HomeMy WebLinkAbout820100_Plan of Action (POA)_20200620 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 6/20/2020 1. Structure Name/Identifier(ID): Thomas Giddens(82-100) 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches c. line b-line a(inches in red zone) = 2.0 inches d. top of dike surface area according to design 88256 ft2 e. line c/12 x line d x 7.48 gallons/fti 110026 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 118973 ft3 h. current herd# 3600 certified herd# 3600 actual waste produced = current herd# x line g = 118973 ft' certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 53666 ft3 k. (lines h + i+j)x 7.48 x 30 days/line f= 215223 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/18/2019 2.64 Ibs/1000 gal. m. ((lines e+k)/1000)x line I = 858.7 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Thomas Giddens(PoA30day)6-20-2020 Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY- 1. Structure ID: Thomas Giddens(82-100) line m = 858.7 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = n. = 1 +2 +3+4+5+6 858.7 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o.tract# p.field# q. crop r. acres s.remaining IRR-t.TOTAL PAN u.application window' 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 10301 new Bermuda Pasture 9.02 100.00 902.0 MAR-OCT 10300 1 Bermuda Hay 8.35 150.00 1252.5 MAR-OCT 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields (sum of column t)= 2154.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II)= 858.7 lb. PAN x. Crop's remaining PAN balance(line v from section III)= 2154.5 lb. PAN y. Overall PAN balance(w-x)= -1296 lb. PAN • SUMMARY Thomas Giddens(PoA30day)6-20-2020 Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: SUMMARY Thomas Giddens(PoA30day)6-20-2020 Page 2 of 2