HomeMy WebLinkAboutNCC202330_NOT Closeout Documents_20201209North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Iredell Project: AT & T Harmony, NC (AOISVLP) River basin: Yadkin-PeeDee
Person financially responsible: Bellsouth Telecommunications, LLC - Michael B Project N: IREDE-2020-012
Wiggin, Director AT&T
Address: 624 Industrial Ave, 1 st Floor, Salisbury, NC 28144
1. Project Location: Olin Road and Tatum Road, Harmony
Pictures: No
2. Weather and soil conditions: Sunny, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one on site Title:
Inspection report: Sent Report Date given/sent: November 06, 2020
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities should be
requested by the permittee via Notice of Termination.
Reported by: Jesse McDonnell Others present:
Date of inspection: November 05, 2020 Time arriving on site: 3:40 PM Time leaving site: 4:00 PM
cc:
Yes