HomeMy WebLinkAbout820106_Plan of Action (POA)_20191230 D or
JAN 3 2020 e2 I v
WQRO
PLAN OF ACTI�� Y^ POA)`F ,f�' r�o�VN SLUDGE REDUCTION
Facility Number: O ,1- I & County: 54 sAP Spite
Facility Name: "Be,C o:n 73 Of r irks.-'
Certified Operator Name: /•i d r j c,v+ Z. /nod r' Operator#: }F /0 p41313
**Attach a copy of Lagoon Sludge Survey Form and volume worksheets
Note:A certified Sludge Management Plan may be submitted in lieu of this POA.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 _ Lagoon 5 Lagoon 6
a. Lagoon Name/Identifier jj art
b.Total Sludge Depth(ft) 5 l7 3
-c.Sludge Depth to be
Removed•for Compliance ,5 ;!)
(ft) .
d.Sludge Volume to be 0 6"--
Removed(gallons) �b ? D00 ^5L
e.Sludge PAN
(Ibs/1000 gal) 1 0
f._Liquid.PAN
• Qbs/1000 gal) v .
g. PAN of Sludge(Ibs)
x e)/1000 I So60
Compliance Timeframes:
If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level
results in an elevated waste analysis, a sludge management plan that meets the requirements of SB
Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to
DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance
with NRCS Standard 359 must be achieved within two years of the original sludge survey.
If the sludge level is non-compliant but below the stop pump level of the lagoon, a POA must be filed
within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the
original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in
sludge levels, DWR may require the owner to develop a sludge management plan that meets the ,'
requirements of SB Interagency Group Guidance Document 1.27.
SPOA 9-15-2016 Page 1 of 3
,NARRATIVE:Use.this section to describe the method(s)that Will be used to lower the sludge
depth. If microbe use is planned,specify the product to be used. _
71-0011-1cev e meArt_ --agelle by booti
ave-jah(,e.. IorY.,1 - 14 SItIji. PfcPt. wi(i be.. stcbwr �f��(� - TL 4 i .J6 _ p-iix
o •G.t1 Shto t- re 0Vj
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action,and to the best of my knowledge and ability,the information is accurate and
_ correct. I further certify and acknowledge that compliance with regard to sludge accumulation
must be achieved within two years of the original sludge survey indicating non-compliance.
Sludge Survey Date: %Z zz)) ) Compliance Due Date: j 4/ v/ i
UVI-- - - nIf an. L.- AA - - — ~-Phone: (al-ID) �1�i t3:'j?-o:U - - ,_ - - --
Fa�ility Owner/Manager(print)
ct-.- 9729411--e.. Date:. ) Z
FacilityOwner/Manager(signature) -
NPDES Permitted.Facilities State Permitted Facilities
Return this form to: Return this form to:
Animal Feeding Operations Program NC Division of Water Resources
NC Division of Water Resources_ at the appropriate Regional Office
1636 Mail Service Center (see following page)
Raleigh, NC 27699-1636
SPOA 9-15-2016 Page 2 of 3
r Appendix 1.Lagoon Sludge Survey Form Revised August 2008
A.Farm Permit or DWQ Identification Number Bacon Berry Farm'
B.Lagoon Identification Bacon Berry Farm '82-102
C.Person(s)Taking Measurements SF Staff
D.Date of Measurement 12/20/2019
.E.Methods/Devices Used for Measurement of:
a.Distance from the lagoon liquid surface to the top of the sludge layer.
pole with disc
b.Distance from the lagoon liquid surface to the bottom(soil)of the lagoon.
pole
c.Thickness of the sludge layer if:making-a direct measurement with"core sampler".
F.Lagoon Surface Area(using dimensions at inside top of bank): 2.33 (acres)
(Draw a sketch of the_lagoon-on a.separate sheet;list dimensions;:and-calculate-surface area.,-The lagoon--- - - - -
may have been built different than designed,so measurements should be made.)
G.Estimate number of sampling points:
a.Less than 1.33 acres:Use 8 points
b.If more than 1.33 ac. 2.33 acres x 6= 18 ,with maximum of 24.
(Using sketch and dimensions,develop a uniform grid that has the same number of intersections as the
estimated number otsampling points needed:Number the intersection points on the lagoon grid so that data
recorded at each can be easily matched.)
H.Conduct sludge survey and record data on"Sludge Survey Data Sheet"(Appendix 2).Also,at the
location of the pump intake,take measurements-of distance from liquid surface to top of sludge
layer and record it on the Data Sheet(last row);this must be at least 2.5 ft.when irrigating.
I.At the time of the survey,also measure the distance from the Maximum Liquid Level to the Present Liquid
Level(measure at the lagoon gauge pole): 2.5
J.Determine the distance from the top of bank to the-Maximum.Liquid-Level_ 20,5.
(use lagoon management plan or other lagoon records)
K..Determine"the distance-.from.the Maximum Liquidto.the.Minimum_Liquid level:. 25.1.
(use lagoon management plan or other lagoon records)
L_ Calculate_tthe.distance_from the,present liquid-surfac e-Ievel.to.the.Minimum.Liquid-Level 1.9.
