Apri14, 2007
LYNDO TIPPETT
SECRETARY
Mr. David Baker, NCDOT Project Manager O ~ /~ ~f
U.S. Army Corps of Engineers V v
151 Patton Avenue, Room 208
Asheville, NC 28801-2714
Subject: Nationwide 14 and Nationwide 33 Permit Application-Revised
DWQ Project No. 20070261
SR 1260 -Dogwood and Wildcat Drive
Haywood County
State Project No. 140.044072 (D`VQ Minor Permit Fee $200)
Dear Mr. Baker:
During a recent evaluation of the above road two pipes were noticed in addition to the previously
submitted culvert replacements. The pipe is locations are at station 73+37 and station 144+48.
Therefore, we are revising our permit application to reflect this change as follows.
I am sending permit drawings and a revised impact chart from the PCN application.
The North Carolina Natural Heritage Database was checked for records of threatened and
endangered species. There are no records of listed species for Pine Tree Cove Creek watershed.
Additionally, there are no records for the adjacent watersheds, Johnson Creek and Mine Branch.
There are no records from the confluence of Pine Tree Cove Creek with Jonathan Cre~k'to the
Pigeon River. The impacts from culvert replacement/extensions will be relatively minor. The
streams are small and are not of sufficient size to support mussels. For these reasons, there will
be "no effect" on threatened or endangered species.
Impacts to historic or cultural resources are not anticipated. If the State Historic Preservation
Office (SHPO) and the Office of State Archaeology determines that further investigations are
required, NCDOT will conduct the appropriate site investigations and obtain compliance from
SHPO prior to project construction.
.g
The best management practices will be used to minimize and control sedimentation and erosion
on this project. The construction foreman will review all erosion control measures daily to
ensure sedimentation and erosion is being effectively controlled. If the planned devices are not
functioning as intended, they will be immediately replaced with better devices. The rock silt
screens and other erosion control devices will be in place prior to pipe culvert construction and
will remain in place until the project is stabilized.
Impacts to Waters of the United States
The unnamed tributaries and Pine Tree Cove Creek appear to have perennial flow. The channels
are composed of bedrock, cobble, gravel and sand. The channels lack vegetation. For these
reasons, we believe these streams are under the jurisdiction of the U.S. Army Corps of
Engineers. In order to construct the project in accordance with our current secondary road
standards, it will be necessary to impact waters of the United States in the French Broad River
Basin. Specifically, NCDOT is requesting to extend/replace three metal culverts in UT to
Jonathan Creek (DWQ Class C, Tr), two metal culverts in Pine Tree Cove Creek (DWQ Class C,
Tr) and nine metal culverts in UT's to Pine Tree Cove Creek (DWQ Class C, Tr). Listed below
is a summary of the proposed impacts.
Site No. Existing Proposed Condition Net Impacts
Station Condition
Site 1 50' x 18"
8+50
CMP 57' x 24" CMP 7' extension
5 Open Channel Temporary Dike w/Sandbags 15 ft'`
8+50
Site 1 A Free Flowing Temporary De-watered '
8+50 Channel Channel 100
Site 2 30' x 10" 40' x 18" CMP 10'
26+63 CMP extension
Site 2A
26+6~ Open Channel Temporary Dike w/ Sandbags 15 ftZ
Site 2A Free Flowing Temporary De-watered '
26+63 Channel Channel 100
Site 3 50' x 15"
32+60
CMP 55' x 24" CMP 5' extension
