HomeMy WebLinkAbout20100559 Ver 1_More Info Received_20100927ko-- 0S 5q
Marge Hogan
PO Rox 1743
Cashiers, NC 28717
(828) 743-0898
Mhogan387(@,gmaii.com
Ms. Susan A. Wilson
Surface Water Protection Section
2090 US Hwy 70
Swannanoa, NC 28778
DWQ Project #10-0559
September 24, 2010
Dear Ms. Wilson,
Enclosed is a sketch of our proposed shoreline stabilization project. We propose to apply
dry stack stone boulders 6 feet high, along 150 feet of shoreline following Duke Power
guidelines to stabilize and prevent further erosion. The contractor will use a barge to
bring rock and equipment. His crew will build the wall using a mid-size track hoe and by
hand. No trees will need to be removed. Mulch will be applied to the disturbed area. He
will begin work as soon as permitted since the lake has already been drawn down.
We will use a floating dock and ramp system. The ramp will connect at the retaining
wall. No asphalt will be used.
If you need any additional information please call or e-mail me at the above address.
Sincerely,
Marge Hogan
G
0
SEP 2 7 ZQio
WULAMS ANV?o? nT?ER ORN"
J
C
Please appro.aximate-ty sketch the following information on t'l7is plan
(please provide dimensions for each it-am, such as 18 ft. x 100 ft):
1) All proposed vegetation clearling (provide dimensions) */A
) Location of rip rap or fill to i e placers above the Fuel Pond elevation
.3) Location of rip rap or fill to tae placed below the Full Pond elevation
4) The iocation. of any ;prppos-ed structures such as buildings, retaining
walls$ docks, etc,
6) The location of any excavation or drudging below the Full Pond
clay Lion N o 4 v-o-d i n
of
o?
X
bet?.u?t?
X ISZ I
a
Location of construction cce corridors. b 6G v- C_
/57V,`
4X'?''j fct-c
&C1W("f ? &_?10 /3 !:?
A j ?{ v ?d `?? I Ttil? tic J i t v..; v (rU ,. ?i u A d- (I Foco i'?j ir- Jj
-PA-srC'w
Figure 3. r ?J ??nn p t??? L-c o r- s, -rte o -? f)
Dry Stack Boulder Wall Design Guidelines
Dry Stack Boulder wall
Full Lake Level
'
Min
-
'a €'3 feet ?CD a
oo,
(Do 0
Riprap slope no
greater than 1 to 2
1 Riprap
(Chas B - s°. is"siu)
2
Page 37 of 44 Final rev 7/1/03
STA- C- I,-
Cc) IJ1 h I y tk(tA10i
-Ie- Iolr - IW
(?-4
Neap of Mac-Lake Or, Ulenvine, NL Z5 isa
When using any driving directions or map, it's a good idea to do a reality check and make sure the road still exists,
watch out for construction, and follow all traffic safety precautions. This is only to be used as an aid in planning.
rageiuii
http://maps.yahoo.com/print?mvt--n&ioride--us&tp=1 &stx=&fcat=&frat=&clat=3 5.170191 &clon=-83.1... 9/24/2010