Loading...
HomeMy WebLinkAbout20201276 Ver 1_Revised Buffer Impact Table PCN_20201208Page 5 of 10 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavat ed Flooded P1 Choose One P2 Choose One 5f. Total 0 0 0 0 0 0 0 5g. Comments: This project does not propose Pond or Lake construction 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6.Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Catawba Randleman Other: 6b. Buffer impact number – (P)or (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) A1 – P Road Crossing Stream B No 4,864 0 A2 – P Road Crossing Stream B No 0 3,243 A3 – T Road Crossing Stream B No 1,360 0 A4 – T Road Crossing Stream B No 0 805 B1 – T Grading Stream B No 0 225 B2 – P Grading Stream B No 116 0 C1 – P Road Crossing Stream C No 1,001 0 C2 – P Road Crossing Stream C No 2,025 0 C3 – T Road Crossing Stream C No 362 0 C4 – T Road Crossing Stream C No 0 314 6h. Total buffer impacts 9,728 4,587 6i. Comments: Total permanent Zone 1 impacts = 8,006 sf, total permanent Zone 2 impacts = 3,243 sf, total temporary Zone 1 impacts = 1,722 sf, and total temporary Zone 2 impacts = 1,344 sf