HomeMy WebLinkAbout20041764 Ver 4_Modifications_20100928oak-n L04 V? C=FJ KimleyHom and Associates, Inc. September 27, 2010 SFP 2 ? ? Ms. Natalie Landry NC Division of Water Quality (DWQ) 3800 Barrett Drive Raleigh, NC 27609 Re: DWQ Project #04-1764 Response to Notice of Violation 2010 WQ-0012 Shiloh Crossing Shopping Center Wake and Durham Counties, NC Dear Ms. Landry: P.O. Box 33068 Raleigh, North Carolina 27636-3068 On behalf of Wal-Mart Stores East, LP, Kimley-Horn and Associates, Inc. (KHA) is submitting the enclosed additional information in response your letter dated June 28, 2010 regarding the above Notice of Violation. In order to provide complete responses to all of the items listed in the subject NOV, the following are provided: 1) Detailed responses for item nos. 3, 4, 5, 6, 8, and 9 listed in the subject NOV and DWQ's subsequent response dated June 28, 2010. As requested, specific documentation, analysis, implementation plans, and schedule are proposed for each item with a goal of completely resolving each issue. 2) A Modification request for the WQC (DWQ #04-1764). For clarity and simplicity we are providing the Modification request in a letter format with the intent that any approval could be an addendum to the existing approval only addressing the additional items. The Modification request is primarily intended for the proposed impacts to Stream No. 1 below Shiloh Glenn Drive, as described herein, as well as to address the inadvertent impact to and proposed restoration of the Neuse riparian buffer at Stream Impact No. 2 below level spreader no. 4. 3) A revised Stormwater Management Plan to address two specific stormwater BMPs (Ponds B and E). These BMPs were originally intended to be included as part of the Final Stormwater Management Plans for Phases II and III for DWQ Water Quality Certification (WQC) DWQ# 04- 1764 (See Stormwater Management Plans, following). Based on our understanding of the WQC, it will not be necessary to modify the WQC to address this issue. However, written approval from DWQ for the Stormwater Management Plan is required to satisfy the requirements of the WQC. In regards to Pond A, we believe it will be possible to re-grade and replant the pond to match the approved Stormwater Management Plan for Phase 1. Additionally, we also believe Level Spreader Nos. 1 to 4 ¦ TEL 919 677 2000 FAX 919 677 2050 C="O?'tes,iric. substantially comply with the approved Stormwater Management Plan for Phase I, except as described herein. The information presented here is intended to address the all of the items noted by DWQ. Once accepted in writing by DWQ, Wal-Mart will seek to implement the attached plans and modifications according to the proposed schedule. If you need any additional information, or if you have any questions, please do not hesitate to contact me at (704) 319-5698. Very truly yours, KIMLLEY-HORN AND ASSOCIATES, INC. Austin Watts, P.E. Enclosures: Responses to DWQ's Requested Responses Request to Modify the WQC Figures Stormwater Manage Plans Appendix i i ? ! I, °? +, 1' C? ?LLf ?; I ? I? 1 I 1, i6 I ?. ;4 i ?4[i? I ? t ,? ` ?, ?{?? k ?, ?? 1 ? '? I ?1 ? ? f? i ' `j?? ii . , ? ? i? E i ,? ?' ! ? i ?? t '. f ? ? ? ? i ,i ?..?. i ?? ' !`t I t??? } J t?? i ? i ;??! ,, i? !f(1 '?] ?? #1 ? ? ?? ?? k? r 1 ? , Inc. CMmn and Assocatesa=A Memorandum 12700 Park Central Drive Suite 1800 Dallas, TX 75251 To: Natalie Landry, Division of Water Quality From: Austin Watts, Kimley-Horn and Associates, Inc. Date: September 27, 2010 Subject: Additional Responses to Notice of Violation (NOV 2010 - WQ 0012) Shiloh Crossing The following responses are provided in addition to the responses provided by Wal- Mart dated April 30, 2010. These responses consider DWQ's Review of the Reponses to the NOV dated June 28, 2010 as well as feedback gathered at the meeting among Danny Smith and Natalie Landry of DWQ and Austin Watts and Todd St. John of KHA on May 26, 2010. The additional responses to the listed items from DWQ are in italics, below: Nos. 2 and 7) "Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices." "Provide NPDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program." Monitoring records have been requested and will be provided after receipt and review by Wal-Mart. Monitoring relative to Basin 2 (Wetland B) was discontinued once the overall site was stabilized( including areas immediately upstream of Basin 2). The monitoring records ceased during January 2010. No. 3) Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. The intent of the original culvert installation was to avoid altering the stream profile above and below the culvert and to allow aquatic life passage by placing the culvert 6" below the existing stream invert. In this situation, placing the culvert as described above resulted in the culvert being submerged because of a large bedrock outcrop immediately TEL 972-770-1300 FAX 972-239-3820 below the culvert outlet. The submersion of the culvert has resulted in aggradation within and for about 15 to 20 feet above the culvert inlet. To resolve this issue it is proposed that a notch be provided in the bed rock in order to lower the stream invert, creating a situation where the culvert invert is 6" below the downstream streambed invert. Please see the attached plans, documentation, and modeling results that support the proposed plan (Figures 1, 2, 3, and Appendix). The aggradation immediately above and within the culvert is caused by the fact that the culvert is submerged creating depositional conditions. Typically it is assumed a culvert will scour when the flow velocity within the culvert is 3 feet per second (fps) or greater, often referred to as the scour velocity. Under the existing (submerged) conditions the Shiloh Glen culvert will not reach a flow velocity of 3 fps when runoff discharges are less than 15 cubic feet per second (cfs). Most rain events will result in discharges less than 15 cfs within this system so sediment will tend to deposit in and around the culvert. The proposed plan would remove the submerged conditions, thereby reducing the discharge needed to reach the scour velocity from 15 cfs or greater to approximately 2.5 cfs. As such the sediment would naturally tend to transport downstream resulting significantly less aggradation. Also, it is anticipated that providing the notch in the bed rock will result in little to no change in stream functions for the impacted stream reach, since the current substrate is bed rock and the proposed substrate will also be bedrock. The table below summarizes the culvert performance under two different discharges and tail water conditions. The tail water conditions represented are the existing conditions versus the proposed conditions (cutting a notch in the bedrock downstream of the culvert). The discharges were selected to demonstrate the difference in culvert performance under the two tail water conditions. It is assumed that a 3 fps velocity would scour the pipe clean of sediment. In the proposed conditions (0.5 foot tail water) a discharge event that reaches 2.5 or greater cfs would scour the pipe clean of sediment. However, under the existing conditions (3 foot deep tail water) a much larger discharge event of 15 cfs is required to reach sour velocity according to the modeling results. In smaller, much more frequent discharge events (< 1 year return interval) as well as during the descending leg of larger events, the potential for aggradation within and around the culvert is relatively high in the existing versus the proposed conditions. As such, notching the bedrock to reduce the tail water condition to 0.5 feet would greatly reduce the potential for upstream aggradation that is occurring today. Upstream Conditions 30" RCP Shiloh Glenn Discharge Existing Conditions (3 ft tail water) Notched Bedrock (0.5 ft tail water) Depth (ft) Velocity (fps) Depth (ft) Velocity (fps) 2.5 cfs 2.4 0.51 0.52 3.4 15 cfs 2.6 3.1 1.3 5.8 It is also offered that the site be monitored the site for 3 years in order to document the stability of the system. The monitoring would include taking photos from the some vantage points, upstream, downstream, and at the culvert 2 times per year and submitting a brief memo to DWQ once per year documenting the results. Additionally, in the previous response documentation was provided supporting the fact that the existing system will not substantially alter stream functions as compared to the pre-existing conditions. In other words, the backwater created by the system only occurs at higher discharge rates and lasts less than an hour or two longer than a pre-existing conditions flood event. A report from the geotechnical engineer was also provided indicating that the road and retaining wall system were designed to withstand temporary impoundment resulting from flood conditions. (The previous response is included in the Appendix.) Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. No. 4) Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. The as-built conditions are depicted in figure 8a in gray. The buffer strip at level spreader 4 was inadvertently cleared during construction. It is proposed that the entire, cleared 50 foot Neuse buffer be replanted with native hardwood species as depicted in Figures 8 and 9. Level spreader 4 was designed assuming a completely forested filter strip. The plans also include a level spreader bypass channel that should resolve DWQ Response Item no. 9 as it relates to level spreader no. 4 as well. The proposed bypass channel is intended to segregate the bypass discharge from the diffuse flow in the buffer strip. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. No. 5) Provide a Plan that addresses non-diffuse flow in the Neuse Riparian Buffer Zones 1 and 2 for the entire site. Figures 4, 6 and 7 address the areas of Neuse buffer erosion (gullies) associated with the level spreaders, level spreader bypasses, and the outlet of Pond, as well as a small area of concentrated flow adjacent to the point where Shiloh Glenn Drive crosses Stream no. 1. The repair plans specifically address DWQ Response Item nos. 5 and no. 9 (Figures 4, 6 and 7). There is already an Operation and Maintenance Agreement (O&M) in place for these devices as part of the approved Phase I Stormwater Plan. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. No. 6) Provide documentation that shows the final stormwater management facilities for Phase 1 were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. The responses to item Nos. 4, 5, 6, and 9 document the instances where the stormwater management facilities were not constructed according to the approved stormwater management plans or where they are not performing to the intent of the plans. Each of the responses above proposes the remedy to address each issue noted in the above- listed items. In regards to Wetland A, based on the as-built survey provided by the contractor, it should be physically possible to bring Wetland A into compliance with the approved Phase 1 Storm water Plan (See Figure 5). Figure 5 depicts the as-built survey contours in blue overlain with the approved plans contours in red. It is proposed that the contours between elevation 361 and 354 could be re-graded to substantially achieve 3:1 side slopes. Side slopes above the 361 contour adjacent to the retaining wall and the development to the north should not be considered as part of the Wetland A BMP, and as such, could be steeper than 3:1. In order to bring the pond bottom into compliance with DWQ requirements, top soil will be brought in to establish final elevations below the 355 contour from the top of the shallow land and below, but not including the forebays or micropools. Wetland A can then be replanted per the approved plans. Also, an ICPR model was run to determine if the fence over the emergency spillway would impede water flow or block debris resulting in impeded water flow during a large rain event. The outcome of the model substantiated that the stage for the 100 year, 24- hour storm event is 0.63 feet above the stage of the emergency spillway. Where the bottom of the fence is less than 0.63 feet above the spillway a potion of the bottom of the fence will be removed to satisfy the required depth over the spillway to convey large storm events. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of April in order to complete the herbaceous vegetation planting in optimal conditions. No. 8) Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. Please see attached stormwater management plans for conversion of sediment basins nos. 2 and 7 (Ponds B and E) into stormwater wetlands to comply with the Neuse Buffer Rules stormwater requirements. Providing diffuse flow was evaluated for compliance with the Neuse Buffer Rules, however, in these two situations, physical constraints preclude the ability to reliably achieve diffuse flow. As such, it is proposed that both basins be converted to stormwater wetlands as the means of meeting stormwater requirements. Originally, it was intended that phases 2 and 3 of the development would continue and that a stormwater plan based on the conceptual plans provided would be provided. However, to our knowledge, there are no current plans to develop the site. As such, the size and configuration of the stormwater wetlands will be based on the existing watershed characteristics which have minimal impervious cover. It is understood that should development occur in the future, it may be necessary to reconfigure the stormwater wetlands to accommodate the additional impervious cover. However, we do not believe that the stormwater wetlands would function properly if designed based on potential built-out conditions since insufficient runoff would be generated to maintain the hydrology of the system based on the current site conditions. However, the designs provided could accommodate future development by leaving the current basins mostly intact constructing the stormwater wetlands within their existing footprint, and modifying the outlet structures (which could be re-modified in the future). Providing the stormwater wetlands in this manner would meet the stormwater requirements of the Neuse Rules and would minimize the disturbance required to accommodate future development plans. