Loading...
HomeMy WebLinkAbout20201217 Ver 1_Buffer Approval Letter_20201209 December 9, 2020 DWR # 20201217 Wake County Duke Energy Progress LLC Attn: Paula Gourley 550 S. Tryon Street, Dec. 22A Charlotte, NC 28202 Subject: APPROVAL OF NEUSE RIVER BASIN RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS Project Walter Dear Ms. Gourley: You have our approval for the impacts listed below for the purpose described in your application dated October 29, 2020, received by the Division of Water Resources (Division) on October 30, 2020 with additional information received on November 24, 2020. These impacts are covered by the Neuse River Buffer Rules and the conditions listed below. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This Authorization Certificate shall expire five (5) years from the date of this letter. The following impacts are hereby approved, provided that all of the Conditions listed below and all of the conditions of the Neuse River Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B Neuse .0611(b)(2)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers – Zone 1 B1: Sanitary Sewer Line 32 (square feet) 0 (square feet) B2: Sanitary Sewer Line 3,174 (square feet) 0 (square feet) DocuSign Envelope ID: 94852658-CC1A-44CA-966A-6F8E0ADD0AC0 Project Walter DWR# 20201217 Buffer Authorization Certificate Page 2 of 3 B3: Stormwater Bypass Channel 1,279 (square feet) 0 (square feet) Buffers – Zone 2 B1: Sanitary Sewer Line 2,426 (square feet) 0 (square feet) B2: Sanitary Sewer Line 1,725 (square feet) 0 (square feet) B3: Stormwater-Rip Rap Dissipator 882 (square feet) 0 (square feet) Additional Conditions: 1. Compensatory Mitigation Using a Private Mitigation Bank Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received a Statement of Availability letter from EBX-Neuse I, LLC Neuse Riparian Buffer Umbrella Mitigation Bank (EBX-Neuse I), RES Neuse Buffer and Nutrient Offset Umbrella Mitigation Bank (RES), RES Poplar Creek Buffer & Nutrient Offset Umbrella Mitigation Bank or EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank (EBX) to meet this mitigation requirement. The specific bank site to be debited will be Buffalo Branch, Selma Mill, Cedar Grove, Hatley, Ezell, Bucher, Polecat, Hannah Bridge, Meadow Spring, Uzzle, Poplar Creek and Stone Creek all located in HUC 03020201. Until EBX-Neuse I, RES or EBX receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to EBX-Neuse I, RES, or EBX to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Compensatory Mitigation Required Bank Sponsor River & Sub-basin Number Buffer- Zone 1 13,359 (square feet) EBX-Neuse I, LLC or EBX Neuse: 03020201-Outside Falls Lake Watershed This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] If you are unable to comply with any of the conditions below, you must notify the Raleigh Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. DocuSign Envelope ID: 94852658-CC1A-44CA-966A-6F8E0ADD0AC0 Project Walter DWR# 20201217 Buffer Authorization Certificate Page 3 of 3 The permittee shall report to the Raleigh Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0714]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under the Neuse River Riparian Buffer Rules as described in 15A NCAC 02B .0714. Please contact Stephanie Goss at 919-791-4256 or Stephanie.Goss@ncdenr.gov if you have any questions or concerns. Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: Kelly Roth, McAdams Co. (via email) DWR 401 & Buffer Permitting Branch electronic file DWR RRO 401/Riparian Buffer electronic file DocuSign Envelope ID: 94852658-CC1A-44CA-966A-6F8E0ADD0AC0