Loading...
HomeMy WebLinkAboutNCG140492_Application_20201207 RECEIVED f\ &lOtt2- 'LIEC 2020 FOR AGENCY ONLY Date Received D LAN1i QUALITY Year Month Day Division of Energy, MinerAite , .+S G INP-0 (2 "1 Stormwater Program Certificate of Coverage NLCIGIiI IoI4MI2 WsIeo National Pollutant Discharge Elimination System Check# Amount Environmental NCG 140000 Permit Assigned to Quality A. Ate Lou) NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete This NOI may be an application to discharge process wastewater. NCG140000 contains effluent limitations for process wastewater discharges. Wastewater discharges must meet the requirements of these effluent limitations.An exceedance of any of these limitations will result in a violation of the permit conditions. For questions, contact the DEMLR Central Office or Regional Office in your area. (See page 8) (Please print or type) 1) Mailing address of owner/operator(official address to which all permit correspondence will be mailed): Legal Company Name McCarthy Improvement Company,Inc. (Please attach the most recent Annual Report to the NC Secretary of State showing the current legal name. Alternatively this permit can be given to an individual.) Signee's Name (as signed for in question 28 below) James Higgins Street Address 1466 Sullivan Road City Atlanta State GA ZIP Code 30337 Telephone No. (663)449-6779 Email jhiggins@mccarthyimprovement.com Alternate ContactName Mike McGunniss Email (if different) mmcginniss@mccarthyimprovement.com Alternate Contact Telephone (if different) (404)895-5229 2) Location of facility producing discharge: Facility Name McCarthy Greensboro Ohenry Blvd.Concrete Batch Plant Street Address 1-840/Ohenry Blvd.Interchange City Greensboro State NC ZIP Code 27455 County Facility Guilford County Contact James Higgins Telephone No. (563) 449-6779 Email ihiggins(c�mccarthvimprovement.(a 3) Physical location information: Please provide narrative directions to the facility(use street names, state road numbers, and distance and direction from a roadway intersection). See Attachment A (A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.) 4) Latitude 36 08'32.68"N Longitude -79 44'19:88"W (deg., min, sec or decimal) Page 1 of 8 SWU-NCG14-NOI Last revised 9/01/2017 NCG140000 N.O.I. 5) This NPDES Permit Application applies to the following (check all that apply): e New or Proposed Facility Date operation is to begin September 1,2021 ❑ Existing Facility Date operation began 6) Consultant's application information: Consultant: Jacki Congleton Consulting Firm: Terra Consulting,LLC (Optional) Mailing Address: P.O. Box 1738 Staple Business Card Here: City: Carrollton State: GA Zip Code: 30112 Phone: (770 ) 573-3055 Email: lacki@terraconsultingllc.com 7) Provide the 4 digit Standard Industrial Classification Code (SIC Code)that describes the primary industrial activity at this facility: SIC Code: 3 2 7 3 8) Provide a brief description of the types of industrial activities and products produced at this facility: (Attach a site diagram showing the process areas present at this facility.) See Attachment A and Site Mao. Stormwater Discharge, Wastewater Treatment & Discharge and Permitting Information 9) Discharge points/Receiving waters: What is the name of the body or bodies of water(creek, stream, river, lake, etc.)that the facility stormwater and/or wastewater discharges will end up in? Unnamed tributary to North Buffalo Creek To find the waterbody, please see the NC Surface Waterbody Classifications map at https://deq.nc.gov/about/divisions/water-resources/water-resources-science-data Receiving water classification(s)for the waters: WS-V; NSW If the site will discharge to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). City of Greensboro Page 2 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. List discharge points (outfalls)that convey discharge from the site (both on-site and off-site) and location coordinates. Attach additional sheets if necessary, or note that this information is specified on the site plan. Be sure to indicate a type for each outfall listed below as Stormwater only, Wastewater only or Wastewater Commingled with Stormwater Outfall No. 1 Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater � Latitude(degrees/minutes/seconds): 36°08'36.18" N Longitude(degrees/minutes/seconds): -79°44'21.91" W Outfall No. Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater Latitude(degrees/minutes/seconds): N Longitude(degrees/minutes/seconds): W Outfall No. Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater Latitude(degrees/minutes/seconds): N Longitude(degrees/minutes/seconds): W Outfall No. Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater Latitude(degrees/minutes/seconds): N Longitude(degrees/minutes/seconds): W Outfall No. Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater Latitude(degrees/minutes/seconds): N Longitude(degrees/minutes/seconds): W Outfall No. Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater Latitude(degrees/minutes/seconds): N Longitude(degrees/minutes/seconds): W Outfall No. Stormwater only ❑ Wastewater only Wastewater Commingled with Stormwater Latitude(degrees/minutes/seconds): N Longitude(degrees/minutes/seconds): W Will this facility discharge wastewater to SA(Shellfish)waters? ❑ Yes •No Note: Discharge of process wastewater to receiving waters classified as Critical Area (CA) must be reviewed by the N.C. Division of Water Resources, Public Water Supply Section ahead of approval. No new discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. You must show all discharge points clearly on the submitted site plan. Be advised that NCDEQ may require you to apply for an individual permit, based on proposed discharge rates and receiving stream conditions (low flows, impairments, etc.) Page 3 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. 10) Each applicant shall provide the following information (attach additional sheets as necessary): • Two (2) site plans depicting the facility or site with numbered outfalls which indicate stormwater and wastewater outfalls. The plans shall legibly show. at a minimum, (existing or proposed): o Outline of drainage areas with topographical lines and features o Stormwater/wastewater treatment structures o Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas) o Runoff conveyance structures o Areas and acreage where materials are stored o Impervious area acreages o Location(s) of streams and/or wetlands the site is draining to, and any applicable buffers o Site property lines, North Arrow, and bar scale o If applicable, the 100-year floodplain line o Acreage of each stormwater and wastewater topographical area o Each of the facilities' wastewater or stormwater source and discharge structures and each of its hazardous waste treatment, storage, or disposal facilities o Site location (insert) Site plans shall be 24"x 36"in size. • Line drawing and description: A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. • A narrative description and identification of each type of process,operation, or production area which contributes wastewater to the effluent for each outfall, and a description of the treatment the wastewater receives (or will receive), including the ultimate disposal of any solid or fluid wastes other than by discharge. Processes, operations, or production areas may be described in general terms (e.g. "ash silo"). 11) Does the applicant have any unresolved Notice of Violations (NOVs)? 8 No ❑ Yes Wastewater: 12) What types of wastewater does your facility generate or discharge? Type of Authorized Wastewater Generate Discharge Sent to WW Treatment System Vehicle and equipment cleaning (VE) t] ❑ Wetting of raw material stockpiles (RM) D El ❑ Mixing drum cleaning (MD) 0 ❑✓ ❑ Further explanation, if necessary: See Attachment B 13) Will your facility spray-down or actively wet aggregate piles? ❑ No Q Yes 14) Does the facility use any of the following on site? ❑ Phosphorus-containing Detergents ❑ Non-Phosphorus-containing Detergents ❑ Brighteners ❑ Other Cleaning Agents ❑ Other: NA Page 4 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. 15) Are wastewater treatment facilities planned in the 100-year flood plain? ❑� No ❑ Yes -f 16) Will your facility build a closed-loop recycle system (CLRSs)that meets design requirements in 15A 1 - NCAC 02T.1000 and hold your facilities'working volume'? ❑ yes El No If Yes, STOP COMPLETION of this permit. Contact DWR Non-Discharge Permitting Program for permitting requirements. 17) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2)for any new or expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets. a) What wastewaters were considered for this alternatives review? El VE El RM 0 MD b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one-mile radius? ❑✓ Yes ® No (1) If Yes, will the wastewater treatment plant(WWTP) accept the wastewater? ❑✓ Yes ❑ No (a) If No, please attach a letter documenting that the WWTP will not accept the wastewater. (b) If Yes, is it feasible to connect to the WWTP? Why or why not?* See Attachment A(17.b) c) Surface or Subsurface Disposal System (e.g., spray irrigation): i) Is a surface or subsurface disposal technologically feasible (possible)? El Yes ❑ No Why or Why not? See Attachment A ii) Is a surface or subsurface disposal system feasible to implement?* • Yes ❑ No Why or Why not? See Attachment A iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters?* See Attachment A. d) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound alternative of all reasonably cost-effective options of the wastewaters being considered?