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of April in order to complete the herbaceous vegetation planting in optimal conditions. No. 9) Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. All of the level spreaders appear to have been constructed and are functioning per the intent of the plans except as specifically noted hereafter. Erosion swales/gullies have developed at level spreaders 1 and 2. The proposed repairs are proposed in Figures 6, 7, 8, and 9. Additionally, level spreader 3 was constructed 3 feet shorter than designed (56 feet versus a 59 foot design length); however, it appears to be functioning adequately, and, as such, it is recommended that it not be modified at this time. There is already an Operation and Maintenance Agreement (O&M) in place for these devices as part of the approved Phase I Stormwater Plan. Schedule to complete: Assuming cooperation from all parties, this can be completed by the end of February. M"-Hom and Amciates, Inc. September 27, 2010 Mr. Ian McMillan, Supervisor NC Division of Water Quality (DWQ) 2521 Crabtree Blvd., Suite 250 Raleigh, NC 27604 Mr. Jamie Shern Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Re: SAW-2004-21479-292 and DWQ Project #04-1764 Request to Modify Permit Verification and Water Quality Certification Shiloh Crossing Shopping Center Wake and Durham Counties, NC Dear Mr. McMillan and Mr. Shern: ¦ P.O. Box 33068 Raleigh, North Carolina 27636-3068 On behalf of Wal-Mart Stores East, LP, Kimley-Horn and Associates, Inc. (KHA) is submitting the enclosed request to modify the above referenced approvals to additional, temporary impacts to Stream No. 1 (UT to Stirrup Iron Creek) and restoration of inadvertent impacts to Neuse Riparian Buffer along Stream No. 2 with additional impacts from the level spreader 4 bypass channel. This request is required as part of an effort to resolve a Notice of Violation (NOV-2010-WQ- 0012) from the Division of Water Quality. The information enclosed herein, provides an explanation and justification for the proposed impacts. The documentation associated with this request is in addition to the previous submittals and is intended to serve as an addendum to all of the previously submitted information for simplicity and clarity. Figures la, lb, 8a, and 8b depict the additional impacts in relation to previously approved impacts. Additionally, since the impacts jurisdictional areas are temporary in nature, no mitigation has been proposed at this time. The impacts are summarized below: 1) Temporary Stream Impacts to Stream No. 1 (Figures la, lb, 2, 3, Ind 4) - A detailed description of the impact and need for the impact can be found in the response to Item No. 3, "Additional Responses to Notice of Violation (NOV 2010 - WQ 0012)" provided herein. The impact will be temporary in nature and should not substantially alter stream functions. Additionally, the construction access would be through a over-head utility ¦ TEL 919 677 2000 FAX 919 677 2050 r]=FJ Kimley-Horn and Associates, Inc. easement corridor with maintained vegetation. Any temporary buffer impacts from construction would be returned to original grade and re- planted with a permanent native grass seed mix. Additional temporary stream impact requested: 75 feet 2) Riparian Buffer Restoration adjacent to Stream No. 2 (Figure XX) - A detailed description of the impact and need for the impact can be found in the response to Item Nos. 4, 5, and 9, "Additional Responses to Notice of Violation (NOV 2010 - WQ 0012)" provided herein. Except for the impacts from the level spreader bypass, the impact is temporary in nature since the buffer will be re-forested. Permanent ft2 Restoration ft2 Total ft2 Zone1 168 754 922 Zone 2 52 1,108 1,160 The proposed modifications to the Stormwater Management Plan should not result in any additional impacts to jurisdictional features or Neuse riparian buffers. It is assumed that the proposed changes to the Stormwater Management Plan can be handled under the current Water quality Certification pending additional written approval of the Stormwater Management Plan for the changes. If you need any additional information, or if you have any questions, please do not hesitate to contact me at (704) 319-5698. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Austin Watts, P.E. Attachment: Check to DWQ for $240 Application Fee Prepared by Josh Allen CMF,:==,R KI\CHL-LDEV\015476 Wal-Mart SlteClvil\ANGEL0NI\039 Morrisville WM\Submittals\100809_Todd St, John\PLAN PROFILE.dwg r D z KimleyHom andASSOCiaM,Inc WALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE MIN CKWOM PW OW 3UnK 330 OWMM NORM «eAR°"'"n2" MORRISVILLE, NC CULVERT PLAN AND PROFILE 1b THIS DOCUMENT. TOGETHER MTTN THE CONCEPTS AND DBMS PRESENTED HEREIN. AS AN INSTRUMENT OF SERNCE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR MHCH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WORM WRITTEN AUTIdtl7ATTOH AND ADAPTATION BY DMLEY--HORN AND ASSOCIATES, INC. SHALL K W INOUT UAMJTY TO IOHTEY-HqW AND ASSOCIATES INC. KI\CHL-LDEV\015476 Wal-Mart S1teClvll\ANGEL0NI\039 Morrlsvllle WM\Submittals\100809_Todd St, John\PLAN PROFILE,dwg C) c r A m -1 <<< M M < X m ? Z < ? ? ? X + CD -1 i-. N W ? _ < T O W m O T -61 m X o 1 ' O a 0 Tv 1? Q co) m o n n Z o C m + C:D ' r < m m 01 M m ?- D Z -1 < p CD m M Z z 0 ? X Kimley-Ham andAwiat Inc WALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE 1 C NIATIE PAIN [MINE WARLOM WON „°M=" MORRISVILLE, NC CULVERT PLAN AND PROFILE 2 rAe E? m-aMs THIS DOWNER. TOGETHER wTi THE CONCEPTS AND DFS"S PRESENTED HEADN, AS AN INSTRUMENT OF SEWM IS INTENDED ONLY FOR TE SPECIFIC PURPOSE AND CLIENT FOR MCH IT WAS PREPARED. ROM OF AND IMPROPER REL ANCE ON MS DOCUMENT TANDUT MTIEN AUUDIMIATI N AID ADAPTATION BY IDLIEY--HORN AND ASSOCIATES, INC. SHALL DE WIIIMT UAIMUTY TO NIINEY-HORN AND ASSOC&ATR, INC KI\CHL-LDEV\015476 Wal-Mart SlteClvll\ANGEL0NI\039 Morrlsvllle WM\Submittals\300809-Todd St. John\PLAN PROFILE.dwg . { .. m ' V, . G ? • O n • r ? 7 Z Z o ,I Z 0 fA O D ? ,I 2 M Q .j Z T oo• . - .. : XO ti. ? D 7C m KimleyHom M" annditwiftInc WALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE °""°""?""?"°' =7 MORRISVILLE, NC CULVERT PLAN AND PROFILE 3 ?." 7108 OOGEENr. 10CE71FR WIN 71E CO 099 AND purrs PRuDnED HEROK AS AN IMM MENT OF SLW IS INTENDED MLY FOR 71E 9WMC PURPOSE AND CMFNT FOR Wia1 R WAS PRWAAM Hoof OF AND NPROPER REMANCE ON INS OOWMENT W Mff WSTIEN AVM=ZA710M AND ADA"AW3N RY IOIRLY-HMN MO AS.SMATM IM SHALL RC Un=T UANUTY 70 RYIEY-HOW NO ASS MUSE lW- K1\CHL_LDEV\015476 Wal-Mart SlteCiv1l\ANGEL0NI\039 Morrisville WM\Submittals\100809_Todd St, John\PLAN PROFILE,dwg H c a . mm g H tS 3m _jz r U m 41 ; ;u p01?q D 1 y e i 1?1 MAW ?1 =62P Abu PH Z o ? Z 0> >g8? zG 90 o s8 2 o oz-0 ral ^ D z E v O ?r er _ t F O 3 n v co) Z - D O N o 3 3 D ? ;z X " M d M N f A r PG N A Z! m r I 1 1 o? ° F = ? s c7 A r ead a a t? m ( S =Fn3 1 ? Kim"' Hom andAesoe0,,1r, FALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE «. avwarR: TARN DANE rr `R, • SS" MORRISVILLE, NC FCULVERT PLAN AND PROFILE 4 TM DOUNIM, TOCETM 177H 7HE CONCEPTS AND DESN71I PRESENTED NEROK AS AN NISTRLWIT OF SERML IS 041908), ONLY FOR THE SPECIM PURPOSE AND CLANT FGR 11*9 IT WAS PREPARED. ROM OF AND HIPROM RD1Al/Cl M INS =11110IT 771DOW 110117701 AURDIR7A71011 AND ADAPTARON BY RNLLY-HORN AND ASSOOIA7M VIQ 91A1L RE MRDOT MINL17Y TO NYILY-M M ND ASS MTM W_ KI\CHL-LDEV\015476 Wal-Mart S1teC1vl(\ANGEL0NI\039 Morrlsvltte WM\Submittats\100809-Todd St. John\PLAN PROFILE.dwg ill ? I ?? ? '? - ? - ? -?.?\\, . ;,\ ?,? I,11 1 ?R? %IM 111\?I I 44 0 \\?\; \\\\\,\\\ ?\ it ?1??? 1111 \\?\?\?\ \?? \ ? ? 1 ? ,\, 1? \111111` \\?\\\\ \ ?\ I ? ?I P ?\l\ ?\\n\\\ \?? \-'?i/ I I \`\I 1\1\, \\\\\\ \\I?\ ?`??\??\ \?\ \\\ x \ - 1 4 \\\ 111 \ \ \ \ \\ \ \\?\? \?? \\ ?\ \\ 8 ?? ?? - ? 1111 1111 /5y£ 1111 111 11 1 l L VJ _ D 11 om I I I I I I I I I I i r m 8 8 N N G) z z z 0 e 8 0 8 z 9 Z -4 ;a X Z Z ? ? A 0 M KimleyHom andAmiates,lnc WALMART AND SAM'S CLUB SHILOH GLENN DRIVE FIGURE NEBI NNNTImTE PANN (MINE SUITE m 04MLM MW CAIK)""'°" MORRISVILLE, NC CULVERT PLAN AND PROFILE 5 FA! bDO usaNe THIS DOCUMENT, TOGETHER VA7H THE CONCEPTS AND DESIGNS PRESENTED HERON, AS AN INSTRUMENT OF SERNCL IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR MECH IT WAS PREPARED. REUSE OF Alb IWROPER IEUANCE ON IBS DOCUMENT INT OUT MWMN AUTHORIZATION AND ADAPTATION BY gNLY-HIOIM AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KMEEY-HORN AND ASSOCIATES, INC. ? ? nssus?es?sv `NVx?av'?3; iM,oiu3e uunm ?vm'inisiaeow ? ? ? W ?? .3aH,s s,o?as pose .w,o>s?sns wn.sn m, N-d 39VNIVNO ONV ON111-0 w W d' JI11 "0 3 O _ xs,rwoo,w3w,o,3?a wo.,dM wns w-„-ss,-, 3A NO NN310 HOIIHS mss cO ?, ? ? W ? ?? 00-OSLb oN 3ilO1S ? C7 C7 E 4 a W? i W 0 1?1MYY 7MM 3111Asiauow ianw.irM Ills; W W y a FIg° 18- a,_a °6a° g ®? III - a t. xl t ? I ° i 1 R fly! i 1 ul,l;l U s a a p?a?os E1 W , , " ? ? m ? i ?e Wwe € p a €e s a ?saY= 4"s?`? a e e? n g ??'E 7tl W?<"€ m?a z ? Wm a? a as ?'???a on U jg? .I=m? 35- (D z @$ m° i<e =a,as aao sus ge z. r 5 16000008-90 -oN 103mO d AIIIASRRIOW JO NMOl IIIIIIAII 1111 C7 ?s c?"'is.rl.?3. 3s ,nnm s?,sns aur?nnv, nu m s "' m W 'a36 ? K ? wio?3e, ,uuno??vM'3„nouunow NVId 3JVNIb'210 NNV JNIdtl2iJ a g 3:#p p 3 .3, 'rvao,3u3a ?,o`,nM wrs ou-,?zs?-? 3ARJO NN310 HO-1IHS r '1? ?A p 'tee 00-OSZ6 oN 321 M1 o z' m r ?] E? W s 121MW 1MM 13111ASMOMILMMM w o ? o t $ N Y €? a Wg z$eg?= (!u) a ` S Q zr ? 08 U: ? 8 U @. U` ? k e3 ?6 ?? ? I3 =e ti ? h / / ?, to 1 I I I J a=" } a ?`?r ? ` k?ks a 8£x, 4 u a E E @aQO €, ? a g <64 5 g S 3w?a 9 tl? g =" Cy a? s o zpi w ? O E O .? OIL s??J °Fb a ??? alb Q 04: ?mi F m??s adS S„gm € N Aso, ON 7 GY3?t a U . N I ( o I I i\ I F% Ili I y F ; y . n ?I 4 I , c Prepared by Josh Allen [EF = Prepared by Josh Allen [zF1 = C 11 u TI '171 -In FF 1"T 7FrIM 77" i 1 Stormwater Management Plans LI=/J Kimley-Horn `IBC and Associates, Inc. PROPOSED STORMWATER WETLAND Project Information Project Name: Shiloh Crossing KHA Project #: 015476039 Designed by: tsj Date: 12/2/2009 Revised by: Date: Revised by: Date: Design Resource: NCDENR - Stormwater Best Management Practices (July 2007) Site Information Sub Area Location: Stormwater Wetland E (Sediment Basin 7) Drainage Area (DA) = 9.5 Acres Impervious Area (IA) = 0.00 Acres Percent Impervious (I) = 0.0 % Required Storage Volume (First Flush): Design Storm = 1 inch Determine Rv Value = 0.05 +.009 (1) = 0.05 inlin Storage Volume and Surface Area Required = 1,724 cf/sf (above Permanent Pool) *Assume surface area based on 1' depth of storage volume. Modified Wetland Zone Reauirements: Depth relative to Perm. Pool* Zone ID % Required Required Surface Area sf Provided Surface Area sf % Required Provided %Actual Provided 0-12" above Shallow Land 30-40% 517 to 690 2,400 139.2% 34% W-6" below Shallow Water 40.00% 690 3,200 185.6% 45% 18"-36" below Foreba 10.00% 172 750 43.5% 10% 18"-36" below Non-foreba 5-10% 86 to 172 810 47.0% 11% 7,160 415.3% 100% Summary of Proposed Ext. Wetland Bottom of Forebay/Micropool Elevation = 322.00 ft Permanent Pool Elevation = 325.00 If Temporary Pool Elevation (1" Event) = 0.50 ft* Top of Berm Elevation = 329.50 ft Permanent Pool Surface Area = 4,900 sf Temporary Pool (1" quality storage) = 1,700 cf Area @ Top of Shallow Land = 7,300 sf Side Slopes of Pond = 3 1 Length-to-width ratio = 3 1 Kimley-Horn CEFland Associates, Inc. Proposed Wetland Volumes Water Quality Volume Water Quality Volume for 1" Rainfall required = 1,724 Contour Incremental Accumulated Countour Area Volume Volume, S Stage, Z sq ft cu ft cu ft ft 322.00 133 0 0 -3.50 323.00 374 254 254 -2.50 324.00 840 607 861 -1.50 325.00 4,900 2,870 3,731 -0.50 325.50 7,350 3,063 6,793 0.00 Temnnrarv Pnnl Vnlump Countour Contour Area Incremental Volume Accumulated Volume, S sq ft cu ft cu ft 325.00 4,900 0 0 325.30 6,370 1,691 1,691 325.50 7,350 1,372 3,062 Deen Pools : Forebav Volume Countour Contour Area Incremental Volume Accumulated Volume, S sq ft cu ft cu ft 322.00 64 0 0 323.00 206 135 135 324.00 391 299 434 324.50 757 287 721 Deeo Pools : Non-Forebav Volume Countour Contour Area Incremental Volume Accumulated Volume, S sq ft cu ft cu ft 322.00 56 0 0 323.00 169 113 113 324.00 449 309 422 324.50 819 317 739 Permanent Pool Temporary Pool I 1 M Wakk Wet Detention Basin INCREMENTAL DRAWDOWN METHOD Project Information Project Name: Shiloh Crossing Wetland E KHA Project #: 015476039 Designed by: TSJ Date: 9/2010 Checked by: Date: Date: Design Resource: NCDENR - Stormwater Best Management Practices (July 2007) Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Q3 = 0.0437 Co * D2 (Z-D/24-Ei)A(112) Q2 = 0.372 Co * D*(Z-Ei)Ai3nl Q, =0 Orifice Diameter (D) = 1.000 in Cd = 0.6 Ei = 325 Orifice Inv. Zone l Range= 325.00 to 325 Zone 2 Range = 325 to 325.0833 Zone 3 Range = 325.0833333 to 325.5 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time s ft cu It It cis min 325.00 4,900 0 0.00 2 0.000 325.05 5,145 251 0.05 2 0.002 1,677 325.10 5,390 263 0.10 3 0.006 693 325.15 5,635 276 0.15 3 0.009 532 325.20 5,880 288 0.20 3 0.010 460 325.25 6,125 300 0.25 3 0.012 418 325.30 6,370 312 0.30 2 0.037 142 325.35 6,615 325 0.35 2 0.046 117 325.40 6,860 337 0.40 2 0.056 99 325.45 7,105 349 0.45 2 0.067 86 325.50 7,350 361 0.50 2 0.079 76 Total 3,063 4,302 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 3,063 cf Total Time = 4,302 min Total Time = 2.99 days Max Q= 0.079 cfs O?oF WATF9pG WDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Shiloh Crossing - Stormwater Wetland E Contact name Austin Wafts Phone number 704-319-5698 Date September 1, 2010 Drainage area number Phase III IL DESIGN INFORMATION Site Characteristics Drainage area 413,820.00 ftz Impervious area 0.00 fe Percent impervious 0.0%% Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth N/A in 1-yr, 24-hr intensity in/hr Pre-development 1-yr, 24-hr runoff ft 3/sec Post-development 1-yr, 24-hr runoff ft3/sec Pre/Post 1-yr, 24-hr peak control ft3/sec Storage Volume: Non-SA Waters Minimum required volume 1,724.00 ft3 Volume provided (temporary pool volume) 3,060.00 ft3 OK Storage Volume: SA Waters Parameters 1.5" runoff volume N/A ft 3 Pre-development 1-yr, 24-hr runoff volume ft3 Post-development 1-yr, 24-hr runoff volume ft3 Minimum volume required ft 3 Volume provided ft3 Outlet Design Depth of temporary pool/ponding depth (Daa,tJ 6.00 in OK Drawdown time 3.00 days OK Diameter of orifice 1.00 in Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. Coefficient of discharge (CD) used in orifice diameter calculation 0.60 (unitless) Driving head (Ho) used in the orifice diameter calculation 0.50 ft OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 1 of3 Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) Shallow Water bottom Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) This design meets Option #2, Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants recommended in Shallow Water Area: Herbaceous (4+cubic-inch container) Number of Plants recommended in Shallow Land Area: Herbaceous (4+cubic-inch container), OR Shrubs (1 gallon or larger), OR Trees (3 gallon or larger) and Herbaceous (4+ cubic-inch) Number of Plants provided in Shallow Water Area: Herbaceous (4+ cubic-inch container) Number of Plants provided in Shallow Land Area: Herbaceous (4+ cubic-inch container) Shrubs (1 gallon or larger) Trees (3 gallon or larger) and Grass-like Herbaceous (4+ cubic-inch) 7,300.00 ftz 2,400.00 ftz 33%% 3,200.00 fe 44%% 750.00 ftz 10% % 810.00 ftz 11% % 7,160.00 ftz -140.00 ftz 325.50 ft amsl 325.00 ft amsl 324.50 ft amsl 323.00 ft amsl 322.00 ft amsl (Y or N) ft amsl (Y or N) 6.00 in OK OK Insufficient shallow water area. OK OK Enter data into the shaded cells in this section. OK OK 6.00 in OK 6.00 in OK 24.00 in OK 36.00 in OK N (Y or N) OK 800 600 96 12 and 480 Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Does project drain to SA waters? If yes, What is the length of the vegetated filter? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build-out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: Approximate wetland length Approximate wetland width Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK N (Y or N) Excess volume must pass through filter. 