Site 3A Open Channel Temporary Dike w/ Sandbags 15 ft2
32+60
Site 3A Free Flowing Temporary De-watered '
32+60 Channel Channel 100
Site 4 30' x 21" x
42+37 15" Arch 34' x 24" CMP 4' extension
CMP
1 Open Channel Temporary Dike w/ Sandbags 15 ft'`
2+37
4
Site 4A Free Flowing Temporary De-watered
42+37
Channel
Channel 100'
Site 5 26' x 15"
46+36
CMP 35' x 24" CMP 9' extension
Site SA
46+36 Open Channel Temporary Dike w/Sandbags 15 ft2
Site SA Free Flowing Temporary De-watered
46+36
Channel
Channel 100'
Site 6 30' x 36" ' 15'
46+77 CMP 45
x 48" CMP extension
Site 6A
46+77 Open Channel Temporary Dike w/ Sandbags 30 ftZ
Site 6A Free Flowing Temporary De-watered
46+77
Channel
Channel 100'
Site 7 50' x 24" ' 20'
57+71 CMP 70
x 24" CMP extension
Site 7A
57+71 Open Channel Temporary Dike w/Sandbags 15 ft2
Site 7A Free Flowing Temporary De-watered
57+71
Channel
Channel 100'
Site 8 24' x 60" 43' x 60" CMP 19'
60+00 CMP extension
Site 8A
60+00 Open Channel Temporary Dike w/ Sandbags 30 ft''
Site 8A Free Flowing Temporary De-watered
60+00
Channel
Channel 100'
Site 9 30' x 2x18" '
" 10'
70+45 CMP 40
x 42
CMP extension
Site 9A
70+45 Open Channel Temporary Dike w/ Sandbags 25 ft2
Site 9A Free Flowing Temporary De-watered
70+45
Channel
Channel 100'
Site 10 37' x 18" '
" 21'
117+25 CMP 58
x 24
CMP extension
Site l0A
117+25 Open Channel Temporary Dike w/ Sandbags 15 ft2
Site l0A Free Flowing Temporary De-watered
117+25
Channel
Channel 100'
Site 11 40' x 30" '
" 15'
119+90 CMP 55
x 42
CMP extension
Site 11 A
119+90 Open Channel Temporary Dike w/ Sandbags 25 ft'
Site 11A Free Flowing Temporary De-watered
119+90
Channel
Channel 100'
Site 12 28' x 18" 50' x 24" CMP 2~,
137+71 CMP extension
1 Open Channel Temporary Dike w/Sandbags 15 ft2
137+7
Site 12A Free Flowing Temporary De-watered 100'
137+71 Channel Channel
Site 13 40' x 48" 60' x 48" CMP 20'
138+38 CMP extension
Site 13A Open Channel Temporary Dike w/ Sandbags 30 ft'-
138+38
Site 13A Free Flowing Temporary De-watered 100'
138+38 Channel Channel
Site 14 40' x 36" 65' x 48" CMP 25'
154+15 CMP extension
1 Open Channel Temporary Dike w/ Sandbags 30 ft''
54+15
1
Site 14A Free Flowing Temporary De-watered 100'
154+15 Channel Channel
Site 15 25' x 15" 50' x 18" CMP 25'
73+37 CMP extension
Site 15A Open Temporary Dike w/ 30 ft2
73+37 Channel Sandba s
Site 15A Free Flowing Temporary De-watered 100'
73+37 Channel Channel
Site 16 30' x 15" 45' x 18" CMP 15'
144+48 CMP extension
Site 16A Open Temporary Dike w/ 30 ft2
144+48 Channel Sandba s
Site 16A Free Flowing Temporary De-watered 100'
144+48 Channel Channel
242 linear feet total
Permits Requested
I~TCDOT is hereby requesting authorization under Section 404 of the Clean ~`'ater Act to proceed
with the construction project outlined above. By copy of this letter, I am asking Mr.,David
McHenry, Mountain Region Coordinator, of the North Carolina Wildlife Resources Commission
(NCWRC) to comment directly to you concerning the 404 Nationwide Permit request.
Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water
Act from the North Carolina Department of Environment and Natural Resources (DENR),
Division of Water Quality (DWQ). In addition, I am requesting Mr. McHenry and Mr. Ed Ingle,
Roadside Environmental Field Operations Engineer (NCDOT), to comment directly to me
concerning this permit request.
If you have any questions or need additional information, please contact me at (828) 488-2131.
Your early review and consideration will be greatly appreciated.
Sincerely
onathan L. Woodard, P.E.