* • Yes 0 No i) If No, contact DEMLR's Land Application Unit to determine permitting requirements. e) If this review included all wastewater discharge types, would excluding some types (e.g. raw stockpile wetting) make any of the above non-discharge options feasible? 0 Yes El No *You may be asked to provide further information to support your answers to these questions after the initial review. Feasibility should take into account initial and recurring costs. Page 5 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. Stormwater: 18) Does this facility employ any best management practices for Stormwater control? ❑No p Yes If yes, please briefly describe: See Attachment A 19) Does this facility have a Stormwater Pollution Prevention Plan? 0 No I]Yes If yes, when was it implemented? The SPPP will be completely implemented before the commencement of operations. 20)Are vehicle maintenance activities (VMA)occurring or planned at this facility? p No ❑Yes If yes, does your VMA area discharge into your wastewater treatment device? 0 No ❑Yes Other/Permitting: 21) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit? ❑� No 0 Yes If yes, list the permit numbers for all current E&SC permits for this facility: NA 22) Is your facility subject to Phase II Post-Construction Area?p No ❑Yes If yes, who is the permitting authority? NA 23) Is your facility located in one of the 20 Coastal Counties?❑Yes ID No Is your facility adding more than 10,000 ft2 of built-upon area or CAMA Major Permit?❑ Yes 12 No 24) Is your facility discharging wastewater(treated or untreated) such as water from wetting of aggregate piles, drum rinse-out, or vehicle and equipment cleaning to a stormwater BMP? 0 No p Yes If yes, please attach your approval from the permitting authority to do so. See Attachment A 25) Does this facility have any other NPDES permits? ID No ❑Yes If yes, list the permit numbers for all current NPDES permits for this facility: NA 26) Does this facility have any Non-Discharge permits (ex: recycle permits)?ID No El Yes If yes, list the permit numbers for all current Non-Discharge permits for this facility: NA 27) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? ❑✓ No ❑Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? ❑✓ No❑Yes c) Is this facility a Large Quantity Generator(1000 kg. or more of hazardous waste generated per month)of hazardous waste? ❑✓ No ❑Yes d) Type(s) of waste: How is material stored: Where is material stored: Page 6 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. How many disposal shipments per year: one Name of transport/disposal vendor: TBD Vendor address: TBD Final Checklist This application will be returned as incomplete unless all of the following items have been included: ❑ Check for$100 made payable to NCDEQ. i‘irk --1 ❑ This completed application and all supporting documentation. See Question 10. — ❑ If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR)or local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). II '-1 ❑ Two (2) site plans depicting the site plan with numbered outfalls which indicate stormwater and wastewater outfalls. See Question 10. ❑ A county map or USGS quad sheet with location of facility clearly marked. 28) Signatory Requirements (per 40 CFR 122.22) All applications,reports,or information submitted to the Director shall be signed and certified. a.All notices of intent to be covered under this General Permit shall be signed as follows: (I) For a corporation: by a responsible corporate officer. For the purpose of this permit,a responsible corporate officer means:(a)a president,secretary,treasurer or vice president of the corporation in charge of a principal business function,or any other person who performs similar policy or decision making functions for the corporation,or(b)the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million(in second quarter 1980 dollars),if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2)For a partnership or sole proprietorship: by a general partner or the proprietor,respectively;or (3)For a municipality,state,federal,or other public agency: by either a principal executive officer or ranking elected official. Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: James Higgins Title: Project Engineer 1 Vi /2°La (Signat a of Applicant) (Date Signed) Page 7 of 8 SWU-NCG14-NOI Last revised 8/01/2017 NCG140000 N.O.I. Notice of Intent must be accompanied by a check or money order for$100.00 made payable to: NCDEQ Mail the entire package to: DEMLR-Stormwater Program Dept. of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DEMLR Regional Office for your area. DEMLR Regional Office Contact Information: Asheville Office (828) 296-4500 • ,f ale Fayetteville Office (910)433-3300 , �R � � g Mooresville Office (704)663-1699 i �!I Raleigh Office (919) 791-4200 artPlle Washington Office ...