0.00 ft Y (Y or N) OK (Y or N) (Y or N) 2.18 :1 OK 131.00 ft 60.00 ft 7,860.00 ft2 This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Y (Y or N) OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 3 of 3 L7_L? Kimley-Horn and Associates, Inc. PROPOSED STORMWATER WETLAND Project Information Project Name: Shiloh Crossing KHA Project #: 015476039 Designed by: tsj Date: 1212/2009 Revised by: Date: Revised by: Date: Design Resource: NCDENR - Stormwater Best Management Practices (July 2007) Site Information Sub Area Location: Stormwater Wetland B (Sediment Basin 2) Drainage Area (DA) = 2.8 Acres Impervious Area (IA) = 0.06 Acres Percent Impervious (1) = 2.1 % Required Storage Volume (First Flush): Design Storm = 1 inch Determine Rv Value = 0.05 +.009 (1) = 0.07 in/in Storage Volume and Surface Area Required = 697 cf/sf (above Permanent Pool) 'Assume surface area based on 1' depth of storage volume. Modified Wetland Zone Requirements: Depth relative to Perm. Pool" Zone ID % Required Required Surface Area sf Provided Surface Area sf o? Provided Actual % 0-12" above Shallow Land 30-40% 209 to 279 1,970 282.5% 43% Y-6" below Shallow Water 40.00% 279 1,287 184.5% 28% 18"-36" below Foreba 10.00% 70 546 78.3% 12% 18"-36" below Non-foreba 5-10% 35 to 70 757 108.5% 17% 4,560 653.8% 100% Summary of Proposed Ext. Wetland Bottom of Pond Elevation = 356.00 ft Permanent Pool Elevation = 359.00 ft Temporary Pool Elevation (1" Event) = 359.50 It Top of Pond Elevation = 363.00 ft Permanent Pool Surface Area = 2,590 sf Temporary Pool (1" quality storage) = 1,788 cf Area @ Top of Shallow Land = 4,560 sf Side Slopes of Pond = 3 : 1 Length-to-width ratio = 3 1 CE" Kimley-Horn CEand Associates, Inc. Proposed Wetland Volumes Water Quality Volume Water Quality Volume for V Rainfall required = 0 Contour Incremental Accumulated Countour Area Volume Volume, S Stage, Z sq ft cu ft cu ft ft 356.00 158 0 0 -3.50 357.00 430 294 294 -2.50 358.00 718 574 868 -1.50 359.00 2,590 1,654 2,522 -0.50 359.50 4,560 1,788 4,310 0.00 Permanent Pool Volume Contour Countour Area Incremental Volume Accumulated Volume, S sq ft cu ft cu ft 359.00 2,590 0 0 359.50 4,560 1,788 1,788 Dean Pools : Forebav Volume Countour Contour Area Incremental Volume Accumulated Volume, S sq ft cu ft cu ft 356.00 64 0 0 357.00 135 100 100 358.00 227 181 281 359.00 564 396 676 Deere Pools : Non-Forebav VnIuma_ Countour Contour Area Incremental Volume Accumulated Volume, S sq ft cu ft cu ft 356.00 129 0 0 357.00 312 221 221 358.00 493 403 623 359.00 757 625 1,248 Permanent Pool Temporary Pool =.ak Wet Detention Basin INCREMENTAL DRAWDOWN METHOD Project Information Project Name: BMP Site Hwy 601 and 218 KHA Project #: 015476039 Designed by: TSJ Date: 5/19/2009 Checked by: Date: Date: Design Resource: NCDENR - Stormwater Best Management Practices (July 2007) Water Quality Orifice * Incremental Determination of Water Quality Volume Drawdown Time T Zone 3 Q3 = 0.0437 Co' D2 (Z-D/24-Ei)AI'12I Zone 2 Q Q2 = 0.372 Co * D*(Z-Ei)Al3"2I Zone 1 l 1 Q, = 0 Orifice Diameter (D) = 0.750 in Cd = 0.6 Ei = 359 Orifice Inv. Zonal Range= 359.00 to 359 Zone 2 Range = 359 to 359.0625 Zone 3 Range = 359.0625 to 359.5 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu It It cfs min 359.00 2,590 0 0.00 2 0.000 359.05 2,787 134 0.05 2 0.002 1,197 359.10 2,984 144 0.10 3 0.004 622 359.15 3,181 154 0.15 3 0.005 505 359.20 3,378 164 0.20 3 0.006 451 359.25 3,575 174 0.25 3 0.007 420 359.30 3,772 184 0.30 2 0.028 111 359.35 3,969 194 0.35 2 0.035 93 359.40 4,166 203 0.40 2 0.042 80 359.45 4,363 213 0.45 2 0.051 70 359.50 4,560 223 0.50 2 0.059 63 Total 1,788 3,613 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 1,788 cf Total Time = 3,613 min Total Time = 2.51 days Max Q= 0.059 cfs All A o?OF W AT ?9QG WDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, tilled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Shiloh Crossing - Stormwater Wetland B Contact name Austin Watts Phone number 704-319-5698 Date September 1, 2010 Drainage area number Phase II 11. DESIGN INFORMATION Site Characteristics Drainage area 121,968.00 fe Impervious area 2,523.00 ftz Percent impervious 2.1% % Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume: Non-SA Waters Minimum required volume Volume provided (temporary pool volume) Storage Volume: SA Waters Parameters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff volume Post-development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Outlet Design Depth of temporary pool/ponding depth (DPiarns) Drawdown time Diameter of orifice Coefficient of discharge (CD) used in orifice diameter calculation Driving head (Ho) used in the orifice diameter calculation N/A in in/hr ft3/sec ft3/sec ft3/sec 697.00 ft 3 1,788.00 ft3 OK N/A ft3 ft3 ft3 ft3 ft3 6.00 in OK 2.50 days OK 0.75 in 0.60 (unitless) 0.50 ft Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 1 of 3 Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) Shallow Water bottom Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) This design meets Option #2, Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants recommended in Shallow Water Area: Herbaceous (4+cubic-inch container) Number of Plants recommended in Shallow Land Area: Herbaceous (4+ cubic-inch container), OR Shrubs (1 gallon or larger), OR Trees (3 gallon or larger) and Herbaceous (4+ cubic-inch) Number of Plants provided in Shallow Water Area: Herbaceous (4+ cubic-inch container) Number of Plants provided in Shallow Land Area: Herbaceous (4+ cubic-inch container) Shrubs (1 gallon or larger) Trees (3 gallon or larger) and Grass-like Herbaceous (4+ cubic-inch) 4,560.00 flz 1,970.00 fe 43% % 1,287.00 flz 28%% 546.00 ff 12%% 757.00 fe 17% % 4,560.00 ftz 0.00 fe 359.50 ft amsl OK Insufficient shallow land area. Insufficient shallow water area. OK Insufficient non-forebay deep pool area. OK 359.00 ft amsl 358.50 ft amsl 357.00 ft amsl 356.00 ft amsl (Y or N) ft amsl OK (Y or N) 6.00 in OK 6.00 in OK 6.00 in OK 24.00 in OK 36.00 in OK N (Y or N) OK 350 500 80 10 and 400 Form SW401-Wetland-Rev.6-11/16/09 Parts I and 11. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Y (Y or N) OK Does project drain to SA waters? If yes, N (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? 0.00 It Are calculations for supporting the design volume provided in the application? Y Y or N) ( ) OK Is BMP sized to handle all runoff from ultimate build-out? (Y or N) Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? (Y or N) The length to width ratio is: 2.92 :1 OK Approximate wetland length 105.00 ft Approximate wetland width 36.00 ft Approximate surface area using length and width provided 3,780.00 ftz This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 3 of 3 ww- 11 d a a � o z a a` w a M w M m -o c m ,o a) a ` 0 3 3 0 L U Q C N m G � C n a � O J A I � 3 E `o 11 d a a � o z a a` c z sNOlsln38 31va ON OOOV-ELZ (6LV) :131 VNIIMT VO HiTION o m p ? `= Q 0SS09I,LZL SVSNV)*AV '3111ANO1N39 .1LNnOO 3NVM '3111ASI"Oh o 13Ma1SHI ,3SWOZ ibnoosMlansONVVSI,MHON 9-GNV-113M m ° " X31dMOO1N31AdO13A30 NO11VM MIS o see o gas _ g K J LS 00-OSZI" 4'oN 32fO ?AiVMMJO1S s 7., LIJ _ a U Y -?z a :1N3110 :ID708d i , .L ,i ,S'0 0 .l IQ ro?sF ? SE, 9 E . ?c SOS' ?O O?00 OS' ??000+ 00+ `?-}- OyF 8y` ? m tD Cr1 ? 1%, Q j! t/-LS c 00+01 I ?, s \ s??s 06,E s? 8 s?, Nns F` 1? T ov. -,t, 09" o/ Qo_ + z o r + 52 O ++ a O U ? w L N r m + z = O g w ? w a D N O ,. s I$ b In yd O n O O d- N O 00 cD - (D CD CD I.f) )n 1n - r7 r7 r7 r? r7 r7 III I I- 1 II I I 111= 11= ' - III. -III- - III m - w a o I -- O - VIII Z I II- I_-I z II _I J w Q IM IIIIII ? > III-I111- m a 3 w m 0 D 03 Q 0 U - a Z 1'`> W O U X -Ti - -- w Z L 'p `I I II-„1, II i1 _ - I III I ?i -1I1=IIIIII, I II ?? 00 -III-III J? il- LC) n - In ?z N N o 00 cD co cD cD 1n 1n )n O r? 7 r? n Lc) b 3 w z 5 m zz J 3 w 3 0 O o.V 10-nua Du-- WM\°N°f ADN WC\6u!I W- i--NM - 6C0911S10\1-w,n- = } SNOISIA3H 31V0 ON O? M S u OOOV-CLZ (6LV) :131 VNMHVO H18ON O '? Q rc OSS"LLZL SVSNVN16V'3111ANO1N30 A-LNnOO 3NVM '311IAS18HOW 0 c °?g ?;, Z y 133a1SHIOL3S00Z i8noOS3wsCINVVSAMHON ^ a S X31dW0 3-aNdl13M 'T 01N3WdOl3A30 V NOIWM WVS O O - 0Nl0-96 t-O O 1 "_ bas o 00-09Zb'ON 3L101S ?131f/MMOlS m m ,? U ® _ - , - J.ZIVV VM 311IASRRlOW - iavw nrM a_ uu o..pZp-nua Oauaoq 4^C49\aplol AlN pA0\6u?oaq llj? 11 -IOM - 6[09L1S I0\lotuauxn?vu?itltl\ N ? C ?' p SNOISIA3a 31tl0 ON Nb?d O M 0004{LZ (6L4) 131 VNIlOaVO H16ON O U OSSO9LLZL StlSNb'NaV '3llIANO1N3B AIN0003A M'3ll1ASiaaOW p r- M NS_ Z 133x15 H10L 3S LOOZ Q) N C g Sn? N X3ldWOO 1N3WdO13?30 NO1ltlM WHS 1af100 S3laf1S ONtl 49 AMH ON ON IlN`dId O O a 9-96L-O C) 8-dNbl13M U _ g ??'a '?N'83flo18 00-09Z4'ON 32 01S m r m w ° JaVV VM 3111ASIMlOW-J]ltlW 1VM 2i31bMW2iOlS ?Y"saaawi` d ° :1N3110?i?3road ?3uu I Z 0 a a 4 X ? a a a a I ' ' a j a + a a a a I ? -. - I ' y' a a 1 a t a s .^ 1 -I G i f 1 J / / / II ID ? / < / a a a a a k V; cyl o, l zy co l r, N_? , I n vv ? ro i 357 n 356 'IT y I , / I / t 1 D ./ ,/ I I 5 J ?•' .? / / i 357? --,358 ?. I I I cl! w / .' ?? lri 1 ; i' / / N J J J o O W LLJ i? i m Z • o f O O << JJ i cn c/) cn a- a- z Z Z o O c N M CV w W I ?? O N ? ma ?a ??o oo o? N .6 O O ??? O - < < W W z o w o w a i " ° C J s ° ww oa os cxi?oom 3 m?via o?zo?e ow ww x z xw in xwF ]a In zF m ?w ZN o p Ln o W N J ?., .- >N 0 H Q Q aoia a za °?? a o °oN Fpm °¢a 3 omzz m ° F o: ? -- o ? ° m ? N > w N O O _ ~ O ? °o e ° i?? wu °° ° mm ia a>°°-JZao r? ?cai3 ww a o?? ?mmw° m o? ? ¢ °E?° o?0 3? z ?w z w O p O O p O Q .J W I., aw w - N x Y i o ? oa o°n °o<m?Jw w?wAz ooaw°?X o°3oao°°? o°O3iwm ,? w° v oo ? o z O D 3O L •u p, + O W W ?w3z y UQ s < N ., j m owimool F w OZ z o° ma a°rcv,oo>?°a ma ?a a°o o z m ? W U O U U C N p O O U s_ d. Cl Cn Cf) w QO Ja ° oozo??o<°`o?Si 1 F? myna>? >?°?w°o? ?ma °a O x In ? ° z (n Q J 0? U J U W W FM °?°=FW oa°¢Zp z ir °°§>r°a w ¢wa y 8Zmc a°w Zm xoZ° xr oZ w°Q°U 1Z?? mao m °J m o ?? ¢ .r a d°? z pia u ? w a ~ W J rn V m J z w ? o a? ? l? ° Wx a Nw3? ?Fw¢ a Q°wm ?O V 3 J ?o W 7 Z V)? a zl'+w o° a o o + ! w m?w °m z o?Ywao?oam?zJOaQUI ??oo?o ????°a?o° rwoa? ? ' ° z F ° ~ U) U) O W Q Q ??aoa u °w 3o° ?o ' ,owzaa?°oz? az mw?o°°ww° ` °o¢a w ° m o?woao?vai°o°?? ¢¢rz?? Amin L?IN?Naw oaa - Oj xwz 4? m ??°?I?z °NEZZQwnQ ?o, z w 3>t/IwoO FwwU°a ? •? -3 CD ++ Z W n V) L? 00 w »ozd3a?z mwm?°mawoa zana?na ar >? w??JZawzFaw ? m m 53? ?N ln?olna°'-ozaao ?wF~ o?u`?aomaw omttrto?zooxQ lzn mo aaoxwr wzooow Z O O V) (n .O O - C) U = N7 ? wa o x aa mwywwwa \ ... .. .. -. w _ J m ? aoa ??o3mo>oZ?? w az ¢ O _O C C O O Q Q U?? r wwNwQwQ QOw 6?= c>Z°p o muoi w oar S ?w Fm ?o`^ol„m?aa?or J? woi to zp?l"?Qa????z?oz°aN 7 d d. p O C p -p ?? N U = H H J z? z`a io?waw9 on??2°E o ?a?FwoyaOOO =NOO °m, aaza °o?'L'oo w ,z2 O ?'a ° ° a a o ? Ja° Z - - L -0 -u 0 •? Q O O U C p p W W ? w w o m m z?N. wry wi m ? oQwaNozo?FO ?uc??zomUN??'>o'~zwwvxir<°-mc°?umJoamz?oxiacai? -o ? ? zi d? z w ? _ U U O O (n O O p O p 00 w °w ln otr l " ? ¢N?w& w l??o a wwa?oa ?°oaao N- z Zw??a?W FwW UDC QFwWCL OZ OS WLYZNLY?w WwLL Kw oN mIF w°w°l.. ' y >- J ?? / aQ O aoo?naza ao?om3xo ms?,3???mamaaQ? w??mmo omzwaacnm?r No - • - L O O N O O j ' 0 16 p\D V) 0- 0--c-0- - 0) Q C) C) C) D D D 0 0 0 z z l L W W J J_ N IVwgwif 1. wd-,, - OIOZ 'li spweldg eePYO-^u+ Owccoq 4oC4$\?VIOJ AOa bA0\dumeoq -11 11 -IOM - 6C09CiS10\IO3W wuwv,u?ltla\?II c o sNOlsln38 31tla ON OOOV-£LZ (6L6) 131 tlNllOatlO HLaON Nb'Id r Cl) O Q j 09909lIZLSNSNtl)18tl 31lInNOLN30 KLNnO03)4VM 3111nSIH60A ` O Z ? 1af100 S31af1S ONtl 4S "H ON JNI1N dId O an O p "U a J S p 1N3WdOl3n3O NO1ltlM WVS X3ldWO OW 9-96 L-O - > O F , 2 3 g?qs J 'ON •8a" 00_09Z4 ON3aols GNV?13M 3 o m o U m a ?= JAW" VM 31lIASItN0W -J?IYWIVM 1VMVOJOiS E o ? k 'd i ? 2J3 1 o ? Y co saa€??° a z :1N3110 i03COdd 3 1LL i 00C)? \ 7?1 C t // N, ? I \! O ' Evo? w n G/ N ti_ x > _ J Q O J Q O NJ Q ? O W W ? H QQ _j _J I ?t / W LLJ m [n -J -J J Q Q J H H W cn IL a_ r- 00 O cn (n i W W 0- U) Cf) U N /? U ON D ? amw o,om moo oog F oa % O L D Q Q w? y° z w omq ,o z Fl- m a S.. ww mzi Qoars x°oo'aa N°Nw , °a? (P T 3 N J J J. i4 oaR w rc o o>xxo_ z ?viaotiz u?oo a O v z?i ow ° mi ZooZO ?° =?°w mzo °rm?? mos JxoQmv?-i-i z D p N Q Q w oo. zo m ma owoao Qo =?a wsozg¢ N?am <?or=r ?Ymwo /,. Q O N D 4) D D (n(n z Nw o? o ?a w aw .r`?°tn?x m° 3 o oi3O wo'om Iwo of<? -C T E- N W W_ a N p 3Too Q<?d w twaZ? ooaawF Of-WOa °o¢ ? 3Q m > -D w 0 - +-+ O U oo z z ea oo w??oz ° ?r o°w m3m_O° °°NFO O O N -D Dl D W W o ZN? ma m°o?zo mQ°o.°a3 Jo =OZa"x k'z o°wN°wo ozaamw 0 S p i pN 3 p p O In Ln CO 0 a ll°oo?i_ca°x°?oi?¢zw >awa°?oi? °on°Q z (/? O Q J U J J? \? w owa? rtn \.? \?,...? z o'tn ?? ° mmarc WOm zw`tai?xJ o J°=O- °cko< o°ao° oinz? % W J (DU ° J> n _ _ - ° m o waoFaw a was`-^w? ??a?a° m Z Z Cn(n \ \??\ o Wow zm w oawFFOOOOmu?zmzo? pFOZ°QZ aQf oa°wU? °ONQ°a / J LLJ In mi ° z 7Ywa "Nworzaoaax w?oo?o zm w?Ja<J°w ??prV W U) O Q Q ..< °oo ?o ?a ° ?° ° ao rz o .? _ .- LL ZWU'r0 - In K'-VI Zti?O?Y .? Z Z ° m UwW ° W 00 :3 V) o> TWz H? m ZOO?WK ZwOtnz2QOwQ aN KJF?°4l 3Q wW I-ocF-PDa Z LLJ \ za tnYZ za z ao??<w i°? ?FFi?ai p3=o°o° wo p o o.m / m D -D v- ?.?\ ? \\. zm wren ?cai az°amm ?"Ow? 3vi3w? oQ°^-?w?x??a? ??o°Nt?N ?- U ? Lf? O? Fr j3? FmW? Wm mao woo owmw? ¢ aw m z? ow xa tnzO - O I? .? D \\\? ?'' o N?ww aw F?mma°zzo ?u? - D U \ \.., ao FWN 9Q¢ w mWpo WZwwFNp o xz o"?<??awaa?o wo'x^w w< z (n (n \ m °oa o wN_ ?aY xwoo ° woF -z?w o = Q ? p p +-+.- ZZ -C -C p p +-+ Q Q ??\....... am aNa a. mwP w ?ze?w?JJ?ftama>a Eoamo Toz azz°°o? r C (n G. ?\".. ?m mw pNx? mm awmpw? °mu ao?z ww <Joaa= _?zzzo j _J cn D O ° Q_-D _ _ '?oo<oar a Z - - i U -D -p O Q z yo?wa~°?otno w>°sQo° d w JOw?o?a?wmx -'too iz w3uao k'wd? Q O O .How _tn?wooo mo o< cno wz? o_ m U) N p ° - W W zza oz? w w a m J G F v o wn w ?a°3 ao°?a ?o a?o,a saga U '6 '6 U N !n O oaw<z?o mp°o m3 °?o'`'?a?ozwo oa?pazz y ? a?z- °? Nrr-wmo o mz oY ° O zaF 3a?¢oatnp z (n O O p D D °a>w??ri owama°ww°oi?w?io?u?iraz?"c?am?wwwpw ?wo?° ao wow%-J p > ?? a w3 o w o w?? Wo omz waa viva tvo J -- i D D N N N 0 0 aaaQOOtnQZa auNCaim xo m?N ??mam aa> _ mm ?o¢ Di Dip U) 0-D--0 -0? Z 3w n 46 6 n m m°_ Q D O D D p=5 0 0 0 Z cncncn W W JJJ ?N alYw,q'w? A. wd-, - OIOZ 'tZ +oSwaltla5 6ap'Sp-nua 6wcuoq -o \-A 60N -\6ui- W- I+oN-IOM - 6C09C1St0\IOiuawuo+uu?lVN\?M U n } sNOlsln36 31va ON 0, OOOV'ELZ (6L4) 131 VNIIOaVO HLaON r p Q Mg" LZL SVSNVMaV'3llIANOLN30 ALNnOO 3MVM'3111ASIbbOW 4 13AHIS H10L 3S W CZ iHnOO S31bns ONV 6$ AMH ON Ql I(3ldWOO 1N3Wd Ol3AAO NOLIVM WVS O „_ bas ?_ o ON-l0-S6 L-O p y. 9 a J ? 00-09Z4'oN 3601S } I"VM IMF Y ova :?idd `rte d 0 W Z W ? Z cn C 7 Z m Z 0 Q O x W z Q OW W Of W ?o cn v O O 0 Q W? LL J C) LL 0 C/-) 0 ro z J LL Q z < Q / O = I Ocn - oo LXLJG W m W -1 Q .. m = Q 0 -X Q .. Z LL- W O m W f- O (n LLJ z m m LLJ W E Q O W I ? W W C:) j W I W II W Q O o o J ? z? ao Q Q = W -' U cn o W O _ 3: m k Q W J U 3 z O = Q W ? w W J Q C.? N Q O Q W W O O ? 7 I Z Z z a- I F Z 3 O cn z J ° 0 J a ~ JQ ? w ?- W moo`' LLJ o CE? a <? z Q o ° o O 00 O f J = J _ = W Q cn 0 - = Q (L O -00 2 = W O i O cn o _ U a_ O = - W D g. ?o u ? z - = o W Q W oQ w J L-' oQ WJ II W Q 0 z o W J W a W b W w I? Q O z - m W Q 'a W m W 0 w Q U) Q W O W Zcn Y Z J O O ? ? r?0 L - Q Z O D m m j O W ` n ?= z Q - ? OW -- E O Z W Z W Q Z € Cn W Z Q J I O X = wcn cn o 0O O Z w0 Q? W n, W LLJ u ?MP'f0-nua Ou¢co9 VotV$\aPlP1 AON QNO\E?