Loading...
HomeMy WebLinkAbout20100645 Ver 1_Notice of Construction_20100924L o-_. A S September 23, 2010 Mrs. Lia Gilleski Express Review Coordinator DWQ 401 Unit 2321 Crabtree Blvd., Suite 250 Raleigh, North Carolina 27604 Re: DWQ EXP#: 10-0645 -Notification KapStone Natural Gas Line Roanoke Rapids, North Carolina KKP-10100 Dear Mrs. Gilleski: SEP 2 4 2010 KapStone Kraft Paper Corporation will begin construction of the natural gas service line this week. Per Item #6 of the Conditions of Approval on the permit, we are giving 10 days notice prior to crossing the two creeks. The contractor proposes to perform the installation for each crossing between October 4 and October 29. Please note that we will give you a courtesy call on the day of the actual construction for each crossing. This is a fast paced project but the installation dates may have to vary slightly due to the weather conditions during this proposed time frame. In addition, KapStone Kraft Paper will be coordinating with Dominion Power Company to sequence a low flow period in this part of the Roanoke River to aid in the creek crossing installation. This additional coordination may also create a delay in the construction. If you should have any questions or require additional information, please do not hesitate to contact me at (252) 533-6255 or Kevin Yates, Senior Environmental Scientist, EcoEngineering at (919) 361-5000. Sincerely, - Mary Lee ansmeier Environmental Programs Manager Io--otpii S KAPSTONE KRAFT PAPER CORPORATION A Division of KAPSTONE PAPER AND PACKAGING CORPORATION 100 Gaston Road Roanoke Rapids, NC 27870 kapstonepaper.com Cc: Robert Miller, Heath Engineering Kevin Yates, EcoEngineering Neal Davis, KapStone