(Item K Minus Item I,assuming the present liquid level is below the Maximum Liquid Level)
M.Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the
lagoon bottom(average for all the measurement points) 10.7
N.Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top
of the sludge layer(average for all the measurement points): . 5.7
O.Record from the Sludge Survey Data Sheet the average thickness of the sludge layer. 5.0
P.Calculate the thickness of the existing Liquid Treatment Zone(Item N minus Item L): 3.8
Q.If Item.O.is:greater than Item P,proceed to the Worksheet for Sludge Volume and.Treatment.Volume,_
If Item 0 is equal to or less than Item P,you do not have to determine volumes. -
Completed by:. Smithfield Staff. Date:, 12/20/201.9_
Print Name/Signature •
o) ; :>
r . to
C O O O O O O tq O O t0 O O o0 VIto t0 Cl O O O O O O O M t0
�I R. CV 6oD CO CO CO co CD Ca coLn CO C7 N r a- r C O O O C G C �j O
a)
m 2 c X X X
hi ^ O
2
.I + a)LL X X i X v.
N
, Y
�'' co
H co
c0 0 0 0 O -M tt) O M O 00 O O O ,Q cri O 0 0 0 0 0 0 h . 0
(p V C e= r e= r C 0 0 O' 0 0 0 0 0 0 0 0 0 O
O 'C a .14 r O 0
Cl) = O LL
- - tl)
'O coo .0
co U X X
N " o E
co Cco
r r e- — It) r lt) 10 - t0 r IO 10 O O O t() l0 N
r r r a- t•- r N r,. r N r h• N. r r •- CV, C to
03 r 0 r r t� to O r 03
_) w0 t' r r r r Xhe
X
y �- i c3
cc d
ca
m 0 0 0 O O t0 O 00 0 0 0 0 O O 10 0t0 O O O O O O• O O 0 O 0)
c "�. O (0 co v) co co d' co co CV CO tri CO N. CO CO 0) F.3. 0 0 0 0 0 0 inU)
fnas tc
N LL I co
W co N 73 Iv em
H C Q C
6 ? m C otS p) ;. 0.
4-3
Z can a °
d z
u) c 0) CO th C') tO CO O CO CO tO CO tO CO O t0 to O O i — a) 0 (n
CO CO ): N NI N co 00 r I ,;.
{) C y _ 'd' CV to 17
c as
° p u. i 03 0
.c y'r C C)
N .0 c. ,� a Z
a) .. ,., 0
x v c ° m rn 6 a) co
• W o E Q a- N c7 q• to co h 00 co O r CV M •c LO CO t� CO 0 N N N N Cr .O m C , :, 0 m (7
Appendix 3.Worksheet for sludge volume and treatment volume Revised August 2008
The average thickness of the sludge layer and the thickness of the existing liquid(sludge-free)treatment zone are determined
from the information on the Lagoon Sludge Survey Form(Items 0 and P,respectively).In this example,the average sludge
layer thickness is 2.5 feet and the existing liquid treatment zone is 3.5 feet.If the lagoon has a designed.sludge_storage volume,_
see notes at end of the worksheet.The dimensions of the lagoon as measured and the side slope are needed ,
for calculations of sludge volume and of total treatment volume.If the lagoon is a standard geometric shape,the sludge
volume and.the treatment volume-inthe,lagoon.can..be estimated.by using:standard:equations:.For approximate:volumes.
of rectangular lagoons with constant side slope,calculate length and width at the midpoint of the layer,and multiply by layer
thickness to calculate layer volume,as shown.in.the example_For irregular shapes,convertthe total surface area to a square
or rectangular shape.For exact volumes for lagoons with constant side slope,the"Prismoidal Equations"may be used.
Example Your Lagoon •
1.Average sludge Layer Thickness(T) 2.5. ft. 5.0 ft.
2.Depth of the lagoon from top of bank to bottom soil surface(D) 11 ft. 12.9 tip_ ft.
3.Slope=Horizontal/vertical side slope(S) .-. -.- -- - - - - --:- - - - 3 _ - _- 3.1
-4.Length at the top of inside bank(L) 457 ft. 350.0 ft.
5.Width at top inside slope(W) 229 ft. 290.0 ft.
6.Length at midpoint of sludge layer Lm=L-2S(D-(f/2)) 398.5 ft. . 285.9 ft.
7.Width at midpoint of sludge layer Wm=W 2S(D-(T/2)) 170.5 ft. 225.9 ft.
8.Volume of sludge(Vs) Vs=Lm Wm T 169,860 ft3 324;921 ft3
9.Volume in gallons:Vs9 V*7.5 gal./ft3. 1,273,950 gal. 2,436,906 gal.
10.Thickness of existing liquid tmt.zone(Y) 3.5 ft 3.8 ft
11.Thickness of total treatment zone(Z) Z=T+Y 6 ft 8.8 ft
12.Length at midpoint of total tmt.zone LZ=L-2(S)(D-(ZJ2) 409 ft. 297.7 ft.
13.Width at midpoint of total tmt.Zone WZ =W 2(S)(D-(Z!2) 181 ft. 237.7 ft.
14.Volume of total treatment zone(Vz) Vz=LZWZZ 444,174 ft3 624,854 ft3
15.Ratio(R)of sludge layer volume to total Treatment Volume
R=VsNz 0.38 0.52
If the:ratio.R exceeds.0.50,than a-sludge Plan of Action may be required. Check,with DWQ for information
on filing the Plan of Action.
Note: If the lagoon has a designed sludge storage volume(DSSV),subtract that volume from both the volume
of sludge.(Vs)(Item 8)and from the volume of total treatment zone(Vz)(Item 14),and take the ratio.
Then,R=(Vs-DSSV)/(Vz-DSSV)
Example: If DSSV=85,000 ft3,then R=(169,860-85,000)/(447,174-85,000)=84,860/362,174=0.24.
16. Design sludge storage volume(DSSV) 85,000
17. Ratio(R)-of sludge layer volume to treatment volume adjusted
for designed sludge storage volume - 0.24 - 0.52