(252) 946-6481 Wilmington Office (910) 796-7215 Winston-Salem (336) 771-5000 F It°, s Central Office .(919) 807-6300 +, FWlI ngton • Page 8 of 8 SWU-NCG14-NOI Last revised 8/01/2017 Attachment A NCG140000 N.O.I. Additional Information for Questions McCarthy Improvement Company, Inc. McCarthy Greensboro Ohenry Blvd. Concrete Batch Plant 3. Physical location information: The facility is located at the construction site of the Guilford County Greensboro Outer Loop (I-840) on the northeast side of Greensboro. The site is located on the right-of-way for I-840. Driving directions to the site from DEQ Regional Office in Winston-Salem,NC: Get on US-52 S from W Hanes Mill Rd and follow US-52 S,US-421 S and I-40 E to US-220 N/US-29 NUS-70 E/S Ohenry Blvd in Greensboro. Take exit 223 from I-40 E and drive north on Ohenry Blvd approximately 4.4 miles to 16th Street Exit. Take the 16`''Street Exit and turn left on 16th Street. Proceed approximately 0.5 mile to Summit Avenue and turn right. Follow Summit Avenue north approximately 2.9 miles to Pineneedle Dr.,then turn right on Pineneedle Dr. Drive about 320 feet SSE on Pineneedle,then turn left onto Assembly Rd and proceed approximately 0.4 mile. The site is located on the left(north) side of Assembly Rd, approximately 150 feet before the end of Assembly Rd at the cul-de-sac. 8. Description of Industrial Activities This batch plant will provide concrete for the paving of the Guilford County Greensboro Loop from US 29,North of Greensboro. The plant will be relocated to this location during the first quarter of 2021. However,the plant will not begin operating until September 2021. No materials will be inventoried or stockpiled at this location until shortly before the plant is anticipated to begin operations. This facility will manufacture concrete, which is transported by dump truck to the area where lanes are being paved. The primary components of the facility include the production plant, aboveground storage tanks that contain diesel fuel and concrete admixtures, storage trailers and a silo that contain cement, as well as sand and aggregate stored in open stockpiles. The manufacturing process requires moving aggregate and sand from stockpiles to the processing plant using front-end loaders and conveyors. Cement is pneumatically added to the sand and aggregate and processed in the mixing drum with water. The concrete is then loaded into dump trucks for delivery to the paving project. 12. Type of Wastewater A combination of wastewater and stormwater will be discharged from this facility's outfall intermittently during the approximately 6 months the plant is expected to operate at this site. Wastewater from the truck bed and drum washout will be comingled with stormwater only when the plant is in operation. On the days the plant is operating,the wastewater described in Attachment B will be generated. 17. Wastewater Treatment Alternatives Review (b) This facility will be operated at this site for approximately nine(9)months. Because of the cost involved and potential delays to the NCDOT project as a result of permitting and construction required to temporarily direct the wastewater from the identified sources to the sewer system,this option is not considered feasible for the short period of time the plant will operate at this location. (c) Surface or Subsurface Disposal Systems (i) It is technically possible to use the recycled water from the truck bed washout recycling system for dust suppression. It is also possible to treat and dispose of wastewater from the site through the existing sediment basins installed for the highway construction. 1 (ii)It is possible to use the recycled water from the truck bed washout recycling system for dust suppression as well as for re-use in the washout system. (iii) These methods of surface disposal and re-use are feasible and will be implemented. 18. Best Management Practices(BMP) This facility is located within the right-of-way for 1-840 and many of the erosion and sediment control BMPs have been installed by E.S. Wagner,the prime contractor on this project, according to NCDOT approved plans. BMP at the site include: (1) All disturbed areas within the plant site will be stabilized with 4 to 6 inches of graded aggregate base(GAB) or vegetated with permanent vegetation. (2) Runoff from the entire site flows to a Modified Silt Basin that discharges to a Skimmer Sediment Basin which discharges to the outfall. (3) Inlet protection at the Silt Basin and outlet protection from the Skimmer Sediment Basin. (4) A Temporary Storm Drainage channel located along the northern site boundary which divers all runoff from the eastern portion of the site, as well as run-on from the highway construction located to the north of the site, to the silt basin. (5) Check dams located in the Temporary Storm Drainage channel. (6) Containment and diversionary berms directing all runoff to the silt basin and skimmer sediment basin. (7) All parts and maintenance oil, grease,and fluids will be stored in closed containers inside the parts trailer. Diesel fuel kept on site to fuel material handling equipment will be stored in a 1,000-gallon double-wall steel tank inside of a portable containment dike. (8) The double-wall steel diesel storage tank used to store fuel for the generator is located inside the generator trailer. (9) Regular inspections of potential sources of pollution are conducted. 