District Engineer
cc: Mr. John Hennessy, DWQ, DENR, Raleigh (seven copies)
Mr. Mike Parker, DWQ, DENR, Asheville
Mr. David McHenry, Mountain Region Coordinator, NCWRC
Mr. J. B. Setzer, P.E., Division Engineer, NCDOT
Mr. Mark Davis, Division Environmental Officer, NCDOT
Mr. B. T. Williams, P.E., County Maintenance Engineer, NCDOT
Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT
8A @ Station Pine Tree Cove De-watered p 4 100 N/A
60+00 Creek Channel
9 @ Station 70+45 UT to Jonathan Culvert Extension P 3 10 0.00069
Creek
9A @ Station UT to Jonathan Impervious Dike P 5 (Dike) 5 0.00057
70+45 Creek
9A @ Station UT to Jonathan De-watered p 3 100 N/A
70+45 Creek Channel
10 m Station UT to Jonathan Culvert Extension P 1 21 0.00048
117+2~ Creek
l0A @ Station UT to Jonathan Impervious Dike P 3 (Dike) 5 0.00034
117+25 Creek
l0A m Station UT to Jonathan De-watered p 1 100 N/A
117+25 Creek Channel
l I @ Station UT to Jonathan Culvert Extension P 3 15 0.00103
119+90 Creek
11A @ Station UT to Jonathan Impervious Dike P 5 (Dike) 5 0.00057
1 19+90 Creek
11 A @ Station UT to Jonathan De-watered p 3 100 N/A
1 19+90 Creek Channel
12 @ Station UT to Pine Tree Culvert Extension P 1 22 0.000) 1
137+71 Cove Creek
12A a Station UT to Pine Tree Impervious Dike P 3 (Dike) 5
137+71 Cove Creek
12A r~ Station UT to Pine Tree De-watered p 1 100 N/A
137+71 Cove Creek Channel
13 tL Station Pine Tree Cove Culvert Extension P 4 20 0.00184
138+38 Creek
13A @ Station Pine Tree Cove Impervious Dike P 6 (Dike) 5 0.00069
138+38 Creek
13A @ Station Pine Tree Cove De-watered p 4 100 N/A
13 8+3 8 Creek Channel
14 @ Station UT to Pine Tree Culvert Extension P 4 25 0.00230
154+15 Cove Creek
14A @ Station UT to Pine Tree Impervious Dike P 6 (Dike) 5 0.00069
154+15 Cove Creek
14A @ Station UT to Pine Tree De-watered p 4 100 N/A
154+15 Cove Creek Channel
I S @ Station UT to Jonathan Culvert Extension P 1 25 0.000J7
7 + Creek
15A @ Station UT to Jonathan Impervious Dike P 3 (Dike) 5 0.00034
73+37 Creek
15A a Station UT to Jonathan De-watered p 1 100 N/A
73+37 Creek Channel
16 @ Station UT to Pine Tree Culvert Extension P 1 15 0.00034
144+48 Cove Creek
16A a Station UT to Pine Tree Impervious Dike P 3 (Dike) 5 0.00034
144+48 Cove Creek
16A a Station UT to Pine Tree De-watered p 1 100 N/A
144+4$ Cove Creek Channel
Total Stream Impact (by length and acreage) 242 .01214
Total Temporary Impacts for De-watering & Impervious Dikes Respectively 1670 0.00730
Page 6 of 12
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43,560.