^.an?J WI!VS I?o11-wM - 6CDBLKlO\lolwwuo.NU3 lra\>>t rl Flow conditions in 30 inch RCP with two tail water conditions 0.5ft TW 2.5cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth 0.50 ft Upstream Depth 0.52 ft Length 114.00 ft Number Of Steps 10 GVF Output Data Profile Description S2 Profile Headloss 0.59 ft Normal Depth Conjugate 0.00 ft Downstream Velocity 3.58 ft/s Upstream Velocity 3.41 fUs Channel Slope 0.00500 ft/ft Discharge 2.50 ft'/s Normal Depth 0.50 ft Critical Depth 0.52 ft GVF Profile Image Yc = 0.52 tt Yn=050tt 114-00 ft '•i 12 69433 L H 1 Bentley Systems, Inc. Haestad Methods SoftkbI4 #iWwMaster V8i (SELECTseries 1) [08.11.01.03) 6/15/2010 3:03:34 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 3ft TW 2.5cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth 3.00 ft Upstream Depth 2.43 ft Length 114.00 ft Number Of Steps 10 GVF Output Data Profile Description S1 Profile Headloss 0.00 ft Normal Depth Conjugate 0.00 ft Downstream Velocity 0.51 ft/s Upstream Velocity 0.51 ft/s Channel Slope 0.00500 ft/ft Discharge 2.50 ft'/s Normal Depth 0.50 ft Critical Depth 0.52 ft GVF Profile Image Yc = 0.52 ft ....... .. .... Yn-050ft 11400ft V 10 7201 L H 1 Bentley Systems, Inc. Haestad Methods Soft*kdeq&WwMaster V8i (SELECTseries 1) [08.11.01.03] 611512010 3:04:52 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 11 0.5ft TW 15cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth Upstream Depth Length Number Of Steps GVF Output Data Profile Description Profile Headloss Normal Depth Conjugate Downstream Velocity Upstream Velocity Channel Slope Discharge Normal Depth Critical Depth S2 0.50 ft 1.31 ft 114.00 ft 10 0.60 ft 0.00 ft 5.96 ft/s 5.78 ft/s 0.00500 ftlft 15.00 ft'/s 1.28 ft 1.31 ft GVF Profile Image Yc = 1 31 ft Yn=1.28 ft 114 00 It 1 694 ; 3 L H 1 Bentley Systems, Inc. Haestad Methods So6liede9diM rMaster V8i (SELECTseries 1) [08.11.01.03] 6/1512010 3:01:36 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 3ft TW 15cfs-30" RCP - Shiloh Glenn GVF Input Data Downstream Depth 3.00 ft Upstream Depth 2.58 ft Length 114.00 ft Number Of Steps 10 GVF Output Data Profile Description S1 Profile Headloss 0.15 ft Normal Depth Conjugate 0.00 ft Downstream Velocity 106 ft/s Upstream Velocity 3.06 ft/s Channel Slope 0.00500 ft/ft Discharge 15.00 ft'/s Normal Depth 1.28 ft Critical Depth 1.31 ft GVF Profile Image .. ,1n = 1 28 ft -??- 114 QO ft _ , L H 1 Bentley Systems, Inc. Haestad Methods SoMWkWe9frkwMaster V8i (SELECTseries 1) 108.11.01.031 6/15/2010 2:59:19 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Previous Correspondence and Documentation A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director Dee Freeman Secretary June 28, 2010 CERTIFIED MAIL #7009 0080 0000 9764 9928 RETURN RECEIPT REQUESTED Wal-Mart Stores East, LP Attn: Mr. Fred Lutz Sam Walton Development Complex 2001 SE 10' Street Bentonville, AR 727164050 CERTIFIED MAIL #7009 0080 0000 9764 9935 RETURN RECEIPT REOUESTED Shiloh Morrisville LLC C/o USAA Real Estate Company Attn: Mr. Phillip R. Moltz 9830 Colonnade Blvd Suite 600 San Antonio, TX 78230 Subject: DWQ Review of Responses to NOTICE OF VIOLATION (NOV-2010-WQ-0012) for DWQ Project #04-1764, Shiloh Crossing Shopping Center, Wake County and Durham County Dear Messrs. Lutz and MoItz: On March 12, 2010, the Raleigh Regional Office of the Division of Water Quality (DWQ) issued a NOTICE OF VIOLATION (NOV-2010-WQ-0012) for DWQ Project #04-1764, for the tract/project known as the Shiloh Crossing Shopping Center, on NC54 in Morrisville, in both Wake and Durham Counties North Carolina. The stream on the site is an unnamed tributary to Stirrup Iron Creek, Class C, Nutrient Sensitive Waters (NSW), in the Neuse River Basin. In response to the NOV, DWQ received several submittals from several parties. The submittals are listed in Attachment A. At the request of each party, DWQ met to discuss the responses. On May 26, 2010, DWQ met with Kimley-Horn and Associates, Inc. staff who were representing Wal-Mart Stores East, LP and on June 16, 2010, DWQ met with Soil & Environmental Consultants, PA and Priest, Craven & Associates, Inc who were representing Shiloh Morrisville LLC. In the NOV Requested Response section, DWQ requested nine specific items. Those items are listed again in Attachment B as a reference. Items #2 and #7 pertain to construction stormwater NPDES General Permit No. NCG010000 compliance and compliance with the Division of Land Resources-delegated local erosion and sedimentation control programs. Two devices remain as temporary skimmer basins on the site. Records were not provided to DWQ as required by the NPDES General Permit. Please respond to these items. In order to resolve the violations cited in the March 12, 2010 Notice of Violation, the 401 Water Quality Certification and Buffer Authorization (DWQ Project # 04-1764) will need to be implemented on site as approved or appropriately modified. It is the understanding of this office that a modification of 401 Water Quality Certification and Buffer Authorization is necessary due to current site specific constraints and exceedences of approved impacts. This certification/authorization is applicable to both parties; thereby both parties need to jointly submit this modification request together. Also, it is noted that Item One No hCarolina North Carolina Division of Water Quality Raleigh Regional office Surface Water Protection Phone (919) 791-42o0 atur?rllJ Service Customer Internet: www.ncwaterquality.org 1628 Mail Service Center Raleigh. NC 27699.1628 FAX (919 788-7159 ) 877-623-6748 An Equal Cipportunity/Afrirmative Action Emninver - rnoi Po-jm,4i4 no. Shiloh Crossing Shopping Center June 28. 2010 Page 2 #3,4, 5, 6, 8 and 9 were only conceptually addressed through the NOV responses. These items will need to be fully addressed in the 401 Certification/Buffer Authorization modification request. This modification request is expected to be received by the 401 Wetlands Permit Unit (NC DWQ, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650: http://www.saw.usace.army.mil/ WETLANDS/pcn/) within 90 days of the date of this letter (September 28, 2010). If by the aforementioned date, an appropriate modification request is not submitted, it is the intention of this office to pursue civil penalties regarding these matters. Please note these violations are subject to civil penalties as.essments of up to $25,000 per day per violation. Na" Thank you for your attention to this matter. Should you have any questions regarding these matters, contact Natalie Landry at (919) 791-4200. S cerel a?.??c, ray Danny Smith Regional Supervisor Surface Water Protection Section Attachment A Attachment B cc: Raleigh RO - Water Quality John Hennessy, NPS Assistance and Compliance Oversight Unit Ian McMillan, 401 Wetlands Permitting Unit, 1650 MSC, Raleigh, NC 27604 Cindy Karoly, Archdale Building - 9th Floor USACE Raleigh Regulatory Field Office Wake County Water Quality Div., 336 Fayetteville Street, Raleigh, NC 27602 Chris Roberts, Durham County, 120 E. Parrish St., I" Floor, Durham, NC 27701 Keith Billy, Town of Morrisville, 260 Town Hall Dr., Suite B, Morrisville, NC 27560 Austin Watts, Kimley-Horn, PO Box 33068, Raleigh, NC 27636-3068 ,Todd Si:: John, K mley-Horn; PO Box 33068, Raleigh, NC' 27636=3068 Kevin Martin, S&EC, 11010 Raven Ridge Road, Raleigh, NC 27614 Bradley Bowling, Priest, Craven & Assoc., 3803B Computer Dr., Raleigh, NC 27609 Attachment A DWQ submittals received in response to the NOV. 1. On March 19, 2010, DWQ received a letter via the USPS from CT Corporation. CT Corporation returned the documents because, "You have indicated several corporate entities represented by CT Corporation System upon which you intend to make service. We request that you either forward a complete set of documents for each entity, or indicate which entity you are serving." 2. On March 19, 2010, DWQ received a copy of a letter via USPS from Holly H. Alderman (Schell Bray Aycock Abel & Livingston PLLC) addressed to Ann H. Stuart (Troutman Sanders LLP) and Wal-Mart Stores East, LP regarding "Default under the Joint Development Agreement dated October 18, 2006 (the "JDA") between Wal-Mart Stores East LP ("Wal-Mart'") and Shiloh Morrisville, LLC ("Shiloh"). 3. On April 9, 2010, DWQ received a letter via email from Steven Mitchael (Wal-Mart) requesting an extension for responding to the NOV. The requested date was April 30, 2010. 4. On April 16, 2010, DWQ received a letter via Federal Express from Holly Alderman (Schell Bray Aycock Abel & Livingston PLLC) regarding "Response of Shiloh Morrisville, LLC ("Shiloh") to Notice of Violation 2010-WQ-0012; DWQ #04-1764 issued by the North Carolina Department of Environment and Natural Resources-Division of Water Quality ("DWQ") dated March 12, 2010 and received March 17, 2010 at 11:22 am (the "NOV"); Shiloh Crossing Shopping Center (the "Project"). 5. On April 16, 2010, DWQ received a letter via USPS from Thomas F. Craven (Priest, Craven & Associates, Inc.) regarding "Additional Concerns, NOV-2010-WQ-0012, DWQ #04-1764 - Shiloh Crossing, 401 Water Quality Certification Violations, Wake County and Durham County." 6. On May 4, 2010, DWQ received a letter from Austin L. Watts (Kimley-Hom and Associates, Inc.) regarding "Wal-Mart and Sam's Club Morrisville, NC, Store #4250-00 and 6668-04, DWQ Notice of Violation Response." 7. On June 8, 2010, DWQ received a letter via courier from Bradley Bowling (Priest, Craven & Associates, Inc.) regarding "Shiloh Crossing-Phase One-Additional Items of Concern (NOV). Attachment B Requested Response Items that were listed in the March 12, 2010, NOTICE OF VIOLATION (NOV- 2010-WQ-0012). 1. Please provide documentation (including a detailed site map/survey) depicting all jurisdictional water features (e.g. streams, wetlands and buffers) on the site. This documentation should describe and quantify the impacts to those jurisdictional features and should include plans to avoid further unauthorized stream, buffer and wetland impacts on the site. 2. Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. 3. Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. 4. Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. 5. Provide a Plan that addresses non-diffuse flow in the Neuse Riparian Buffer Zones 1 and 2 for the entire site. 6. Provide documentation that shows the final stormwater management facilities for Phase I were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. 7. Provide NPDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program. 8. Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. /1 Kimley-Horn h1h.-I? and Associates, Inc. April 30, 2010 ¦ Natalie Landry Site 300 4651 Charlotte Park Dave DWQ Raleigh Regional Office Charlotte, North Carolina 3800 Barrett Drive 28217-1911 Raleigh, NC 27609 Re: Wal*Mart and Sam's Club Morrisville, NC Store 44250-00 and 6665-04 DWQ Notice of Violation Response KIi.A Ref: 015476039, 038 Dear Ms. Landry Please find the attached response to the NOV dated March 12, 2010, that we are submitting on behalf of Wal-Mart. The response includes proposed solutions to address the items listed in the NOV as requiring a response. Please note that none of the items requiring a response are physically located on land owned by Wal- Mart. As such, Wal-Mart cannot commit to implementing the proposed solutions unilaterally. However, if the Division finds the solutions acceptable, we will continue working with the property owner to attempt to rectify the issues in a timely manner. We would like the opportunity to meet with you to review and discuss each of our responses in detail as well. Sincerely yours, KIMLEY-11ORN AND ASSOCIAIFS. INC. r Cu's'tin Watts, P.E. Cc: Todd St. John, P.E. Gayla Iioipkemeier, P.E. ¦ 7; EL 704 333 5131 FAX 704 333 3845 1. Please provide documentation (including a detailed site map/survey) depicting all jurisdictional water features (e.g. streams, wetlands and buffers) on the site. This documentation should describe and quantify the impacts to those jurisdictional features and should include plans to avoid further unauthorized stream, buffer and wetland impacts on the site. Response: Please reference the attached Overall Site Plan and Figures. The Figures show the plan to replant the impacted buffer area No further impacts are anticipated. 2. Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. Response: The Stormwater Pollution Prevention Plan (SWPPP) binder that includes all of the daily reporting has been requested from the General Contractor. 3. Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. Response: Aggradation has already been documented at the upstream culvert inlet. This is because the culvert was placed in a deep pool to bury the culvert invert the required 0.5 feet below the stream bed in that location, and, as a result, is submerged. The deep pool invert elevation appears to have been approximately 2 to 2.5_feet below the normal water surface elevation. The deep pool existed because of a downstream bed rock outcrop that begins approximately 26 feet downstream of the culvert outlet (see Figure 1). The bedrock appears to consist of brown sandstone or mudstone. The outcrop is approximately 45 feet long in the direction of the stream with an unknown width. The bed rock vertical thickness appears to be more than 5'. The width of the outcrop is beyond the width of the stream in all locations checked (b_y hand auger). Our recommendation for addressing the aggradation is to lower the stream invert by cutting a notch in the rock approximately 2.3 feet wide at the base (with straight sides). The elevation of the notch will begin at an elevation 0.5 feet above the invert of the downstream culvert outlet and will chase that elevation until it reaches in the invert of the bed rock or the end of the bed rock outcrop. The bed rock ends at a small drop approximately 2.5 feet or more above the downstream invert of the stream. Since the notch would be made into bedrock, it should not result in instability. Also, lowering the invert would remove the backwater effect and reduce aggradation. An ICPR stormwater model was used to compare the culvert configuration approved by DWQ, the as-built conditions, and culvert performance with the notch added. A summary of the results can be found in the tables below. SC-1. DWQ Approved Design - 36" RCP culvert with dual (2) 24" RCPfloodplain pipes (no taihvater); SC-2. Construction Drawing Design Condition - 30 " RCP culvert as modeled for CDs (no tailwater condition); SC-3. As-built Conditions - 30" RCP culvert with tailwater condition Upstream Water Surface Elevation (WSE) and Comparison Note: Road Surface Elevation = 350.72' 2-yr 10-yr 25-yr 50-yr 100- 100-yr 2-YR 10-yr 25-YR 50-YR Scenario delta delta delta delta YR delta WSE WSE WSE WSE 5C-1 SC-1 SC-1 SC-1 WSE SC-1 ft ft ft ft ft ft ft ft ft ft SC-1 334.38 -- 1 340.75 - 341.92 -- 1 342.83 -- 343.59 SC-2 336.62 2.24 341.90 1.15 343.48 1.56 344.48 1.65 345.25 1.66 SC-3 337.52 3.14 342.11 1.36 343.67 1.75 344.64 1.81 345.40 1.81 Peak Culvert Discharge and Comparison 2-yr 10-yr 10-yr 25-yr 25-yr 50-yr 50-yr 100-yr 100-yr 2-yr Peak Scenario delta Peak delta Peak delta Peak delta Peak delta Discharge SC-1 Discharge SC-1 Discharge SC-1 Discharge SC-1 Discharge SC-1 cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs SC-1 46.97 -- 112.31 - 127.29 146.87 154.48 - SC-2 43.70 -3.27 65.28 -47.03 70.47 -56.81 73.55 -73.32 75.85 -78.63 SC-3 42.06 -4.91 60.03 -52.28 62.08 -65.21 68.05 -78.82 70.29 -84.20 Changing the design of the culvert configuration can have an impact on the downstream peak discharge for the 1-year 24-hour, 2-year 24-hour, and 10 year 24-hour storm events. These peak discharge values were compared at the project site boundary within the ICPR model. The table below provides the peak discharge comparison for each scenario versus the pre-development conditions. Peak Discharge From Site - Pre vs. Post Comparison 100-yr 1-yr Peak 1-yr % 2-yr Peak 2-yr % 10-yr % delta Scenario Peak Peak Peak Peak Discharge decrease Discharge decrease decrease from Discharge Discharge SC-1 cfs cfs cfs cfs cfs cfs cfs cfs Pre-Dev 50.78 81.39 191.64 383.61 SC-1 45.69 -10.02% 66.08 -18.80% 195.39 1.96% 435.64 13.56% SC-2 43.67 -14.00% 61.93 -19.46 161.02 -30.62 402.99 19.38 SC-3 42.83 -15.65% 60.36 -21.03 155.57 -36.07 398.50 14.89 Based on the design provided by the geotechnical engineer, the road and retaining walls were designed for impounded conditions. See attached letter. Also included is a 2 yr, 24-hr storm event hydrograph graphically depicting the similarities of SC-1, SC-2, and SC-3. 4. Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. Response: To our knowledge, no approval was granted to impact the referenced buffer. As such, it is proposed that the buffer be re-established per Figure 2. Additionally, the bypass channel was altered as the result fi-om comments by NCDOT. The existing bypass for Level Spreader 4 does not segregate the bypass flow from the diffuse flow of the level spreader. As such, Figure 2 and Figure 3 also show a proposed configuration for a riprap sivale to separate bipas.s flow from diffuse flow. Provide a Plan that addresses non-diffuse flow in the Meuse Riparian Buffer Zones 1 and 2 for the entire site. Response: There were areas of concern (see Figure 4) that were noted upon visiting the site Areas of'Concentrated Flow and Gulleys- Gulleys were noted as a result of concentrated flow through the buffer (upstream of the culvert on the left bank). Most of these were caused by water bypassing riprap dissipater pads from up gradient level spreader bypass drain outlets. The riprap swales at two outlets need to be repaired and conveyed down to the stream to prevent further concentrated flow. Log snags consisting of core fiber logs or natural logs staked into the ground can also be added perpendicular to concentrated flow in order to diffuse the flow through the buffer. The is an additional area of concentrated flow located just upstream of the Stream Impact#1 road crossing on the right bank, against the retaining wall. To address concentrated flow in this area, it is proposed to extend a small berm to create a level spreader to diffuse the flow across the buffer. Provide documentation that shows the final stormwater management facilities for Phase 1 were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. Response: (2 Options) Option .1-The pond can be built according to the approved plans. This includes re-grading the bottom of the wetland to plan grades, adding additional topsoil as needed, and re planting. The side slopes of the wetland will also need to be re-graded to their correct slopes per the plans (3:1). Option 2- Wal-Mart submits anew wetland plan to DWQ that meets their criteria. This may include reconfiguring the bottom of the pond , providing the appropriate amounts of top soil, changing the planting plan, and possibly making adjustments to the outlet structure. This would also include providing 3:1 side slopes for the berms as well. However, this could be achieved as the original wetland was somewhat oversized based on the design criteria in place at the time. It is assumed that DWQ would allow the design to be provided based on the old criteria. An ICPR model was run to determine if the fence over the emergency spillway would impede water flow or block debris resulting in impeded water flow during a large rain event. The outcome of the model substantiated that the stage for the 100 year, 24-hour storm event is 0.63 feet above the stage of the emergency spillway. If the bottom of the fence is less than 0.63 feet above the spillway it would be possible to remove a potion of the bottom of the fence to satisfy the required depth over the spillway to convey large storm events. 7. Provide 1\PDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program. Response: The Stormwater Pollution Prevention Plan (SWPPP) binder that includes all of the daily reporting has been requested from the General Contractor. 8. Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. Response: Wal-Mart should take no exception to the owner removing this basin or converting it to a Stormwater Wetland. If a stormwater wetland were designed based on the current criteria and watershed condition (i.e. no impervious cover), the estimated surface area of such a wetland is approximately 3,500 square feet. This wetland could be established within the footprint of the existing basin. The outlet of the basin could also be modified to meet the drawdown requirement. Figure 5depicts the approximate footprint of a 3,500 square foot wetland. 9. Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. Response: Upon site review, level spreaders 1, 2, and 4 appear to be constructed to at least the designed lengths and appear to be./unctioning properly. Level spreader 3 appears to have been constructed 3 feet shorter than the original design. This level spreader can be lengthened as needed; however it appears to be functioning. The issues noted in items 4 and 5 above are related to the level spreader bypass conveyances and proposed means of correcting those issues are described above as well. Design Length (ft) As-built Length* Level Spreader 1 43 43'-4" Level Spreader 2 77 77'-1" Level Spreader 3 59 56'-0" Level Spreader 4 42 420-0" *As measured using a measuring tape in the field. As mentioned above, other than the issues described in responses 4 and 5 above, the level spreaders appear to be functioning adequately. Implementing the recommendations described above should address the immediate issues. In regards to long-term maintenance items, following the existing Operation and Maintenance Agreement should be adequate to identify and address any future issues. FIGURES Prepared h) Josh Allen Con 0 20 40 \- Feet Proposed \ \•? .?1 ?.. `? ,\ Buffer Re-Vegetation Alf f• i IVA l r !!! Proposed Riprap Swale . r i ILI / voo °._ Legend Pl ti Li t an ng s ...- J" 2" Caliper Trees 2 " Caliper Trees 9 -- Willow Oak (Quercus Phellos) 9 -- Water Oak (Quercus Nigra) Proposed Riprap Swale ,?. - ,may Title Buffer Re-planting Plan Prcpar:dicr . Project Shiloh Crossing NOV Response Wake County, North Carolina Date Project Number Figure 4 16 10 015476039 2 Prepared by 1o.h Allen Y G u s c c` 2 5 f 5 o- 3 v c c Prepared by Josh 411;n rl cn'? _k S&ME January 29, 2010 Kimley-Horn and Associates, Inc. 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 Attention: Mr. Austin Watts. P.E. Reference: Retaining Wall Design Calculations Wal-Mart #4250 and Sam's Club #6668 Morrisville, North Carolina S&ME Project No. 1053-06-205C Dear Mr. Watts: As requested, S&ME, Inc. has performed retaining wall design services for the above referenced project. This addresses questions about the design criteria used for retaining walls designated Shiloh-4 and Shiloh-5, specifically the depth of potentially impounded water. The cast-in-place and mechanically stabilized earth (MSE) sections of the wall are designed to be fully submerged. The walls are backfilled with free draining material as required by the note on Sheet RW-12 that states "The backfill for CIP wall and reinforced fill to MSE wall shall be NCDOT No. 57 Stone." In addition, attached are sample external stability calculations for each CIP wall showing that the designs were completed assuming the high water elevation equaled the top of the walls. We appreciate the opportunity to work with Kimley-Hom and Associates providing the geotechnical consultation for this project. Should you have any questions regarding the information in this report, please do not hesitate to contact us. Sincerely, \\,C Atrr????? \ . • • R 01 S&ME Inc. .` 4 • ' SS 29147 Kristen H. Hill, P1. Project Engineer ,f; N.C. Registration W6:1h0,4 ??t?i C 1 Duane D. Bents, P.E. Geotechnical Department Manager S&ME, INC. / 9751 Southern Pine Boulevard / Charlotte, NC 28273-5560 / p 704.523.4726 i 704.525.3953 / www.smeinc.com Aamk TS&D ME 10H NAME Shiloh Crossing - Morrisville sunjEcT Shiloh-4 16 ft section - External Stabili OBJECTIVE: 11RO.IECT No. 1051-06-2050 suELo, No. 1 / 15 DATE September 11, 2007 Co11tPUTEO 01' KUM C6ECKED BY Evaluate the external stability of the 16 ft exposed height section of Shiloh-4 assuming the retained soil is 1) washed stone and 2) drainage stone, 3) HW elev at top of exposed wall. SUMMARY: SUMMARY Overturning Slid ing Bearing Capacity Minimum Calculated Minimum Calculated Minimum Calculated Safety Safety Safety Safety Safety Safety Stability Factor Factor Factor Factor Factor Factor 2 5.8 1.5 1.5 3 5.8 OK DEFINITION OF VARIABLES: ao = angle to outer friction plane a,,, = angle from heel of retaining wall to the top of the stem 0 = angle of slope above retaining wall y = unit weight yb = buoyant unit weight y„, = unit weight of water S = angle of wall friction (1) = soil friction angle A = width of stem B = base length of wall c = cohesion of bearing soil r., adhcsion_factor.. C = length of heel D = width of heel/toe Dr= depth of bottom of footing e = eccentricity E = height of key F = length of toe Fa = factor of safety against bearing capacity failure Fo = factor of safety against overturning FR = sum of forces resisting sliding Fs = factor of safety against sliding G = horizontal component of slope of soil behind fill H = height of key H, = depth to water table Ih = depth from water table to bottom of stem I = width of key 511J5dPROJECT5?1f4t7,175,.4)74417 Gum- Coe:lyp-MAml OimiGiw'sicrzU L^id:zul!s'Pd:rfp_I5pII1tcjcE'1-41,PrP.';Mj SpU-" I lczd-li Emmul 5:n5:E )d ARA 7;S&ME )II NA ,E Shiloh Crossing- Morrisville ;uD.,rcT Shiloh-4 16 ft section - External Stability Kp = active earth pressure coefficient Kp = passive earth pressure coefficient Mo = sum of moments overtunling MR = sum of moments resisting overturning N,, Nq, NY =bearing capacity factors PA = active earth pressure Pi, = horizontal component of active earth pressure Pp = passive earth pressure P, = vertical component of active earth pressure q = surcharge qi, = pressure at heel of footing qt = pressure at toe of footing q„ = ultimate bearing capacity R = sum of vertical forces KNOWN VARIABLES: PHO.IECT NO. 1051-06-2050 SuECrno. 2 / 15 DATE September 11, 2007 COMPL7ED Ol' KUlH C„ECKED DI P = tan-'(1/3) = 18° [Ref. 31 ySDjI = NA [Ref. I] ystone = 130 pcf [Ref. 1 ] y,?.?1Ct = 62.4 pcf 6 = 17.3 degrees [assumed] ?pso;i = NA [Ref. I] = 36° [Ref. 1 ] C = 0 psf [assumed] Fa htiN = 3.0 [Ref. 2, Section 19.5] Fo,;,t[N°_2.0 [Ref, 2, Section 19.5] Fr, = surf, of iotces resisting sliding Fs,%,,,N= 1.5 [Ref. 2, Section 19.5] q =250 psf [assumed] 5?.l35:: ?RO!ECTS_;MC11i56 ii'?:;7 G- Cx 1,41c a Psi Csn:G:c?I:;ic:a Nad.c?IlrY:i:pupa 51a11u:> E.curna'•3n::dp:l Spill-, H-JJ-1I E,lm! S:?SL'ia dc-. PROJECT NO. 1051-06-205C 3/15 *S&ME SEICET NO. BATE September 11, 2007 1OB NAME Shiloh Crossing -Morrisville com i r£Q uv KHH SUBJECT Shiloh-4 16 ft section - External Stability C11LCK£B BY CALCULATIONS: 1. Estimate headwall geometry for stability analysis G -0- TABLE 1: HEADWALL DIMENSIONS A ft B ft C ft D ft E ft F ft G ft H ft I ft 2.5 18.5 14 2.5 5.5 2 2.5 19.5 2.5 2. Check applicability of Rankine's Equation Rankine's equation applies if the outer failure plane does not intersect the retaining wall. _ 90-0 e-?3 act ? sin c = sin,8 sin o [Ref. 2, Eq. 19.1 b] [Ref. 2, Eq. 192] S?.11)ir.U'HO:ECT512U0A1]Y??n7:+f7 G.,a:? ; Ccusq??PC;?m+ Pna Q:rr.C al:vu!iwuU Iu3+vp;},??,+npi SpVih.:? I:ztcr,»i:Fn::up?l S;mHix.+ Nc:J++'ia L.1 nu'. Siih;lw? J::c AMIL ME PROJECT NQ. 1051-06-205C SIIEM'No. 4/ 15 pATY September 11, 2007 )0NAAlr Shiloh Crossing - Morrisville co+rnn i)in' 1:1111 SUBJGCr Shiloh-4 16 ft section - External Stability CHECKED BY a,,, = tan-' C H TABLE 2: RANKI NE'S EQUATION APPLICABILITY P £ ao a, Rankine Equation Applicability (degrees) (degrees) (degrees) (degrees) 36.0 18.00 31.72 20.14 35.7 Rankine Equation is Applicable 3. Calculate Rankine active earth pressure for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone P , , = qHK., + 7 7 i f 2 K + y H , H, Ka + I H; ( b K , + y, } [Ref. 2, Eq. 11.19] K cos,8- Vcos2 Q - cos'- 0 cos ,8 - (for soil retained by wall) cos'8 + cos' p _COS' 0 P" H [Ref. 2. Eq. 11.24] K, _ I+ sin 0 (for soil in front of toe) 1- sin 0 P1, = P. cos,8 P,, = P,, sin fl 1 , [Ref. 2, Eq. 11.15a] [Ref. 2, Section 19.5] [Ref. 2, Section 19.5] TABLE 3: RANK INE ACTIVE EARTH PRESSURE n?t?teri2l LOtl itiorl ? feet H'" feet n .. (psf) its Kp P :. Iblft P h lb/ft P.' Iblft Soil Saturated 0 19.5 250 0.296 3.852 17105 16267 5286 Soil Submerged 0 19.5 250 0.296 3.852 17105 16267 5286 Stone Saturated 0 19.5 250 0.296 3.852 17105 16267 5286 Stone Submerged 0 19.5 250 0.296 3.852 17105 16267 5286 The horizontal component of active earth pressure is the driving force and adds to instability. The largest horizontal force is the controlling driving force. In this case, the controlling condition is submerged soil. TABLE 4: CONTROLLING DRIVING FORCE Material Condition Ph Ib/ft Controlling Ph Iblft Soil Saturated 16267 Soil Submerged 16267 16267 Stone Saturated 16267 Stone Submerged 16267 S:?l}?G.^RO:c-CTS?:?:7U35a?J;1eO Gssi :: Cciiq•P ::ca Fuk ?:m:,Cil:aloli:au•H::.•..iirPnuapi Spia?. a, L"mul•-p"..yJ srilw- li ''J aii [ccnul St_Li;i:y.duc S&ME ,on N.AIE Shiloh Crossing- Morrisville suuiEcr Shiloh-4 16 ft section - External Stabil iia.?EC c no. 1051-06-205C snEETNo. 5115 DATE September 11, 2007 COMPUTED BY KHH CHECKED BY 4. Calculate resisting forces and moments acting on the retaining wall about point O for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone, ignore the effects of the key TABLE 5: SATURATED FORCES AND MOMEN TS - SOIL Section Area ftz Y (pcf) Weight (Ib/ft) Lever Arm (ft) Moment (ft-lb/ft) Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 130 30940 11.5 355810 Retained Soil sloe 39.20 130 5096 13.83 70495 Water - - - - - Vertical Rankine Pressure 5286 18.5 97784 R = 54634 M,= 608979 TABLE 6: SUBMERGED FORCES AND MOMENTS - SOIL Section Area ftz 7 (pcf) Weight (Ib/ft) Lever Arm (ft) Moment (ft-Ib/ft) Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 67.6 16089 11.5 185021 Retained Soil (slope) 39.20 130 5096 13.83 70495 Water 238 62.4 14851 11.5 170789 Vertical Rankine Pressure 5286 18.5 97784 R = 54634 Mr= 608979 TABLE 7: SATURATED FORCES AND MOMENTS - STONE Section Area r`zI y r.. Weight 0,011. Lever Arm Moment Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 130 30940 11.5 355810 Retained Soil sloe 39.20 130 5096 13.83 70495 Water - - - - - Vertical Rankine Pressure 5286 18.5 97784 R = 54634 Mr= 608979 S:U }SG,^(IOJECT51?a,J?ll SG??7an:J Gas:m: C?i::pP?;;m: !`yC Usr.P.Cnlc?:ria:?.FicoJsalls`Yriucip?l S;:illa?y Ec:cmaSV^rucipol 5piltu?? Hcads?a E.i:r..?t Sui?iia?doc At. AML AMNEIR& ;WS&ME DATE September 11, 2007 ,8,,,,?E Shiloh Crossing - Morrisville COMPLFTED uy KHH SliU1FC1 Shiloh-4 16 ft section - External Stability CUECKEU UY TABLE 8: SU BMERGED FORCES AND MOMENTS - STONE Section Area ftZ Y (pcf) Weight (lb/ft) Lever Arm (ft) Moment (ft-lblft) Stem 42.5 150 6375 3.25 20719 Footing 46.25 150 6938 9.25 64172 Retained Soil 238 67.6 16089 11.5 185021 Retained Soil sloe 39.20 130 5096 13.83 70495 Water 238 62.4 14851 11.5 170789 Vertical Rankine Pressure 5286 18.5 97784 R = 54634 Me= 608979 The lowest resisting force and moment control. In this case, the controlling condition is submerged stone. TABLE 9: CONTRO LLING RESISTING FORCE I MOM ENT Material Condition R (lb/ft) MR (lb-ftift Rm+n lb/ft MR,min (lb-ft/ft Soil Saturated 54634 608979 Soil Submerged 54634 608979 54634 608979 Stone Saturated 54634 608979 Stone Submerged 54634 608979 5. Check factor of safety against overturning assuming controlling conditions F0 - 1I min Ho Alto = Pi, 3 [Ref. 2, Eq. 19.7a] [Ref. 2, Eq. 19.7b] _TA-nl r -yen. //++r?es.?esrnTe_enAeener _. MR,mIn Ma Fo Fo mvN Stability (lb-ft/ (lb-ftift , 608979 105738 5.8 2.0 OK 6. Check factor of safety against sliding assuming controlling conditions Fs = I-ie [Ref. 2, Eq. 19.6] Pi, 171, = c,, B + R tan S + PP [Ref. 2, Eq. 19.5] Assume adhesion is zero, passive earth pressure acts on the key, and the angle of wall friction is 20 degrees FR = Run tan S + PP PP 7E2hP 1,R011.:CT No. 1051-06-205C SHELTno. 