Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20050675 Ver 1_Staff Comments_20050617
S ccp� Blackburn Consulting Engineering 234 East Main Street Clayton,NC 27520 Phone: (919) 553-2900 Fax: (919) 553-7298 May 27, 2005 L9 k�5 � n U NCDENR—DWQ MAY 2 7 �pp� Parkview Building 2321 Crabtree Boulevard D sR-WAFERr ALIT WNtM Raleigh, NC 27604 Attn: Ms, Cyndi Karoly RE: DWQ Project# 05-0675 To Whom It May Concern: Enclosed is a new page from the proposed plans for Moss Creek Phase 3 and 4 and some calculations showing proposed level spreaders on the site. Also enclosed is the letter from NCEEP for acceptance of payment to their fund. Sincerely, J F.I Y ? Sean P. Hein, PLS yt 4� z F Q� ?� �414 cs� 12 kl 49-� IA-( � b � �� 5�r bb td ��,/- ,a pus a ?� J Cl)l mi m � O > 0 ch _ m — n O `'' Im � z z rn o °1 0 � z > 0 IN � l o, ! l N o to Imp, _ i I Z7 i Ali ', rn p, 0)co i D m � pl - cn rn DIi.Z�71 � I m I D <j cn a to I ICl) o m z h w w rnj j -I m I li o� m <� 00 N w O U D � Y E co I sy stem PROGRAM April 29, 2005 Sean Hein Blackburn Consulting Engineers 234 East Main Street Clayton, NC 27520 Project: Moss Creek Village County: Johnston The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program(NC EEP)is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NC EEP will be approved. This acceptance is valid for six months from the date of this letter. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame,this acceptance will expire. It is the applicant's responsibility to send copies of the 404/401/CAMA permits to NC EEP. Once NC EEP receives a copy of the 404 Permit and/or the 401 Certification an invoice will be issued and payment must be made. Based on the information supplied by you the impacts that will be mitigated are summarized in the following table. River Basin Wetlands Stream Buffer Buffer Cataloging (Acres) (Linear Feet) Zone 1 Zone 2 Unit (Sq.Ft.) (Sq. Ft.) Riparian Non-Riparian Coastal Marsh Cold Cool Warm Neuse 0 0.30 0 0 0 0 0 0 03020201 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation for the permitted impacts up to a 2:1 ratio, (buffers, Zone 1 at a 3:1 ratio and Zone 2 at a 1:1.5 ratio). The magnitude of the compensatory mitigation will be as specified in the Section 404 Permit and/or 401 Water Quality Certification, and/or CAMA Permit. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the U. S.Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information,please contact Carol Shaw at(919)733-5205. Sincerely, Willia . Gilmore,PE Director cc: Cyndi Karoly,Wetlands/401 Unit Kevin Yates, USACOE-Raleigh Eric Kulz, DWQ Regional Office-Raleigh File Rmtor' .. Protect' Oar fm& ©mi " "' NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1 652/91 9-71 5-0476/www.nceep.net