HomeMy WebLinkAbout20000653 Ver 1_Certification of Completion_20031029THE DCOCK COMPANIES
1101 S. Horner Blvd., P.O. Box 3367, Sanford, NC 27330
Adcock Appraisals, Inc. San-Lee Builders, Inc. Adcock Rental Management, Inc.
(919)774-9582 (919)775-5429 (919)774-6046
Security Maintenance & Repair, Inc. ACA/PJA,LLC Homestead, Inc.
(919)775-2376 (919)774-9582 (919)774-9582
October 27, 2003
N.C. Dept. of Environment and Natural Resources
Division of Water Quality
WETLANDS/ 401 GROUP
Wetlands/401 Unit OCT 2 9 2003
1621 Mail Service Center
Raleigh, NC 27699-1621 WATER QUALITY SN
Re: DWQ Project #00-0653
Dear Sir or Madam:
Enclosed please find the certification page with regard to the above permit
indicating completion of the activity authorized by the permit.
Please let me know if you have any questions.
Sincerely,
ACA/PJA, LLC
Paul J. Adcock
of v A7k;9
G
A r?-
o c
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D.
Acting Director
Division of Water Quality
November 13, 2001
Lee County
DWQ Project # 00-0653
APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS
Mr. Robert Adcock
ACA/PJA, L.L.C.
1101 South Homer Blvd.
Sanford, NC 27330
Dear Mr. Adcock:
You have our approval, in accordance with the attached conditions and those listed below, to place fill material in 0.33 acres of
wetlands and 115 feet of streams in order to construct the Jonesboro Industrial Park in Lee County, as described in your application
dated May 19, 2000 (revised November 2, 2001). After reviewing your application, we have decided that this fill is covered by General
Water Quality Certification Number 3287. This certification allows you to use Nationwide Permit Number 39 when the Corps of
Engineers issues it. In addition, you should get any other federal, state or local permits before you go ahead with your project including
(but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Water shed regulations. This
approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General
Certification. This certification replaces one issued to you on July 17, 2000 with stormwater plan comments on April 12, 2001.
This approval is only valid for the purpose and design that you described in your application except as modified below. If you
change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner
must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total
wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
1. This modify approval is for total impact for the Industrial Park of 0.33 acres of wetlands and 115 feet of stream. If any additional
wetland impact is applied for or found via a site visit, then written DWQ approval is needed including on-site permanent stormwater
management for the entire Industrial Park
2. Upon completion of the project, the applicant shall complete and return the enclosed "Certification of Completion Form" to notify
DWQ that all work included in the 401 Certification had been completed. The responsible party shall complete the attached form
and return it to the 401 wetlands Unit of the Division of Water Quality.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North
Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any
questions, please telephone John Domey at 919-733-1786
N Ef+?R
Customer Service
1 800 623-7748
Wetlands/401 Unit 1650 Mail Service Center Raleigh-NC 27649-1650 Ph: (919) 733-7015 Fax: (919) 733-6893
r
cc: Corps of Engineers Raleigh Field Office
Raleigh DWQ Regional Office
File copy
Central Files
Hal Owen, PO Box 400, Lillington, NC 27546
Jennifer Burdett; Soil and Environmental Consultants
Ken Bright; PO Box 553; Sanford, NC 27330
V
DWQ Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 4011/Wetlands Unit, North Carolina Division
of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699.1621.This form may be returned to DWQ by the applicant, the
applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
AppH is Certigc?a ion
"V ? c
I, .1P A60 JpgrA, L Le- , hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 4 1 Water Quality Certif tion and Buffer Rules, the approved plans and specifications, and other supporting
materials. ' L_ LZ
Signature Date: -3
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer, Landscape
Architect, Surveyor, ect.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the
construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and
intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature Registration No. Date