6/ 15 [Ref. 2, Eq. 11.15] 5.U.15('JBUIECTS'-NAIA14:03:+n Mi:c:. C-:,-N;=, P-W:ncC.11= asJI.IJ-1hIl-ra;.pA5P.J.,ryEm-IJ'naoPA5,,,!R-y I!Ct-aII E%I-'! 51':JIIIt I.J]C *,S&ME lou NAME Shiloh Crossing - Morrisville suumcr Shiloh-4 16 ft section - External Stabili r1tojEc -,o. 1051-06-205C sHEET,o. 71 15 DATE September 11, 2007 Co.NiPUTED BY KHH CHECKED BY TABLE 11: SLIDING Rmin Pp FR Ph Fs Fs MIN Stability Ib/ft lb/ft Ib/ft Ib/ft , 54634 7574 24590 16267 1.5 1.5 OK 7. Check bearing capacity factor of safety assuming controlling conditions Fn = 91, [Ref. 2, Section 19.5] qt q„ = cN, + yD f N,, + 1-? 7BNj. [Ref. 2, Eq. 12.6 & Table 12.11 6e] q,=? 1+ q1, = 1- B B B Al - Al _ e R o 2 R Find qD using bearing capacity factors in Reference 2, Table 12.1. TABLE 12: ULTIMATE BEARING CAPACITY NG Nq NY q u sf 25.1 12.7 9.7 17443 Find controlling applied stress TABLE 13: CONTROLLING APPLIED STRESS Rmax Ib/ft a (ft) qt sf qn sf Controlling Stress (psf) 54634 0.04 2990 2916 2990 Check factor of safety for bearing capacity TABLE 14: BEARING CAPACITY qu Controlling Stress FB MIN FB Stability sf (psf) . 17443 2990 5.8 3 OK CONCLUSIONS: The retaining wall section should be constricted to the dimensions outlined in Table 1. [Ref. 2, Eq. 19.8b] [Ref. 2, Eq. 19.8c] [Ref. 2, Eq. 19.8a] 5 il;5t'3R0!£Ct5'Cl,?iillJ;ba;lii' G.,!- C.muy Punzu Pik Oaa1C.d u:r:msWc:d:vA Tnanp! Spill"ly E.:aralNnn::pn 5"; ;1",) li,A-!I Cvl-I suhwfy !_c rno.lECf• no. 1051-06-205C - sjiErr No. 8/ 15 DATE. September 11, 2007 )II NAME Shilob Crossing - Morrisville COMPUTEDW KHFI ;uu,ECr Shiloh-4 16 ft section - External Stability CHECKED Dti REFERENCES: I. "Final Subsurface Exploration Report - Proposed Wal-Mart Supercenter #4250-00 and Sam's Club Store 46668-04," December 20, 2006, SMVfE, Inc. 2. "Geotechnical Engineering: Principles and Practices of Soil Mechanics and Foundation Engineering." V.N.S. Murthy. 2003. sr: 1< rnoi?c s1;n;T,us:,a:7a. ; e,?::: c ., :, .r,,_: rv e o_ x:::?i_r ::,,a.? ,,,u?r: . ;.a s;:di,,: c •ss: r:.?:;: i Spl :.,,• HL'c-;A suLdv, dac *-S&ME rnojec. o. 1051-06-205C SuLLTNO, 1 / 15 DATE September 11, 2007 JOUNAME Shiloh Crossing - Morrisville conmuTLOav KHH sum:cr Shiloh-5 14.5 ft section - External Stability CHECKED ur OBJECTIVE: Evaluate the external stability of the 14.5 ft exposed height section of Shiloh-5 assuming the retained soil is 1) washed stone and 2) drainage stone, 3) HW elev at top of exposed wall. SUMMARY: SUMMARY Overturning Slid ing Bearing Capacity Minimum Safety Factor Calculated Safety Factor Minimum Safety Factor Calculated Safety Factor Minimum Safety Factor Calculated Safety Factor Stability 2 4.5 1.5 1.5 3 4.9 OK DEFINITION OF VARIABLES: ao = angle to outer friction plane a,,. = angle from heel of retaining wall to the top of the stem P = angle of slope above retaining wall y = unit weight Yb = buoyant unit weight r = unit weight of water S = angle of wall friction q) = soil friction angle A = width of stem B = base length of wall c = cohesion of bearing soil Cu = adhesion factor C = length of heel D = width of heel/toe Dj- depth of bottom of footing e = eccentricity E = height of key F = length of toe Fu = factor of safety against bearing capacity failure Fo = factor of safety against overt u-ning FR = sum of forces resisting sliding Fs = factor of safety against sliding G = horizontal component of slope of soil behind fill H = height of key H, = depth to water table H, = depth from water table to bottom of stem . ............................ I = width of key Sit]Si:,PRO;ECTS'.uU?l ?Se•utaa±: Gastua C..^,av -Pcnaa NIL D;m:CSI:ulcucacd{cy??,allsU'crc:p?l 5i ith", Cslr.?ral'°rina, ?l 5mllow Ilc.cl.. da G.!cmJ154L'! rt+ J:. S&ME 011 NAME Shiloh Crossing - Morrisville suuaECr Shiloh-5 14.5 ft section - External Stabili KA = active earth pressure coefficient Kp = passive earth pressure coefficient Mo = sum of moments overturning MR = sum of moments resisting overturning Ne, Nq, N,. = bearing capacity factors Pa = active earth pressure Pi, = horizontal component of active earth pressure Pp = passive earth pressure P, = vertical component of active earth pressure q = surcharge qi, = pressure at heel of footing qt = pressure at toe of footing q,, = ultimate bearing capacity R = sum of vertical forces IC'OWN VARIABLES: P = tan 1(1/3) = 18° Ysoil = NA Ystone = 130 pcf Ywater = 62.1 pef b = 17.3 degrees soil = NA )stane = 3 0 c=0psf Fn,NlfN = 3.0 Fo.rvirN 2.0 Fji = sum of forces resisting sliding Fs.Nt1N = 1.5 q =250 psf Iruo.JECr o. 1051-06-205C SHEETzo. 2/ 15 Dare September 11, 2007 COMPUTED uY K1*1 CHECKED nY [Ref. 3] [Ref. 1 ] [Ref. 1 ] [assumed] [Ref. 1 ] [Ref. 1 ] [assumed] [Ref. 2, Section 19.5] [Ref 2, Section _19.5] [Ref. 2, Section 19.5] [assumed] S:',1 }56,PNOlECTS»ix)iill'Salan?7 G??a: Co:mt,I'oa:a Prl D:ndCi:uhacrsdtc?d:? Is!'rc?:ipJ Spii:u:! Ex:_ncl'Pnn:ipa S;.ili,.:, H:.a.?i i [?:mui Suhif::7.Ja: PROJEC Y NC). 1051-06-205C SHEET No. 3 / 15 DATE September H, 2007 CO,ll'UTED HY KHH CHECKED BY CALCULATIONS: 1. Estimate headwall geometry for stability analysis c 0- 2. TABLE 1: HEADWALL DIMENSIONS A ft B ft C ft D ft E ft F ft G ft H ft I ft 2.5 14.5 10 2 5 2 2.5 17.5 2.5 Check applicability of Rankine's Equation Rankine's equation applies if the outer failure plane does not intersect the retaining wall. E-/3 U()=90-0 1 [Ref. 2, Eq. 19.1 b] sin c = sin P [Ref. 2, Eq. 19.2] sin ¢ 5 1)'S.PROJECTSCia4v L'!a??r i1 G=a . Cauny •pc,:cu p»i. Co!n:CalwlauxuVl;?do?!s?Prir.ap.1 Sp,!I-y Evsm:IU'ric:ipd sp fl-! H:A-11 cc ?ts&ME Shiloh Crossing - Morrisville s?juJECJ Shiloh-5 14.5 ft section - External Stability a,,, = tan -' ruDJECr so. 1051-06-205C SJIEETtio. 4/ 15 DATE September 11, 2007 COMPUTED BY ICHH CJIECKED BY TABLE 2: RANKI NE'S EQUATION A PPLICABILITY 0 R E a° a,H Rankine Equation Applicability (degrees) (degrees) (degrees) (degrees) 40.0 18.00 28.73 19.63 29.7 Rankine Equation is Applicable 3. Calculate Rankine active earth pressure for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone P. = gHKA + ? YH12 K,j + Ylji H, K:, + ? H2 `Yh K.4 + Y,j [Ref. 2, Eq. 11.19] cos - GOS 2,8 COS? - K.4 = cos'6 7 (for soil retained by wall) cos /3 + cos- f3 - cos- 0 h = 1 + sin (for soil in front of toe) ,P 1-sino P,, = P„ cos,6 P,, = P,, sin,Q 1 , P..." = Ywarer 1-12 [Ref. 2, Eq. 11241 [Ref. 2, Eq. 11.15a] [Ref. 2, Section 19.5] [Ref. 2, Section 19.5] TABLE 3: RANK INE AC TIVE EARTH PRESSURE MZLGr'ial Condition feet feet (psf) lip K? Iblft Iblft Iblft Soil Saturated 0 17.5 250 0.243 4.599 13137 12494 4060 Soil Submerged 0 17.5 250 0.243 4.599 13137 12494 4060 Stone Saturated 0 17.5 250 0.243 4.599 13137 12494 4060 Stone Submerged 0 17.5 250 0.243 4.599 13137 12494 4060 The horizontal component of active earth pressure is the driving force and adds to instability. The largest horizontal force is the controlling driving force. In this case, the controlling condition is submerged soil. TABLE 4: CONTROLLING DRIVING FORCE Material Condition Ph lb/ft Controlling Ph Iblft Soil Saturated 12494 Soil Submerged 12494 12494 .Stone Saturated .12494 Stone Submerged 12494 S.11 W.,PIt0JECTS'u1I',%! :I7.tkA G."=1 C-:qPlc DIMT.I.,IA,ps!?e:daa Ihmvp:l 51411oa EelmeP.Pnaapil Sp?lla„ Ifc Jj% a:I E,1-1 S:ab!;1 g del Pliorl cI no. 1051-06-205C *S&ME sllr•.EC-vo. 8 / 15 DATE September 11, 2007 OH NAME Shiloh Crossing - Morrisville CUAIPUTED By KHH SUBJECT Shiloh-5 14.5 ft section -External Stability CHECKED 01' REFERENCES: 1. "Final Subsurface Exploration Report - Proposed Wal-Mart Supercenter #4250-00 and Sam's Club Store #6668-04," December 20, 2006, S&ME, Inc. 2. "Geotechnical Engineering: Principles and Practices of Soil Mechanics and Foundation Engineering." V.N.S. Murthy. 2003. 5 ?.173GL^ftOiECTS2tnia 13fG?i);rtq Gmea Ceu::c?Pts:en Pik Ouen?.G!cu!Nicss`HadnaflssPriuc:;•oI SPillray Eaem?iV'nnesp?t Spillsr?ylie?daill Ecrnnl SUhili;y dx PROJECT NO. 1051-06-205C ITIS&ME sI1EET V0. 7 i DATA September H, , 2007 JOB NA)IE Shiloh Crossing - Morrisville COMPUTED By KHH SUBJECT Shiloll-5 14.5 ft section - External Stability CIIECFEO BY TABLE 11: SLIDING Rmin Pp FR Ph Ib/ft Ib/ft Ib/ft (lb/ft Fs Fs,MIN Stability 36972 7473 18989 12494 1.5 1.5 OK 7. Clieck bearing capacity factor of safety assuming controlling conditions Ft, = q" [Ref. 2, Section 19.5] qr (fir -cATc+rD,Nl+IyBN? 91=8 R[1+6e] qh R 1- ? 6e] B Ad R - 1111 0 2 R Find qB using bearing capacity factors in Reference 2, Table 12.1. [Ref. 2, Eq. 12.6 & Table 12.1 ] [Ref. 2, Eq. 19.8b] [Ref. 2, Eq. 19.8c] [Ref. 2, Eq. 19.8a] TABLE 12: ULTIMATE BEARING CAPACITY fV` Ny N y q u sf 25.1 12.7 9.7 14095 Find controlling applied stress TABLE 13: CONTROLLING APPLIED STRESS Rmax Iblft a (ft) qI sf qh sf Controlling Stress (Psf) 36972 0.30 2869 2231 2869 Check factor of safety for bearing capacity TABLE 14: BEARING CAPACITY q„ Controlling Stress Fe FE MIN Stability sf (Psf) , 14095 2869 4.9 3 OK CONCLUSIONS: The retaining wall section should be constructed to the dimensions outlined in Table 1. S'IS!.!PFOJ?CTSIva7V L't,U)tA7OuxcC-,".P:It cn Pr1 Caia•C;I:, IJmnidIt;-JIV.'m, .:;::1 Sr.I".Jy'Lu:ru: Y:criP S;.:E",, Hrdncll k??m. Yo!,.W,.J., 1ri.wP&ME on NAME Shiloh Crossing - Morrisville SUIIIECr Shiloh-5 14.5 ft section -External Stabili PROJECT' NO. 105 1 -06-2050 sneer No. 6/ 15 DATE September 11, 2007 COMPUTED BY KHH CHECKED 01' TABLE 8: SU BMERGED FORCES AND MOMENTS - STONE Section Area ftZ Y (pcf) Weight (lb/ft) Lever Arm (ft) Moment (ft-lb/ft) Stem 38.75 150 5813 3.25 18891 Footin 29 150 4350 7.25 31538 Retained Soil 155 67.6 10478 9.5 99541 Retained Soil sloe 20.00 130 2600 11.17 29033 Water 155 62.4 9672 9.5 91884 Vertical Rankine Pressure 4060 14.5 58865 R = 36972 Mr= 329751 The lowest resisting force and moment control. In this case, the controlling condition is submerged stone. TABLE 9: CONTRO LLING RESISTING FORCE / MOM ENT Material Condition R (Ib/ft) MR lb-ft/ft RmIn Ib/ft MR,min Ib-ft/ft Soil Saturated 36972 329751 Soil Submerged 36972 329751 36972 329751 Stone Saturated 36972 329751 Stone Submer ed 36972 329751 5. Check factor of safety against overturning assuming controlling conditions _ MR,min Fo R1Io 111 a = P1, I [Ref. 2, Eq. 19.7a] [Ref. 2, Eq. 19.7b] .._.. .. "'?°;';, t ?; e-._.r..n, Co -.ner-rva.r e- L ...e ee?nete.era. .. _ ._.. + _?. ..r. ...... ..:. .. iP't -J L ?I.?t3. 4./LV?\-\%-?Y"I:t 0??./:\I et19V ? MR min MO_ . , Fo Fo MIN Stability (lb-ft/ft (lb-ft/ft , 329751 72883 4.5 2.0 OK 6. Cheelc factor of safety against sliding assuming controlling conditions Fs = Frc [Ref. 2, Eq. 19.61 P11 F„ =c.B+RtanS+P, [Ref. 2, Eq. 19.51 Assume adhesion is zero, passive earth pressure acts on the key, and the angle of wall friction is 20 degrees Fn = Rmin tan S + Pr, Pn=lyE'Ky [Ref. 2, Eq. 11.15] 51175n1R0,EC i Sl,idl;\i144-074417 G.vm Coro, Pes:cr. Puk V,,:6Ca].0.icas'd Iead" Alls Pral.pel spd:-y E,Irn?aP.Pn:vipJ S,^.!1J-y Hnd-!1 Emm-I SuSili:., d.c lts&ME IaD N.AmE Shiloh Crossing - Morrisville sun.lEcT Shiloh-5 14.5 R section - External Stabil PnOJECI'50. 1051-06-2050 SIIECI tip. / 15 DATE September 11, 2007 COMPUTED nY KHH CHECKED BY 4. Calculate resisting forces and moments acting on the retaining wall about point O for saturated and submerged conditions for 1) embankment fill material and 2) drainage stone, ignore the effects of the key TABLE 5: SATURATED FORCES AND MOMEN TS - SOIL Section Area ftZ Y (pcf) Weight (Ib/ft) Lever Arm (ft) Moment (ft-lb/ft) Stem 38.75 150 5813 3.25 18891 Footing 29 150 4350 7.25 31538 Retained Soil 155 130 20150 9.5 191425 Retained Soil sloe 20.00 130 2600 11.17 29033 Water - - - - - Vertical Rankine Pressure 4060 14.5 58865 R = 36972 M,= 329751 TABLE 6: SUBMERGED FORCES AND MOMENTS - SOIL Section Area ftz Y (pcf) Weight (Iblft) Lever Arm (ft) Moment (ft-lb/ft) Stem 38.75 150 5813 3.25 18891 Footing 29 150 4350 7.25 31538 Retained Soil 155 67.6 10478 9.5 99541 Retained Soil sloe 20.00 130 2600 11.17 29033 Water 155 62.4 9672 9.5 91884 Vertical Rankine Pressure 4060 14.5 58865 R= 36972 Mr= 329751 TABLE 7: SATURATED FORCES AND MOMENTS - STONE :Section Area ,;? Y (PcTI Weight Lever Arm Moment Stem` _ 38.75 _ 150 5813 3.25 18891 Footing 29 150 4350 7.25 31538 Retained Soil 155 130 20150 9.5 191425 Retained Soil (slope) 20.00 130 2600 11.17 29033 Water - - - - - Vertical Rankine Pressure 4060 14.5 58865 R = 36972 Mr= 329751 5 AI}SPi'801ECTSui=NU7<.,??'?qr7 Gam., C=.4-Nvo. P,', Day;,C:ICC:ai;?sV!e .h??!1:1'n:mip:! 5P'II: ? E'1am!IPnacp I Spili:n! H:cd:':II Ea:rul a,- EU?csa ,, 3111ASINHOW-1HtlWMM _ 121tlW1tlM 'i 30;5 U) ?Sz I? I i i i Is?2 V iP U p ---------- ------- i; ------------ v ?Q? odo - • c? a d '?,6 I?;I 01 f I e o?oo?? ono / _-- ! 0000 ? o 00 ,?- ? , ---- ---- --- o t // CZ?_CD:o 0 0. :o , =?1 ---------------------------------- .?.... _. z ., o.a a.... ....s-?.-..+.an....r?....a.R-?w.e.+.??ns .....-.. ...s_.c-c... t Q fC L tka O L 3 O z O L O t N L^ GJ N O 'OE 9'6z Z 6Z 8 8Z £'8Z 6'LZ S LZ I'LZ L 9e £'9Z 8 SZ b SZ O SZ 9'bZ Z'7Z 8H £'£Z 6 ZZ S'ZZ T ZZ CTZ £ TZ 8 OZ b OZ O OZ 9'6T Z 61 8,81 £' 8I 6'LI S'LT T LT t 91 £'9T S 'ST V ST O'ST 9171 Z'bT 8'£T £'£T 67T S'ZT T'ZT L'TT £ IT 8 OT b OT OOT 96 Z'6 8'8 £8 6'L SL IL C9 E'9 85 7S 0'S 97 Z"7 8£ £'£ 6Z S* Z IZ L'I £'T 80 b'0 00 v 3 L (sP) SLO-ISOd apoN le a8jey:)s10 mol)ln0 3 u s c 0 V i v 3 0 c u ? u o = c a E N F- 0 0 L c u I tU vl Q M N ?--? ? KNEW North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue colleen H. Sullins Dee Freeman Governor Director Secretary March 12, 2010 CERTIFIED MAIL #7009 0080 0000 9764 8075 RETURN RECEIPT REOUESTED Wal-Mart Stores East, LP Attn: Mr. Fred Lutz Sam Walton Development Complex 2001 SE 10`6 Street Bentonville, AR 72716-4050 CERTIFIED MAIL #7009 0080 0000 9764 8082 RETURN RECEIPT REQUESTED Shiloh Morrisville LLC c/o USAA Real Estate Company Attn: Mr. Phillip R. Moltz 9830 Colonnade Blvd Suite 600 San Antonio, TX 78230 Subject: NOTICE OF VIOLATION NOV-2010-WQ-0012 DWQ #04-1764 Shiloh Crossing Shopping Center 401 Water Quality Certification Violations 35.8656° N 78.8445°W Wake County and Durham County Dear Messrs. Lutz and Moltz: On February 26 and March 1, 2010, Natalie Landry from the Raleigh Regional Office of the Division of Water Quality (DWQ) conducted a site inspection for the tract/project known as the Shiloh Crossing Shopping Center, on NC54 in Morrisville, in both Wake and Durham Counties North Carolina. The stream on the site is an unnamed tributary to Stirrup Iron Creek, Class C, Nutrient Sensitive Waters (NSW), in the Neuse River Basin. Accordingly, the following observations were noted during the DWQ file review and site inspection. Mr. Todd St. John of Kimley-Horn and Associates, Inc. submitted a Pre-Construction Notification (PCN) on or about May 14, 2007 on behalf of the owner/applicant, MBV Investors, LLC. The impacts were requested under U.S. Army Corps of Engineers Nationwide Permit 29 and the corresponding General Water Quality Certification. DWQ issued an approval for the impacts on July 6, 2007, DWQ Project# 04- 1764, Ver. 2. Mr. Craig M. Duerr of Kimley-Horn and Associates, Inc. submitted a Pre-Construction Notification (PCN) on or about November 21, 2007 on behalf of the owner/applicant, MBV Investors, LLC requesting a modification of the existing 401 Water Quality Certification (DWQ Project #04-1764, Ver. 2). The impacts were requested under U.S. Army Corps of Engineers Nationwide Permit 39 and the corresponding General Water Quality Certification. DWQ issued an approval for the impacts on December 17, 2007, DWQ Project# 04-1764, Ver. 3. The approved impacts at the Shiloh Crossing Shopping Center site include the placement of fill within or otherwise impact 0.479 acres of 404/wetland and 274 linear feet of perennial stream, 18,533 square feet of Zone 1 protected Neuse River basin riparian buffers, and 19,912 square feet of Zone 2 protected Neuse River basin riparian buffer to construct a commercial development. No hCarolina )Vaturally North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791 4200 Customer Service Internet. www ncwaterquality org 1628 Mail Service Center Raleigh. NC 27699-1628 FAX (919) 788-7159 877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Shiloh Crossing Shopping Center .