24. Discharging wastewater to a BMP This facility is located within the right-of-way for 1-840 and many of the erosion and sediment control BMPs have been installed by E.S. Wagner,the prime contractor on this project,according to NCDOT approved plans. Runoff from the entire site flows to a Modified Silt Basin that discharges to a Skimmer Sediment Basin. The only outfall,which is designated as Outfall No. 1, is located at the discharge pipe from the skimmer. Discharge from the Skimmer Basin flows into a culvert installed under a newly constructed onramp to 1-840 into a series of unnamed tributaries and ultimately flows into North Buffalo Creek. The North Buffalo Creek segment is 16-11- 14-1b, described as from North Buffalo Creek WWTP to Buffalo Creek. 2 Attachment B NCG140000 N.O.I. Additional Information for Questions McCarthy Improvement Company, Inc. McCarthy Greensboro Ohenry Blvd. Concrete Batch Plant Description of Processes Producing Wastewater Three processes at this facility will potentially contribute wastewater to the effluent from the outfall. Wastewater Source 1: Wastewater Source 1 is the concrete batch plant mixing drum. The drum on the plant will be washed out once per day,on days the plant is operating. The wastewater produced from each washout is approximately 800 gallons per day. This wastewater is captured in the upturned bucket of a front end loader and transported to the closest truck bed washout recycling pit located on the site,where it is discharged from the bucket. Wastewater Source 2: Wastewater Source 2 is the truck bed washout used to washout the beds of the dump trucks used to transport the concrete to the area being paved. The plant anticipates producing a maximum of 180 truckloads per day and the trucks will be washed out after every second trip. Each washout will use approximately 50 gallons of water. The anticipated volume of wash water generated will be approximately 4,500 gallons per day. The wash water will be contained and recycled through a series of three settling pits designed to allow suspended particles to settle out of the wash water. The dimensions of each pit will be 20 feet by 20 feet by 8 feet deep. The combined holding capacity of the pits is approximately 200,000 gallons. The water in the third pit will be recycled as wash water or used for dust suppression on the site. Solids will be removed from each pit when the volume occupied by the solids equals one half of the designed holding capacity of the pit. The solids are allowed to dry and are properly disposed of. If wash water is spilled or leaks from the recycling system or the washout area, it would flow to a silt basin and skimmer sediment basin at the northwest corner of the site,discharge from the skimmer basin flows into a culvert under the off-ramp under construction for I-840. The discharge flows through several unnamed tributaries and ultimately discharges to North Buffalo Creek. Fifteen inches of freeboard will be maintained in the third washout pit at all times to accommodate a 10 year rain event(4.9 inches)over the three ponds. Wastewater Source 3: Wastewater Source 3 includes the aggregate stockpiles. The aggregate stockpiles will be wetted using a lawn sprinkler and hose. The sprinkler will be rotated around each stockpile during the day to cover all parts of each pile. Wetting the aggregate stockpiles is done to produce evaporative cooling of the stone. The evaporation of the water during this sprinkling process reduces the volume of water that ultimately flows away from the stockpiles. Wetting is not used on the sand stockpile. Per DOT specifications,both the aggregate and sand are washed prior to being delivered to the site,reducing the potential fines in stormwater runoff from the area covered by the stockpiles. Wetting of the aggregate stockpile will be conducted up to 24 hours per day when the plant is operating during summer months. The wastewater from the aggregate stockpile will consist of water from the wetting of the stone and stormwater that falls on the pile. Wastewater from the sand stockpile will consist of only stormwater that falls on the pile. Stormwater and wastewater from the stockpiles will flow to a silt basin and skimmer sediment basin at the northwest corner of the site,discharge from the