HomeMy WebLinkAbout20201918 Ver 1_Riparian Buffer Authorization Request_20201204 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 12/4/2020 6:48:55 AM(Start)
Approve by Montalvo, Sheri A 12/9/2020 3:19:33 PM(DOT-Initial Review)
• Carpenter,Kristi reassigned the task to Montalvo, Sheri A 12/8/2020 10:38 AM
* After checking with a transportation reviewer and we believe this project to be a non-transportation
project.
• The task was assigned to Carpenter,Kristi 12/4/2020 6:49 AM
Buffer Authorization Application Form ICENVIRONMENTAL Wate�aesou��es QUALITY
15ANCAC 02B.0233(8)(b),.0243(8)(b),.0250(11)(b),.0259(8)(b),.0267(11)(c),.0607(e)(2)Buffer Authorization Online Fo
Update 10/23/2018
Original Submittal 12/4/2020
A. Owner/Applicant Information
General Information A
Primary Contact Email:* Jonathan.Hilfiker@duke-energy.com
Rease list the contact person's enail for questions or paynant on this project if needed.
Who is submitting the application?* r- Owner
rJ Applicant other than Owner
r- Agent
Is there an agent working on this application r Yes
but not submitting it? C No
1. Property Owner Information:
1a. Name on Recorded Deed:* Charles H. Lee
lb.Responsible Party: (for Corporations)
1c. Mailing Address:* Street Address
719 New Bethel Road
Address Line 2
aty State/E'ovince/Region
Garner NC
Fbstal/Zip Code Country
27529-8244 US
I d.Telephone:* 919-553-6470 1e. Email Address:* unknown@email.com
2.Applicant's Information (if different from owner):
2a. Name: Jimmy Perry
2b.Company Affiliation: Duke Energy
2c. Mailing Address: Street Address
4690 Simms Creek Rd
Address One 2
aty State/R-ovince/Region
Raleigh NC
R�stal/Zip Code Country
27616-3600 US
2d.Telephone: 919-805-1743
2e.Email Address: Jimmy.Perry@duke-energy.com
B. Project Information and Prior Project History
1. Project Information
1a. Name of Project:* Duke Energy Line Extension
(Subdivision,facility,or establishrrent nano)
lb.Is this a publicly-funded transportation project?*
Yes
✓ No
1c.TIP# R-2828
Id.Subdivision Name:
le.Nearest
Municipality:
If.Property Size: acres
1g.County(or Counties)where the project is located:*
Johnston
lh.Property ID# Date of Purchase
Tax RN or Parcel id
1 i.Deed Information
Type of Book Book# Page#
Deed 02441 0405
Map 1638
1j.Attach a copy of the recorded map that indicates when the lot was last platted.
Click the upload button or drag and drop files here to attach docurrent
FM only
1k.How would you like to provide the Latitude and Longitude information?*
C' Address Lookup
✓ Manually
Address Lookup Street Address
719 New Bethel Road
Address Line 2
Clty State/Province/legion
Garner NC
Fbstal/Zip Code Country
27529-8244 US
Latitude* 35.627954 Longitude* -78.545739
11.Is the project located in any of North Carolina's twenty coastal counties?*
✓ Yes
C No
2. Surface Waters
2a.Name of the nearest body of water to proposed project:*
Unnamed tributary of Swift Creek
2b.Water Quality Classification of nearest receiving water:*
C; NSW
2c.List the total estimated linear feet of all existing streams(intermittent and perennial)on the property:*
1,020
(linear feet only)
3. Project Description:
...............................................................................................................
3a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The site is a crop field with an existing stream and partially wooded areas.
3b.Attach an 8 1/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
Qick the upload button or drag and drop files here to attach docurrent
topo.pdf 46.24KB
FDF only
3c.Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the
project site.