- a Page '2 The site inspection was conducted to compare the existing conditions with the authorized impacts approved by DWQ through the 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules with Additional Conditions. The bolded text represents the DWQ approved impacts and the un-bolded text represents site observations by DWQ staff. Wetland Impact 1: The proposed impacts to Wetland 1 are due to grading and fill associated with construction of the Wal-Mart parking lot. Impacts will occur in Phase 1 and include the entire 0.019 acres of Wetland 11 as shown on Figure 7. Mitigation will be required. Development has impacted entire wetland footprint. No additional field observations. Wetland Impact 2: The proposed impacts to Wetland 2 are due to grading and fill associated with construction of Shiloh Glenn Drive. Impacts will occur in Phase 1 and include the entire 0.108 acres of Wetland 2 as shown on Figure 7. Mitigation will be required. Development has impacted entire wetland footprint. No additional field observations. Wetland Impact 3A: The proposed impacts to Wetland 3A are due to grading and fill associated with the construction of Shiloh Glenn Drive. Impacts will occur in Phase 1 and include 0.073 acres of the northwestern portion of Wetland 3 as shown on Figure 8. Mitigation will be required. Weiland Impacts 3A are completed. At Wetland Impact 3A, vegetation is sparse under matting on the slope and rills are forming on top of the slope. Wetland Impact 311: The proposed impacts to Wetland 3B are due to grading and fill associated with the construction of Shiloh Glenn Drive. Impacts will occur in Phase I and include 0.040 acres of the northwestern portion of Wetland 3 as shown on Figure 8. Mitigation will be required. Wetland Impacts 3B are completed. No additional field observations. Wetland Impact 3C: The proposed impacts to Wetland 3C are due to grading and fill associated with construction of a private roadway connection from Shiloh Glenn Drive to Lower Shiloh Way. Impacts will occur in Phase 2 and include 0.166 acres In the middle of Wetland 3 and 758 square feet of Zone 2 riparian buffer as shown on Figure 8. Mitigation will only be required for the wetland impact. Wetland Impact 3C is not yet impacted (part of Phase 2). Linear Wetland Impact 4: The proposed impacts to Wetland 4 are due to grading and fill associated with the construction of Lower Shiloh Way and future development of 2 outparcels (Lots 2 and 6). Flow from Wetland 5 to Wetland 3 will be maintained with a stormwater by-pass for off- site run-off. Impacts will occur in Phase 2 and include the entire 0.039 acres of Wetland 4 as shown in Figure 9. Mitigation will be required. Wetland Impact 4 is not yet impacted (part of Phase 2) Shiloh Crossing Shopping Center .\4arch 12, 2010 Page 3 Wetland Impact 5: The proposed impacts to Wetland 5 are due to grading and fill associated with the widening of NC 54. Impacts will occur in Phase 1 and include the 0.004 acres of Wetland 5 as shown on Figure 9. Mitigation will be required. Wetland Impact 5 was not inspected. Wetland Impact 6: The main portion of Wetland 6 will not be impacted, however minor impacts are proposed to grading and fill associated with the construction of Lower Shiloh Way, development of Lot 9, and relocation of the existing Progress Energy overhead transmission line. Flow from the off-site NCDOT drainage will be maintained with a culvert. Impacts will occur in Phase 2 and include 0.029 acres of the linear wetland portion of Wetland 6 as shown on Figure 10. Mitigation will be required. Wetland Impact 6 is not yet impacted (part of Phase 2). Stream Impact 1: The proposed impacts to Stream 1 are due to grading and fill associated with construction of Shiloh Glenn Drive and a 36-inch diameter culvert in the channel with two 24" diameter culverts above the channel for flood conditions. Impacts will occur in Phase 1 and include 127 linear feet of stream impact, 9,538 square feet of Zone 1 riparian impacts, 7,988 square feet of Zone 2 riparian impacts as shown on Figure 11. Mitigation will be required for the stream and buffer impacts exceeding 150 linear feet. Pipe length measured approximately 105 LF (original stream meandered). Only one culvert was observed and it was submerged on the downstream end and clogged with debris and sediment on the upstream end. Diameter measurement could not be taken. On the downstream side, rills were observed in the slope in Zone 2 near end of the retaining wall. On the upstream side, erosion was observed above the retaining wall on the fill slope. Sediment deposition and debris is clogging the culvert pipe and is built up in the stream for -40 LF. Non-diffuse flow is entering buffer from a grassed ditch and a small temporary sediment trap. Rills were formed in Zones 1 and 2. Stream Impact 2: The proposed impacts to Stream 2 and riparian buffers are due to grading and fill associated with connection of Shiloh Glenn Drive to the existing NCDOT Service Road and two 9-foot x 10-foot box culverts In the channel. Two similarly sized box culverts exist 100-feet to the southeast under 1-540. Impacts will occur in Phase I and include 147 linear feet of stream, 8,552 square feet of Zone 1, and 5,233 square feet of Zone 2 as shown on Figure 12. Mitigation will only be required for the stream impact. It appears that the drainage network was installed differently than the approved design (PCN Figure 12). The flow splitter which divides the stormwater to either the level spreader or the bypass was originally shown on the southeast side of NCDOT Service Road and it appears to have been installed on the northwest side. The by-pass flow is discharging into Zone 2 (originally designed to discharge onto a dissipater in Zone 1 on the other side of the road) and is resulting in non-diffuse flow through the entire buffer. Buffer Impacts: The proposed impacts to Zone 1 and Zone 2 riparian buffers are due to grading and fill associated with construction of stormwater outlet pipes from the Extended Detention Wetland A, level spreaders (LS-1 and LS-3) for diffuse flow from Shiloh Glenn Drive, and access to the CP&L transmission line structures. Impacts will occur in Phase 1 and include a total of 1,792 Shiloh Crossing Shopping Center March 12, 2010 Page 4 square feet of Zone 1 riparian impacts and 7,320 square feet of Zone 2 riparian impacts as shown on Figures 13 and 14. Mitigation will not be required. Stream Buffer Impact #l, which was authorized as a 427 sq ft Zone 2 and 7 sq ft Zone 1 impact, is associated with the installation of stormwater drainage outlet and level spreader 1 (LS-1). There is concentrated flow through Zones 1 and 2 below and beside the -15 LF dissipater pad and unstable stream banks were observed as a result of concentrated flow through rills in the buffer. Stream Buffer Impact #2, which was authorized as a 1,192 sq ft Zone 2 and 1,064 sq ft Zone 1 impact, is associated with the installation of the Extended Detention Wetland A outlet. Approved plans show the dissipater extending to the stream but field observations show that the dissipater does not extend to the stream and rills have formed in Zone I and in the stream bank. Flow is short-circuiting the pad and channeling through Zone 1. Soil is eroding around the wing walls of the outlet structure in Zone 1. Stream Buffer Impact #3 appears to be installed as designed. Stormwater: Construction will occur in phases with initial stormwater controls for Phase I limited to Extended Detention Wetland A for Lots 1, 13 and 14 and four level spreaders for Shiloh Glenn Drive. Stormwater controls will be constructed later for future Phase 2 development of Lots 2 through 10 including Extended Detention Wetlands B and C and for future Phase 3 development of Lot 12 including Extended Detention Wetlands D and E. Phase 1: The final stormwater management facilities for Phase I (that includes Lot 1, Wal-Mart, Sam's Club, and Shiloh Glenn Drive) shall be constructed according to the approved stormwater management plans received on May 15, 2007. The stormwater drainage infrastructure and treatment facilities shall be constructed and operational prior to occupying any of the above buildings. Extended Detention Wetland A: Permanent pool elevation 345 ft., Temporary pool elevation 355.68 ft., Permanent pool surface area 72,519 sq. ft., Forebay surface area 42,099 sq. ft, Marsh 0-9" surface area 27,945 sq. ft., Marsh 9-18" surface area 26,008 sq. ft., Micro Pool Surface area 11,500 sq. ft. and diameter of orifice 4.0 inches. Large areas of side slopes inside Extended Detention Wetland A lack good vegetative cover and the slopes are very steep (steeper than the 2.5H:1 V shown on the approved plan in some areas per the Cut/Fill Design Criteria). The outlet valve is in the open position and Wetland A is drained below the outlet invert. Some wetland plants were present in Wetland A but not to the extent shown in the approved plan (need to request final planting details). The soil in Wetland A has large sticks and debris and it appears the soil was not conditioned to ensure the survival of wetland plants per the Wetlands Grading & Planting Notes on the approved plan. The protective matting of the emergency spillway is not installed properly; the soil underneath has sticks and debris and the fabric undulates instead of laying flat. A fence is installed across the concrete spillway, leaving a clear opening of approximately 6 inches high. The dissipater pad at the discharge pipe is in disrepair. Extended Detention Wetland B: Permanent pool elevation 356 ft., Temporary pool elevation 357.49 ft., Permanent pool surface area 10,038 sq. ft., Forebay surface area TBD sq. ft, Marsh 0-9" surface area TBD sq. ft., Marsh 9-18" surface area TBD sq. ft., Micro Pool Surface area TBD sq. ft. and diameter of orifice 2.0 inches. This stormwater device is still a temporary skimmer basin. Wake County Sediment & Erosion Control still maintains an active E&SC permit for this measure. Shiloh Crossing Shopping Center March 12, 2010 Page 5 Extended Detention Wetlands C and D: Not yet constructed. Extended Detention Wetland E: Permanent pool elevation 325 ft., Temporary pool elevation 325.76 ft., Permanent pool surface area 19,523 sq. ft., Forebay surface area TBD sq. ft, Marsh 0-9" surface area TBD sq. ft., Marsh 9-18" surface area TBD sq. ft., Micro Pool Surface area TBD sq. ft. and diameter of orifice 3.0 inches. This stormwater device is still a temporary skimmer basin. It is not covered under DLR or a DLR delegated-Local Program permit according to the records available to DWQ. The outlet discharges into the protected riparian buffer in a non-diffuse manner. Level Spreader 1 (LS-1): Length 43 ft., Maximum Filter Strip/Buffer Slope: 4.0%, Maximum Discharge from 1"/Hr Strom: 3.18 cfs, Maximum Discharge to Level Spreader: 3.28 cfs, Filter Strip/Zone 1 Buffer Vegetation: Forested, Filter Strip/Zone 1 Buffer Width: 50 ft., Filter Strip/Zone 2 Buffer Vegetation: Grass, Filter Strip/Zone 2 Buffer Width: 55 ft. Field measurement of level spreader length shows LS-1 is -45 LF. The lower part of grass filter strip is covered with sediment deposition from a washout on the side of the level spreader (sediment must be removed from buffer and buffer re-seeded). In addition, erosional gullies were observed in upper part of grass filter strip. Non-diffuse flow observed below and beside bypass outlet dissipater pad (-IS'L) in Zones I and 2. Rills are formed in the buffer and a gully was observed in the stream bank. Trash was observed. Level Spreader 2 (LS-2): Length 77 ft., Maximum Filter Strip/Buffer Slope: 7.4%, Maximum Discharge from 1"/Hr Strom: 1.15 cfs, Maximum Discharge to Level Spreader: 1.19 cfs, Filter Strip/Zone 1 Buffer Vegetation: Forested, Filter Strip/Zone 1 Buffer Width: 50 ft., Filter Strip/Zone 2 Buffer Vegetation: Grass, Filter Strip/Zone 2 Buffer Width: 20 ft. Field measurement of level spreader length shows LS-2 is --85 LF. Filter strip/Zone 1 buffer is now maintained for a power line easement. Sediment was observed along the level spreader. There are very steep slopes above the level spreader and the vegetative cover is sparse. The matting does not lie flat. The slope is eroding on the right end (looking at the front of the level spreader) and rills are present. Rills were observed under the matting of the filter strip, undermining it. Trash was observed. Level Spreader 3 (LS-3): Length 59 ft., Maximum Filter Strip/Buffer Slope: 6.7%, Maximum Discharge from 1"/Hr Strom: 1.31 cfs, Maximum Discharge to Level Spreader: 133 cfs, Filter Strip/Zone 1 Buffer Vegetation: Forested, Filter Strip/Zone 1 Buffer Width: 30 ft., Filter Strip/Zone 2 Buffer Vegetation: Grass, Filter Strip/Zone 2 Buffer Width: 20 ft. Field measurement of level spreader length shows LS-3 is --65 LF. Concentrated flow was observed in the grass filter strip. Rill present. Level spreader may not be level. Vegetation on slope above the forebay is sparse and small shrubs need to be removed. Level Spreader 4 (LS-4): Length 42 ft., :Maximum Filter Strip/Buffer Slope: 1.4%, Maximum Discharge from 1"/Hr Strom: 0.61 cfs, Maximum Discharge to Level Spreader: 0.64 cfs, Filter Shiloh Crossing Shopping Center March 12. 