skimmer basin flows into a culvert under the off-ramp under construction for I-840. The discharge flows through several unnamed tributaries and ultimately discharges to North Buffalo Creek. . Fifteen inches of freeboard will be maintained in the third washout pit at all times to accommodate a 10 year rain event(4.9 inches)over the three ponds. BUSINESS CORPORATION ANNUAL REPORT 10-2017 NAME OF BUSINESS CORPORATION: McCarthy Improvement Company 0626758 ngOffice se my SECRETARY OF STATE ID NUMBER: STATE OF FORMATION: IA E-Filed Annual Report 0626758 REPORT FOR THE FISCAL YEAR END: 1 2/31/201 9 CA202003001664 1/30/2020 04:30 SECTION A: REGISTERED AGENTS INFORMATION ❑X Changes 1. NAME OF REGISTERED AGENT: Corporation Service Company 2.SIGNATURE OF THE NEW REGISTERED AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS&COUNTY 4.REGISTERED AGENT OFFICE MAILING ADDRESS 2626 Glenwood Avenue, 2626 Glenwood Avenue„ Suite 550 Raleigh, NC 27608 Wake County Raleigh, NC 27608 SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Construction 2. PRINCIPAL OFFICE PHONE NUMBER: (563) 359-0321 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 5.PRINCIPAL OFFICE MAILING ADDRESS 5401 Victoria Avenue 5401 Victoria Avenue Davenport, IA 52807-3932 Davenport,IA 52807-3932 6. Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran-owned small business nThe company is a service-disabled veteran-owned small business SECTION C:OFFICERS(Enter additional officers in Section E.) NAME: Sonia Lyn Sundstedt NAME: Joseph D Bush NAME: Scott E Hutter TITLE: Secretary TITLE: Chief Operating Officer TITLE: President ADDRESS: ADDRESS: ADDRESS: 5401 VICTORIA AVENUE 5401 VICTORIA AVENUE 5401 Victoria Avenue DAVENPORT, IA 52807 Davenport, IA 52807 Davenport, IA 52807 SECTION D: CERTIFICATION OF ANNUAL REPORT, Section D must be completed in its entirety by a person/business entity rnia Lyn Sundstedt 1/30/2020 J SIGNATURE DATE Form must be signed by an officer listed under Section C of this form. Sonia Lyn Sundstedt Secretary Print or Type Name of Officer Print or Type Title of Officer MAIL TO:Secretary of State, Business Registration Division,Post Office Box 29525,Raleigh,NC 27626-0525 SECTION E: ADDITIONAL OFFICERS NAME: Mike Daniel NAME: NAME: TITLE: Chief Financial Officer TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: 5401 VICTORIA AVE STE 300 DAVENPORT, IA 52807 NAME: NAME: NAME: TITLE: TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: NAME: NAME: NAME: TITLE: TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: NAME: NAME: NAME: TITLE: TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: NAME: NAME: Name: TITLE: TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: NAME: NAME: NAME: TITLE: TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: TERRA November 19,2020 CONSULTING Stormwater Permitting Unit Program Division of Energy,Mineral and Land Resources 1612 Mail Service Center Raleigh,North Carolina 27699-1612 RECEIVED RE: Notice of Intent for Permit No.NCG140000 DEC 07 2020 McCarthy Improvement Company McCarthy Greensboro Ohenry Blvd. Concrete Batch Plant DENR-LAND QUALITY STORMW'ATER PERMITTING Stormwater Permitting Unit: Terra Consulting,LLC is submitting the enclosed Notice of Intent(NOI)for General Permit No. NCG140000 on behalf of McCarthy Improvement Company for the operation of a concrete batch plant to be located at the I-840/Ohenry Blvd. Interchange in the City of Greensboro in Guilford County. No land disturbance permit is required for this site because the plant will be installed within the permitted area of the NCDOT Guildford County Greensboro Outer Loop project. The plant will be moved to this location from its former location at the Elm Street/I-840 interchange in Greensboro during the first quarter of 2021. However,the plant will not begin operating until September 2021. No materials will be inventoried or stockpiled at this location until shortly before the plant is anticipated to begin operations. The following items are enclosed: • Notice of Intent form plus attachments to provide space to adequately answer questions; • A check for the$100.00 application fee; • North Carolina Secretary of State Certificate of Authorization; • Attachment A—Additional Information for Questions; • Attachment B—Description of Processes Producing Wastewater; and • 2 copies of the Site Plan, including an inset USGS topographic map showing the site location. If you require additional information please contact me at jacki@terraconsultingllc.com or 770-573-3055 or James Higgins of McCarthy Improvement at(563)449-6779 or jhiggins@mccarthyimprovement.com. Sincerely, e kU 'ainotVer -- acki Congleton Senior Project Manager Enclosure cc: James Higgins, McCarthy Improvement Company, Inc. P.O. Box 1738 • Carrollton, GA 30112 • Office: 770-573-3055 • www.terraconsultingllc.com