area 137,214 sf Existing Impervious * Area 0 Proposed Impervious * Area 93,371 sf % Impervious* Area (total) 75.8% On -site Buildings 33,800 sf On -site Streets 0 On -site Parking 57,871 sf On -site Sidewalks 1700 sf Other on -site 0 Off -site 0 Total: E=93,371 sf E_ impervious area is aejinea as we milt upon area including, but not limited to, buildings, roads, parking areas sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the oil site impervious area listed above derived? IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number - as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than - square feet of any lot shall be covered by structures of impervious materials. Impervious materials include asphalt, gravel, concrete, brick stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. S. All permitted rungfffrom outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted By your signature below, you certify that the .recorded deed restrictions and protective covenants for this protect shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for the status and availability of these forms. Form SWU-102 Form SW-103 Form SWU-104 Form SWU-105 Form SWU-106 Form SWU-107 Form SWU-108 Form SWU-109 Wet Detention Basin Supplement Infiltration Basin Supplement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Underground Infiltration Trench Supplement Neuse River Basin Supplement Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 r. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Appli's Initials • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number and date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwater control measures Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Tripp Engineering, P.C. Mailing Address: 419 Chestnut Street City: Wilmington State: NC Zip: 28401 Phone: (910) 763-5100 VIII. APPLICANT'S CERTIFICATION Fax: (910) 763-5631 I, (print or type name of person listed in General Information, item 2) Arthur L. Howard certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signature: Z� "r:.Z Date: Form SWU-101 Version 3.99 Page 4 of 4 Permit No. J Sb/D/ Zq (to be provided by DWJ State of North Carolina Department of Environment and Natural Resources Division of Water Quality STOR1AIK.TER MANAGE MIj—, PERK UT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review• A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Arthur Howard Site Contact Person: Phillip U. Tri Phone Number: 910 763-5100 For projects with multiple basins, specify which basin this worksheet applies to: I elevations Basin Bottom Elevation 7.0 ft. (floor of the basin) Permanent Pool Elevation 14.5 ft. (elevation of the orifice) Temporary Pool Elevation 16.5 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 4 054 sq.ft. (water surface area at the orifice elevation) Drainage Area 3.15 ac. (on -site and off -site drainage to the basin) Impervious Area ^2.14 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 16,185 _ cu.ft. (combined volume of main basin and forebay) Temporary Pool Volume 10.143 cu.ft. (volume detained above the permanent pool) Forebay Volume 2.958 cu.ft. (approximately 20% of total volume) Other parameters SA/DAi 0.0280 _ (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1.25 in. (2 to 5 day temporary pool draw -down required) Design Rainfall I in Design TSS Removal' 90 % (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: 1. When using the Division SA/DA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Appli�,nts Initials �J a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the total basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. NA e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations). f. The basin length to width ratio is greater than 3: 1. g. The basin side slopes above the permanent pool are no steeper than 3: 1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. ' 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior'to use as a wet detention basin m. A mechanism is specified which will drain the basin for maintenance or an emergency. M. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) ❑ does X does not incorporate a vegetated filter at the outlet. This system (check one) ❑ does X does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 scJg dl U/ Z 7p- I. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) ❑ does X does not incorporate a vegetated filter at the outlet. This system (check one) ❑ does X does not incorporate pretreatment other than a forebay. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.625 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 14.5 Sediment moval EL 12.25 75 a -------------- - Sediment Removal Elevation 9.975 75% Bottom evation 11.5 %--------------------------------------------125-14 ---- Bottom Elevation 7.0 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent possible. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Peter Davis Title: Owner Address: 5613 Greenville Loon Road Wilmington NC 28409 Phone: Signatu Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, Della C. Baird , a Notary Public for the State of North Carolina , County of Pender do hereby certify that Peter Davis personally appeared before me this OZ, day of 2004�, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, /7y�_C EGiuo( 0c"' ? �: �1pTgRy90�'• pUBL10 Z•Gi` SEAL My commission expires 10/15/06 Arthur Howard Site f New Hanover County Stormwater Permit No. SW8 010127� Designer's Certification I, 1. awr encg= j�. �P ��� ,as a duly registered Pam. Pfs�6n� �� H� in the State of North Carolina, having been authorized to observe (periodically full time) the construction of the project, (Project) for 44,,, Ho-ya-,t4 (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Required Items to be checked for this certification to be considered complete are on page 2 of this form. Noted deviations from approved plans and specifications: Signature Registration Numbe 030 S 7 Date y SEAL �4R' `, • 9,rox.wn,yc � `'Pd SEAL 030589 cc: NCDENR DWQ Wilmington Regional Office DEC 1'5 2010 Page 1 of 2 ,Arthur Howard Site New Hanover County Stormwater Permit No. SW8 010127 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. f 2. The drainage area to the system contains no more than the permitted amount of built -upon area. J3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. f 5. The outlet structure is located per the approved plans. f 6. Trash rack is provided on the outlet/bypqss structure. 7. All slopes are grassed with permanent vegetation. 3. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been / provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, Jand a forebay. 14. The dimensions of the system, as shown on the approved plans, are provided. /7 rf/m//v DEC 14 2010 Page 1 of 2