Stream Impact
Perennial or Average Impact Area of
Number Stream Name Type of Impact
Intermittent? Stream Width Length Impact
(indicate on ma) Before Impact (linear feet) (acres)
1 a Station 8+$0 UT to Pine Tree Culvert Extension P 1 7 0.00016
Cove Creek
lA a` Station 8+50 UT to Pine Tree Impervious Dike P 3 (Dike) 5 0.00034
Cove Creek
1 A C Station 8+50 UT to Pine Tree De-watered p 1 100 N/A
Cove Creek Channel
2 cc Station 26+63 UT to Pine Tree Culvert Extension P 1 10 0.00023
Cove Creek
2A @ Station 26+63 UT to Pine Tree Impervious Dike P 3 (Dike) 5 0.00034
Cove Creek
2A @ Station UT to Pine Tree De-watered p 1 100 N/A
26+63 Cove Creek Channel
3 a- Station 32+60 UT to Pine Tree Culvert Extension P 1 5 0.00011
Cove Creek
3A a Station UT to Pine Tree Impervious Dike P 3 (Dike) 5 0.00034
32+60 Cove Creek
3A a` Station UT to Pine Tree De-watered p 1 100 N/A
32+60 Cove Creek Channel
4 ct Station 42+37 UT to Pine Tree Culvert Extension P 1 4 0.00009
Cove Creek
4A C Station UT to Pine Tree Impervious Dike P 3 (Dike) 5 0.00034
42+37 Cove Creek
4A @ Station UT to Pine Tree De-watered P 1 100 N/A
42+37 Cove Creek Channel
5 a. Station 46+36 UT to Pine Tree Culvert Extension P 1 9 0.00021
Cove Creek
SA ~ Station UT to Pine Tree Impervious Dike P 3 (Dike) 5 0.00034
Cove Creek
SA @ Station UT to Pine Tree De-watered p 1 100 N/A
Cove Creek Channel
6 C Station 46+77 UT to Pine Tree Culvert Extension P 4 15 0.00138
Cove Creek
6A c~ Station UT to Pine Tree Impervious Dike P 6 (Dike) 5 0.00069
46+77 Cove Creek `
6 AC Station UT to Pine Tree De-watered p 4 100 NSA
46+77 Cove Creek Channel
7 C; Station 57+71 UT to Pine Tree Culvert Extension P 1 20 0.00046
Cove Creek
7A cs Station UT to Pine Tree Impervious Dike P 3 (Dike) 5 0.00034
57+71 Cove Creek
7A ~ Station UT to Pine Tree De-watered P 1 100 N•!A
57+71 Cove Creek Channel
8 al Station 60+00 Pine Tree Cove Culvert Extension P 4 19 0.00174
Creek
8A a Station Pine Tree Cove Impervious Dike P 6 (Dike) 5 0.00069
60+00 Creek
Page 5 of 12
VICINITY MAP
Haywood County
State Road Number: 1260
Magg+e Valley
SITE
EXIST.
PROP.
BRANCH
EXIST.
PROP.
EXIST.
PROP.
STA.
STA.
SIZE
SKEW
SKEW •15
73.00
73.37
1' W X 2' D EXIST
25' X 15' CMP CL
50' X 18' CMP ~
90•
I2~' _' \
~.
EXT. INLET-J ~ ~ ` ~`
END 2' ~ ~` •`
~
I3'
EXIST. LIVE
WATER DITCH
/ i
~
\
~~ ~
Y
8'
EDGETPROP.
TL EP
ROP.
CL
20'
~ l I
~ .`
~ ` .` J
~~:`.
~ I ~ ~
~ I
I ~
I ~
~ I
i
8
EDGET PROP.
T~ EP HAYWOOD CO.
SR 1260
DOGWOOD DR.
N
`
`\ ~ ~ NEXT. OUTLET
END 23'
= 2~'
I I ~ I '. I
I I I I
~ ' T
'
~ .B.M. ELEV. 100.0
,
I ~ NAIL IN PP
T
'
'
I ! . STA. 73.35
18
L
II I I
P R P I I! I: i l I
S ~
~'
! I
! I
I R I I ! I I I
! i 1 I I I I I
~ Ii li
. i - - - - _ I I! I~ I
-- I _ _ _ I I ~ l i I I
I ! I I - I I I ' I '~
E E D i i - - - ~ 1- - ~ I I I
i t 'I ' I ~~! ~ I ~ I
R ~ I
I ~ ~ '
~ ~ ~
•I
'
r I; I
t I
I I E XT E ND' 2 3 I ~I ' ~ I '
l i I I I I I I
I I I ! I
I I I l i I I I
I I I I i i I I I O. G'.
