Loading...
HomeMy WebLinkAbout20050675 Ver 1_More Info Received_20050622JUN-24-05, 05:19 RN BLACKBURN CnNSI_ILTING ENG 91' 55= 7292 Blackburn Consulting Engineering 234 Fast Main Street Clayton, NC 27520 Phone: (919)553.2900 Fax: (919) 553-7298 June 22, 2005 alp n?.•`;'a T l1 1' R w' ,f?. li NCDENR - DWQ Parkview Building 2321 Crabtree Boulevard Raleigh, NC 27604 Attn: Mr. Sam Aghimien RP,: DWQ Project # 05-0675 Moss Creek Subdivision To Whom It May Concern: The impervious surfaces in the Moss Crcck Subdivision (total area = 44-31 ages) are as follows: I Phase i and 2 - area = 16.32 acres (Road and utility construction complete - house construction began) approximately 40% impervious at build out. Phase 3 and 4 - area = 19.02 acres (Future development) approximately 40% impervious at build out. Business phase - area - 8.9 of Cla ? 7 acres (under construction) limited by Town o yton to max of 70% impervious. vt? JUH-84-8005 FRI 14:47) P-01 ?yybgAAlt?t?, r, 6 ' Q S v Sean P. Hein, PLS ?' ?' x,•an'`su e?, R i?r,dy+M' r - i i i I '. TEL : 919 i 3.3589.3 ItIAME : DW -WETLAt--1DS P. 1