Loading...
HomeMy WebLinkAbout20201305 Ver 1_Design/Maps/Site Plans_20201210⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊ ⅊ ⅊ ⅊LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODSF SF SF SF SF SF SFSF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFJHSFOJH SFO JHSFOJHSFOJHSFOJHSFOJH SF SFSFO TBTB 5+20.70 0+001+00 2+00 3+00 4+00 5+00 SCWC WCSCWC21'50'50'10'12' (TIE POINT TO WETLAND)10'18'11'40'10' (TIE POINT TO WETLAND)1251251301301351351401401 4 5 14 5150155 1 2 5 125 1 2 5 1 2 5 125 1 25 13013013513514 0 14014514515015015515530'110 120 130 140 150 110 120 130 140 150 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+005+02WETLAND ENDEXISTING GRADE 5' MIN 5' MIN 4' TIE-IN FIELD VERIFY 3' TIE-IN FIELD VERIFY 1+27STREAM CL0+17WETLAND START2+29 TOP OF BANK 2+39 EDGE OF WATER 2+44CREEK CL2+51 EDGE OF WATER 2+59 TOP OF BANK PVI 2+26 4° PVI 2+72 2° 14' DESCRIPTIONNO.REVISION(S) DESCRIPTION BY CHK APPDDATE DRAWING BY SHEET(S)DWG SCALE DWG DATE INITIALSDATE REGIONAL ENGINEER INITIALSDATE MGR TECH REC & STD INITIALSDATE PRINCIPAL ENGINEER ACCOUNT NUMBER PROJECT NUMBER DRAWING NUMBER APPROVALS REVISION AREA CODE SUPERSEDED CHECKER INITIALS STATION ID PNG __ C-005-0001023 C OF 17 AS NOTEDLINE 5 EXPOSED MAIN REMEDIATION PROJECT ALIGNMENT PLAN AND PROFILE JOHNSTON COUNTY, NORTH CAROLINA WDM JG TO NCK JG TO IMM 231794 WDM 06/24/2020A06/29/2020 ISSUED FOR 30% REVIEW B 08/14/2020 ISSUED FOR 60% REVIEW C 09/14/2020 ISSUED FOR 90% REVIEW C:\pwworking\east01\d1668363\C-005-0001023.dwg 9/14/2020 6:29 PM PIEDMONT 'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PROFESSIONAL ENG/ARCH STAMP - - - N/A N/A N/AJG MATERIAL CLASS/MAOP CONST. METHOD OWNERSHIP PLANSTATIONINGPROFILECOR. PRO. CIVIL / GOLDSBORO / LINE 005COPYRIGHT 2018 CLASS 3 / 1000 PSIG OPEN CUT NPS 10 X 0.365WT (STD), API 5L PSL-2 X 52, FBE, ERW, BE, DM-ST-2110 GOLDSBORO, NC PNG G-005-0001022 REF. DWG(S) EDGE OF TREE LINE OSCAR J. PRUITT PIN #02K17026 SEE SHEET C-005-0001026FOR ACCESS ROAD PLANJANE ELLEN EVANS, TRUSTEE PIN #02K17027A CALLIE FRANCES LOFTON HEIRS PIN #02K17013L AGNES M. ENGLISH PIN #02K17013E MILFORD WILLIAMS, JR. PIN #02K17013J THOMAS J. WILLIAMS PIN #02K17013K 0+17 WETLAND 5+02 WETLANDEXISTING 50FT PNG EASEMENT 20FT WIDE ACCESS ROAD 1900FT TO LAYDOWN AND ALMON ROAD. SEE DETAIL ON DWG C-005-0001031 EDGE OF WETLAND EDGE OF WETLAND CENTERLINE OF STREAM CENTERLINE OF CREEK APPROX 40 FT OF PIPE TO BE RECLAIMED. SEVER AND PLATE PIPE AT LEAST 5 FT PAST TOP OF STREAM BANK EITHER SIDE, OR IN ACCORDANCE WITH COMPANY DIRECTION.SEE SHEET C-005-0001026FOR ACCESS ROAD PLAN1+27 CENTERLINE OF STREAM2+44 CENTERLINE OF CREEK3 TEMPORARY CONSTRUCTION EASEMENT2+39 EDGE OF WATER 2+51 EDGE OF WATER0+00 TIE-IN5+21 TIE-INTOP OF BANK EDGE OF WATER TOP OF BANK JG TO