I II ~I ~'
I ., I I I l i I
I I I I I I i I
I I ! I
I I ! I I I
I I I !! II I
I I I I I I'
I II I III
II li I
I I
1 ~
1 ~ ~ EXISTING GRADE-10.0%
• ~ PROPOSED GRADE - 10.0%
t I I
SITE
EXIST. STA.
PROP. STA.
BRANCH SIZE
EXIST.
PROP.
EXIST. SKEW
PROP. SKEW •16
144.53
144.48
2' W X 1' D
30' X 15' CMP
45' X 18' CMP
90'
8~'
T. OUTLET~r-
END 15'
ROP. EXIST
CL CL
'
( I I
I I I
I I I
I 7'
I I I
I I I
I I I
80•
__ __- _-_ 1=---I
- r I I
I I I
I 8, I B, I
I I
I ~ I
I ~ I
PROP, EXIST PROP,EXIST
EP EDGE EP EDGE
TL TL HAYWOOD CO.
SR 1260
DOGWOOD DR.
N
2m'
I I I I I I I I I
I I I I
T
M
ELEV
100
B
0 I
.
.
.
.
.
IRON PIN
I 41' RT
STA
144.6
I ~ .
.
0
I I I I
I I
I ( 'g I I
~ ~ I '
I ~ I R I
' I i
I ; i
I ' l " I I
I I ~ I i
i I I ~ ~ ' I I
I ' ' - I ~ I !
`
i - ~ I I I 'O. G.
III I
I 1 - - PRO P. LA VER I ~ I
ELE .. 5: 8~ I I
- ~ PE RC HE D 1 .3 ' i t I I I I i
I I '
I , ~ ; i j
PR OP . I N E RT I I ! I
' " EL 7 9. 3 ~ I I J I! i
~ i I I
I I I i !
! I i
I I j I
,G ~ I I I I I'
I I I i i
I I
I I I
7%
1 10 ~ EXISTING GRADE-14.
7%
PROPOSED GRADE - 14
• I .
I I
I-
I -
~z
I Q-
I,-s~°-
,o
0
i~
M_
I~_
i -
3.083 33 ° W 3.075 00 ° W I I ~ 3.066 66 ° W ~
_ -,.,-~.I t ~ ~ ~~ 1 ~ ~ ` ~ `, +, t ice/ ti..~"-i ~
J
I I - `T~w../- l R /~
~, ~ • 'r r f; • .... ; , ',,-, 1 ~ ~a~ 1~``~ J~\~f ~L~ %~ 4/! 1 1 • ~ +1r' 1 1 V 1 t I
•~ ' ~ f
~,, _
llll! '+
' r rJJ-~•'~
r+ J
v ~ `f':-
,~~~
t!` r ~
) 5 ~~ ~!~ ~ ~1fj~ '~ ,."
J
r ,r / f.
~
, fr
- l
r
~
_
fi
f f. 't * 1
~
\ _ f
r
~! f . r" - ~\ //~f
r
` ~.
J
\ ~ f lr i ~ ~ ~ r I
~
'
iy , ,.~ i `
fy~ r f+ fW
, ,1 ,r -r-~--_ . "c~~,~s ~!
• i ! , ti ~ Lr.! ~
'
c"\~ ' ~ 1
-~,, r _ .. i I i
~ ~ ~ 5
r
~,"~ t ~ r _ --J' ~r 1 t= -.r
l X111
~ ~
. . -.
~
~
/'J
!
~ \` '1
•
~ -ti
~ ~~ ~'/ J
1 , fir,
{ ~y ~
~
~~,% J
~
- ~
r, f
,.
. ' ~. r,...~ ~ 'I ~ ~rf- - , '1-
I
~
I i
~ ~ ~i' .
I I
~~ 1
I
~
~
~ I
1 _ - -
~, I I
`
I I I (y + fir -
r
I II ~
li I I I ~ _~ - - - -
~. ~.
~ 3.083 333° I I ~3.0~75 000° ~ ~ I~~ 83.0660666° W I i I I
i
Gopynght (L) 1998, Maptech, Inc.
SR 1260
Site 15
Inlet
Outlet
Site 16
Inlet
Outlet