Click the upload button or drag and drop files here to attach docurrent
soil.pdf 75.39KB
20201203_11443711923_44_Soil_Map.pdf 159.29KB
FEF only
4. Proposed Activity
.............................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:*
Duke Energy has plans to construct an OH power line in this area.We will use line
truck/bucket truck from existing road.Will be trimming trees with buckets from the
road and some hand clearing outside the buffer zone.
Attach a site plan as applicable to the project:
Click the upload button or drag and drop files here to attach docurrent
FEF only
5.Jurisdictional Determinations
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this
property/project(including all prior phases)in the past?*
✓ Yes
r No
6. Project History
6a. Have permits or certifications been requested or obtained for this project(including all prior phases)in the past?*
✓ Yes
✓ No
7. Future Project Plans
7a.Is this project a phased project?* r Yes
r No
C. Proposed Impacts Inventory
Buffer Impacts
Project is in which protected Basin?*
C Neuse River Basin(15A NCAC 02B.0233)
✓ Catawba River Basin(15A NCAC 02B.0243)
✓ Randleman Lake Watershed(15A NCAC 02B.0250)
✓ Tar-Pamlico River Basin(15A NCAC 02B.0259)
✓ Jordan Lake Watershed(15A NCAC 02B.0267)
✓ Goose Creek Watershed(15A NCAC 02B.0606&15A NCAC 02B.0607)
Individually list all buffer impacts below. If any impacts require mitigation,then you MUST fill out Section D of this form.
Site#-Reason Stream Name Buffer Impact* Impact Type* Zone 1 Zone 2
Stream Crossing Unnamed Temporary Exempt 1,260. 975.00
Map label(e.g.R ad Tributary of (T) 00 Square
Crossing 1) Swift Creek F2rmor Terrp Square Feet
Feet
Total Zone 1 Impacts: 1,260.00
Total Zone 2 Impacts: 975.00
Total Buffer Impacts: 2,235.00
Comments:
Tree trimming and removal for overhead electric service line construction. No stump
removal. No mechanical equipment within the buffer area
D. Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.*
No power poles will be installed within the buffer area.
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.*
We have plans to do most of the tree clearing from the road.We will do some hand
clearing,where needed.We will install waddles 10'from the stream,as a
preventative erosion control measure.All the debris will removed by hand without
the use of mechanical equipment.We will use wattles to minimize the impact.
E. Diffuse Flow Plan
1a.What type of SCM are you providing?*
✓ Level Spreader
✓ Vegetated Conveyance(lower SFWT)
✓ Wetland Swale(higher SHWT)
17 Proposed project will not create concentrated stormwater flow through the
buffer
✓ Other SCM that removed minimum of 30%nitrogen
1c.Diffuse Flow Documentation* aick the upload button or drag and drop files here to attach docurrent
R-2828 TIE.pdf 965.58KB
FCF only
F. Supplementary Information
Environmental Documentation
1a. Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?
r Yes
fr No
Violations
2a.Is the site in violation of DWR Wetland Rules(15A NCAC 02H.0500),Isolated Wetland Rules(15A NCAC 02H.1300),DWR
Surface Water or Wetland Standards,or Riparian Buffer Rules(15A NCAC 02B.0200)?
r Yes
C No
2b.Is this an after-the-fact buffer authorization application?
C Yes
C' No
G.Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments: Click the upload button or drag and drop files here to attach docunent
FEF only
Additional Comments:
H. Sign and Submit
._J
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
By digitally signing below,I certify that:
o I have given true,accurate,and complete information on this form;
o I agree that submission of this form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic
Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic
Transactions Act");
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the application form."
Print Name:* Jimmy Perry
Signature
Submission Date: (Auto populated field)
Initial Review
Is this accepted into the review process?* CJ Yes O No
Is this project a public transportation CJ Yes
project?* r No
ID#* 20201918
Version:* 1
Select Reviewer: Stephanie Goss:eads\szgoss
Select Reviewing Office* Raleigh Regional Office-(919)791-4200
Has payment been received?* (2' No Payment Needed
r Fee Received
r Need Fee-send electronic notification