Loading...
HomeMy WebLinkAboutNCC202330_NOT Closeout Documents_20201209North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Iredell Project: AT & T Harmony, NC (AOISVLP) River basin: Yadkin-PeeDee Person financially responsible: Bellsouth Telecommunications, LLC - Michael B Project N: IREDE-2020-012 Wiggin, Director AT&T Address: 624 Industrial Ave, 1 st Floor, Salisbury, NC 28144 1. Project Location: Olin Road and Tatum Road, Harmony Pictures: No 2. Weather and soil conditions: Sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: November 06, 2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination. Reported by: Jesse McDonnell Others present: Date of inspection: November 05, 2020 Time arriving on site: 3:40 PM Time leaving site: 4:00 PM cc: Yes