2010 Page 6 Strip/Zone 1 Buffer Vegetation: Forested, Filter Strip/Zone 1 Buffer Width: 30 ft., Filter Strip/Zone 2 Buffer Vegetation: Forested, Filter Strip/Zone 2 Buffer Width: 20 ft. Field measurement of level spreader length shows LS4 is -45 LF. The discharge to the level spreader appears to be greater than the maximum allowed discharge. Trees removed from filter strip/Zone 1 and filter strip/Zone 2. Concentrated flow through the filter strip is resulting in eroded soils in filter strip/Zone 1 and filter strip/Zone 2. Leaf build, up observed in level spreader. As a result of the site inspection and file review, the following violation, described below, is noted: 401 WOC Condition Violation The approval of the 401 Water Quality Certification and Authorization Certificate per the Neuse Buffer Protection Rules with Additional Conditions letter specifies that the activities must follow the conditions listed in the General Water Quality Certification, as well as additional conditions listed in the letter. General Water Quality Certification #04-1764, Ver. 3, Additional Condition 1 states the following: "Impacts Approved. The following impacts are hereby approved as long as all of the other specific and general conditions of the Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts:" Type of Impact Amount Approved (Units) Plan Location or Reference 404/Wetland 0.479 (acres) PCN page 10 of 17 Stream - perennial 274 (linear feet) PCN page 10 of 17 Buffer - Zone 1 18,533 (square ft. PCN page 14 of 17 Buffer - Zone 2 19,912 (square ft. PCN page 14 of 17 General Water Quality Certification #04-1764, Ver. 3, Additional Condition 3 states the following: "Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards; (Please refer to DWQ Approval Letter dated December 17, 2007 - Attachment A for details of this Additional Condition.)" General Water Quality Certification #04-1764, Ver. 3, Additional Condition 5 states the following: "Culvert Installation. (Please refer to DWQ Approval Letter dated December 17, 2007 - Attachment A for details of this Additional Condition.)" General Water Quality Certification #04-1764, Ver. 3, Additional Condition 7 states the following: "Written Stormwater Management Plan (Final Plan Needed) Required for Each Phase. (Please refer to DWQ Approval Letter dated December 17, 2007 - Attachment A for details of this Additional Condition.)" Requested Response You are directed to respond to this letter in writing to DWQ at the address provided below within 30 days of receipt. Shiloh Crossing Shopping Center March 12, 2010 Page 7 1. Please provide documentation (including a detailed site map/survey) depicting all jurisdictional water features (e.g. streams, wetlands and buffers) on the site. This documentation should describe and quantify the impacts to those jurisdictional features and should include plans to avoid further unauthorized stream, buffer and wetland impacts on the site. 2. Please provide documentation showing erosion and sediment control practices in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. 3. Existing stream dimensions must be maintained above and below locations of each culvert. Provide documentation showing that Stream Impact #1 culvert has been installed in such a manner that the original stream profiles are not altered above and below the culvert. a. Show that the culvert has not and will not cause aggradation or erosion of the stream up or down stream of the culvert. b. Show that the culvert provides for continuity of water movement and can adequately accommodate high water or flood conditions. 4. Provide documentation showing the as-built condition of the stormwater drainage system at Stream Impact #2 and provide documentation of appropriate buffer authorizations for existing impacts. 5. Provide a Plan that addresses non-diffuse flow in the Neuse Riparian Buffer Zones I and 2 for the entire site. 6. Provide documentation that shows the final stormwater management facilities for Phase I were constructed in accordance with the approved stormwater management plans received on May 15, 2007. Include in this documentation an As-Built for Wetland A, the wetland plantings and associated soil conditioning for Wetland A, and verification from the engineer that the fence on the spillway will not impede water flow or unduly block debris resulting in impeded water flow during a large rain event. 7. Provide NPDES rainfall and BMP monitoring records for the temporary skimmer basin (Extended Detention Pond B) that is covered under the Division of Land Resources-Delegated Local Program Wake County Erosion and Sedimentation Control Permit program. 8. Remove the temporary skimmer basin (Extended Detention Wetland E) or convert to an extended detention wetland. 9. Provide documentation showing the level spreaders were constructed and installed as designed. Submit a Plan that addresses the Operation and Maintenance problems at all level spreaders, including a timeline. Submit Reauested Items To: Natalie Landry DWQ Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Shiloh Crossing Shopping Center March 12, 2010 Page 8 Thank you for your attention to this matter. This office requires that the violations, as described above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation. Should you have any questions regarding these matters. contact Natalie Landry at (919) 791-4200. Sincere y, Danny S Region Supervisor Surface Water Protection Section Attachment cc: John Hennessy, NPS Assistance and Compliance Oversight Unit Ian McMillan, 401 Wetlands Permitting Unit, 1650 MSC, Raleigh, NC 27604 USAGE Raleigh Regulatory Field Office Jennifer Mitchell, Wake County Water Quality Div., 336 Fayetteville Street, Raleigh, NC 27602 Chris Roberts, Durham County, 120 E. Parrish St., 1' Floor, Durham, NC 27701 Keith Billy, Town of Morrisville, 260 Town Hall Dr., Suite B, Morrisville, NC 27560 Austin Watts, Kinley-Horn, PO Box 33068, Raleigh, NC 27636-3068 Todd St. John, Kinley-Horn, PO Box 33068, Raleigh, NC 27636-3068 Kevin Martin, S&EC, l 10 10 Raven Ridge Road, Raleigh, NC 27614 Bradley Bowling, Priest, Craven & Assoc., 3803B Computer Dr., Raleigh, NC 27609 Registered Agent, CT Corporation System, Box 1011, Raleigh, NC 27601 . ` . ?ftaGhm?f ? o t WA rF9 \oC? OG Michael F Easley, Governor 9 William G. Rosa Jr., Secretary >_ y North Carolina Department of Envirwrment and Natural Resources O ? C01ee11 H. Sullins, Director Division of Wager Quality December 17, 2007 DWQ Project # 04-1764, Ver. 3 Wake/Durham County Mr. Karl Blackley MBV Investors, LLC 100 Weston Estates Parkway Cary, NC 27513 Subject Property: Shiloh Crossing UT to Stirrup Iron Creek [030402, 27-33-4-2, C, NSWj Approval of 401 Water Quality Certification and Authorisation Certificate per the Neuse River Buffer Protection Rai" (13A NCAC 2B.0233) with Additional Conditions • MODUgCATION Dear Mr. Blackey: You have our approval, in accordance with the attached conditions and those listed below, to place fdl within or otherwise impact 0.479 acres of 404/wetland and 274 linear feet of square feet of Zone 1 protected NOM River basin perennial stream, 18,533 protected Neese River basin riparian buffers, OW 19,912 sgwra feet of Zone 2 buffers to construct the proposed commercial development; as described in your revised application dated November 19, 2007, and received by the Division of Water Quality (DWQ) on November 21, 2007. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3705 (GC3705). The Certification(s) allows you to use Nationwide Permit(s) NW39 when issued Engineers (USACE). This letter shall also act as Your by the US Army Corps s the protested riparian buffers approved Authorization Certificate for impacts to per 1 SA NCAC 2B .0233. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with our including (but not limited to) Erasion and Sediment Control, and Non-disc project Als% approval to proceed with your proposed imparts or to conduct Impacts Non-discharge regulations. picted this de your application shall expire upon expiration of the 404 or CAMA Pewaters as depicted in This approval is for the purpose and design that you described in our project, you must notify era and you may be y application. If you change your required the new owner must be given a copy of this Certification said and us s a gal letter aanndn is therebproP sold, complying with all conditions. If total fills for this Y responsible for wetland or 150 linear feet of steam, cam project (now or in the future) exceed one acre of NCAC 2H .OS06 (h}. This approval compensatory mitigation may be required as described is I SA PP requires you to follow the conditions listed in the attached certification and any additional conditions Noted below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and conditions of this Certification (or Isolated Wetland permit) are met. general No other impacts are approved including incidental impacts: 401 Oversight/Express Review Pe matins unit 1630 Mail Service Center, Rak' 2321 Crabtroe 9oakvard, Suite 230,. RakiBh, North 7Carol na 27604 ??'u Phone: 919.733-17116 / FAX 919-733.6893 / Internet: 4.fllt:l?tit?II?.Yrb1S?M?11iaS?t An Equal Opporcuoity/Afiumative Action Employer - 30% Rerycled/10% Post Consumer Paper MBV Investors, LLC • Page 2 of 6 December 17, 2007 Type of Impact Amount Approved nits Plan Location or Referenee 404/Wetland 0.479 acres PCN page 10 of 17 Stream - perennial 274 linear feet PCN pqp 10 of 17 Buffer -Zone 1 18,533 (square ft.) PCN palp 14 of 17 Buffer - Zone 2 19,912 (square ft.) PCN pqe 14 of 17 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. AU construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: L The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planing and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requir a ab specified in the most recent version of the North Carolina Sediment and Erasion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or based borrow pits associated with the project c. Sufficient materials required for stabilization and/or repair of erosion control measures and stornuwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (bWJ/www.nc dooLgM doh/ooerations/BMP ma mUownkWMMP Manual.odt) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes am or become perched, the appropriate MBV Investors, LLC Page 3 of 6 December 17, 2007 stream grade shall be n established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including this cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert Therefore, you must provide plans with adequate details that indicate that the current stability of dw stream will be maintained or enhanced. You must receive written approval from this Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according to approved plans. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 4E inches, sad 20 parent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of wader and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shalt not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and dawn stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. Tlne establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all wait included in the X401 Certification has been completed. The responsible party shall complete the attached farm and return it to the 401/Weda ndt Unit of the NC Division of Water Quality upon completion of the project. Please send photogru hs Vetnant and downrovarn of each culvert site to docent correct installation along with the Certif tcate of Completion form. 6. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Auftrization Certificate. A sample deed notification can be downloaded from the 401 /Wetlands Unit web site at httpJ/h2o.enr.state.nc.us/wwedands. The text of the sample deed notification may be modified as appropriate to suit to this project. 7. Written Stormwater Management Plan (Final Plan Needed) Required For Each Phase A final, written stormwater management plan (including a signed and notarized Operation and M"ftnance Agreement) foe each phm of tike eadn project atoll be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604) and the stormwater management plans shall be approved in writing by this Office before the hxpeca, MBV Investors, LLC Page 4 of 6 December 17, 2007 occupied infiu vucture occupancy of buildings for that partkular phase may occur. You have the option of using the Express Review Program for expedited approval of these plans. If you propose to use the Express Review Program, remember to include the appropriate fee with the plan. Site-specific stormwater management shall be designed to remove 85% TSS according to the latest version of DWQ'a Stormwater Best Management Practices manual at a minimum. Additionally, in watersheds within one mile and draining to 303(d) listed waters, as well as watersheds that are classified as nutrient sensitive waters (NSW), water supply waters (WS), trout waters (Tr), high quality waters (HQW), and outstanding resource waters (ORW), the Division shall require that extended detention wetlands, bio-retention areas, and ponds followed by forested filter strips (designed according to latest version of the NCDENR Stormwater Best Management Practices Manual) be constructed as part of the stormwater management plan when a site-specific stormwater management plan is required. The structural stormwater practices as approved by the Wetlands Unit as well as drainage pattern must be maintained In perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. The following language is hereby incorporated into this Condition per the request contained in your correspondence to DWQ, dated May 15, 2007, and received by the DWQ on May 16, 2007: Phase 1: 71e final stormwater nra2MMent facilities for Phase 1 !that includes Lot 1 Wal-Mart Sam's Club, and Shiloh Green Q W shaU be constructed according to the WAroved stormwater manMMent clans received on May 15 2007, The stormwater drainage indrasrrua= and treaunt facilities shall be eoratnycted and operational prior to oeeupavirq; W gfthe above build m. Phase 2: Find ailing and innpacts to Wetlandt #3C. #4. #6A. and #6B will be bated on thearelitninarv stornmadff agggUn eg dent received May JS. 2007. Now ofthe buildings and JsQwMiMgx associated with Phase 2 (that includes Lots 2 throuul?10 and Lower Shiloh Way) will be espied until the stornnmwater drainage infrastrucim and treatment facilities are constructed and operational according to the approved storrnwgter nrana?enrent clans. Phase 3: Fm gtgd= based on the paksinara? _stmmwa_1ir n..%, u w%nit plans received Mau 15 . 2007. Now of the buildings and idlfnstrueture associated with Phan 3 fthat includes Lot 12) wU1 be occuaied w N the stormmwater drainage infrastru "m and tre.Menst facilities are constructed and operational acceiga to the approved stormwater mew am 8. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 213.0233 and GC3627; MBV Investors, LLC Page 5 of 6 December 17,2007 9. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has beam determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clean your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5205 if you have any questions concerning payment into a restoration fund. You have 60 calendar days from the date of this approval to make this payment. For accounting purposes, this Autborization CertNkate aatrorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: T o(INDW Gw irM R1wr aa4 Sum Number Seen - perewW 274 feet NewaPII3020201 Buller Zoo 1 3 644 rw we iMt Nouso 03020201 Buffer Zone 2 1926 (mm Poet Neuse/03020201 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authofization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 1 SOB of the North Carolina General Statutes to the Office of Administrative 14ea iW 6714 Mail Service Center, Raleigh, N.C. 27699.6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. MBV Investors, LLC •r Page 6 of 6 December 17, 2007 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within I SA NCAC 2B .0233. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786. Sin ly, oleen H. Sullins CHS/Ym Enclosures: GC3705 Certificate of Completion cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Craig M. Duerr, Kimley-Horn and Associates, Inc., P.O. Box 33068, Raleigh, NC 27636-3068 Filename. 041764Ver3ShilohCrouk*Wahe_DurhamH01NBR