Loading...
HomeMy WebLinkAbout20170149 Ver 3_DEQ Review Request_20201120November 6, 2020 Ms. Sue Homewood Division of Water Resources Winston Salem Regional Office DEQ 450 W. Hanes Mill Rd., Suite 300 Winston Salem, North Carolina 27105 Re: CONVEYANCE PERMIT APPLICATION RAW WATER INTAKE AND CONVEYANCE DUKE ENERGY MARSHALL STEAM STATION LAKE NORMAN, CATAWBA COUNTY, NC Dear Ms. Homewood, wood. Wood PLC 2801 Yorkmont Road Suite 100 Charlotte, North Carolina 28208 www.woodplc.com On behalf of Duke Energy at the Marshall Steam Station, Wood Environment & Infrastructure Solutions (Wood) respectively requests the review of a proposed project at Lake Norman in Catawba County, which is managed by Duke Energy Lake Services. As part of the Lake Services Conveyance Permit Application process, federal, state, regional and local agencies and organizations require notification for review and consultation. This package has been submitted to the USACE to request a modification to the permit at Marshall Plant, MAR-145. We are submitting this to DEQ to request modification to the Individual 401 Water Quality Certification WQC004172, under action number DWR-20170149 v2. The Conveyance Permit Application approval process will allow for a raw water intake and conveyance pipe to be installed within the Federal Energy Regulatory Commission (FERC) boundary of Lake Norman. Attached is an executive summary of this project for your review. Please provide written comments or concurrence with this such that this request can finalize the request for a Modification to an Army Corps of Engineers Individual Permit at the Marshall Plant for these activities. Agency comments will be forwarded to Lake Services as part of the Conveyance Permit Application. If you have any questions or require additional information, please do not hesitate to contact me at (215) 863-1639, or at ghazoll.motlagh@woodplc.com. Sincerely, Y/ Ghazoll Motlagh, PE, CFM Senior Water Resources Engineer Attachments: Executive Summary 'Wood' is a trading name for John Wood Group PLC and its subsidiaries September 10, 2020 Chad Broadway Lake Services Representative Duke Energy Lake Services 526 S. Church Street Charlotte, NC 28202 Re: STEP 1 — EXECUTIVE SUMMARY CONVEYANCE PERMIT APPLICATION RAW WATER INTAKE AND CONVEYANCE DUKE ENERGY MARSHALL STEAM STATION LAKE NORMAN, CATAWBA COUNTY, NC Dear Mr. Broadway, wood. Wood PLC 2801 Yorkmont Road Suite 100 Charlotte, North Carolina 28208 www.woodplc.com On behalf of Duke Energy at the Marshall Steam Station, Wood Environment & Infrastructure Solutions (Wood) intends to submit a Conveyance Permit Application for a less than 1 million gallons per day (MGD) Raw Water Intake at Lake Norman. For Step 1 of the application process , we are providing the executive summary below along with maps detailing the configuration and location of the proposed project. Executive Summary Duke Energy at the Marshall Steam Station is proposing to install a raw water intake, conveyance pipe, and airburst supply piping at the Marshall Steam Plant located at 8320 NC-150 in Sherrills Ford, Catawba County, North Carolina on Lake Norman. The proposed project is located on Duke Energy properties, with the surrounding shoreline classified as public infrastructures according to Duke Energy - Catawba- Wateree Federal Energy Regulatory Commission (FERC) Shoreline Management Plan (SMP). The 12-inch diameter high -density polyethylene water conveyance pipe and intake screens are part of the groundwater remediation program at the Marshall Steam Station. For additional detail of the project location and shoreline classification, please refer to attached Site Location and Catawba-Wateree Shoreline Classification Maps. The groundwater remediation program consists of groundwater extraction and clean water infiltration. The new intake is designed to accommodate the flows for the infiltration system as well as to provide water for dust suppression at the facility that will be necessary during additional remedial activities. The water for dust control will be used on haul roads, in ash removal activities, in soil borrow areas and in the landfill construction and operation activities. For the water used within the ash basin and landfill it ultimately, if not absorbed, would go to a NPDES permitted system. For other areas of the project there will not be any run-off from the dust control operation going offsite. NPDES permit NC0004987 is being modified to allow for groundwater that is being pumped from the extraction wells for remediation to be discharged to an on -site wastewater treatment system prior to discharging from NPDES permitted outfall 002. To eliminate surface (land and lakebed) disturbance and to facilitate the distance and depth of the intake screen array's targeted location in the Lake, the piping will be installed via horizontal directional drill (HDD). The HDD bore will require an excavated shallow "bore launch" pit roughly 8ft x 8ft x 4ft in which 'Wood' is a trading name for John Wood Group PLC and its subsidiaries • Duke Energy — Marshall Steam Station — Lake Norman Raw Water Intake Application to launch and control the borehead, resulting in approximately 10 cubic yard of excavation at the pit. The pit will be backfilled with approximately 10 cubic yard of NCDOT No. 57 stone to match surrounding and pre -construction lakebed slope and elevation. The water conveyance pipe and the two air supply pipes are approximately 284 linear feet long from the FERC Project Boundary elevation of 760 to the screen array with varying elevations as a function of the rounded installation of the pipe through the HDD method. The use of HDD allows the pipe to maintain the required cover of greater than 2 ft along the entire length of pipe, in compliance with the Catawba- Wateree SMP. In accordance with the requirements for submarine utility line in the Shoreline Management Guidelines, the pipe will be laid roughly 15 feet below the lakebed and will not require anchoring. There will be no fill added to the lakebed, in the form of pipe or anchoring. The short (approximately 8 feet) length of pipe that will be exposed at the screen will not require anchoring. The two redundant cylindrical passive wedge wire intake screens are each 16-inches in diameter and approximately 45-inches in length. The material of construction for the screens is a proprietary mussel -resistant alloy by the screen manufacturer, Johnson Screens (Agseptence Group), which is an NSF-61 certified for drinking water use. The mesh size is 2 millimeters, and the through - screen velocity for each screen at the total intake withdrawal design flow is 0.25 feet per second. As both screens will normally be in concurrent operation, the actual through -screen velocity will be approximately one-half the design velocity. The Duke boat ramp and docks located nearby are controlled by Duke Energy for operations. Boats will not be anchoring or used recreationally, nor interfering within the project boundary limits. To ensure boating safety in the vicinity of the project during and after construction activity, refer to Standard Operating Procedure Number ESFP-AD-0101 by Duke for safe boating. The Lake Norman Boat Safety Plan will be provided along with the conveyance application. The design daily total withdrawal for the proposed water intake and conveyance pipe from Lake Norman will not exceed 0.950 MGD, approximately 660 gallons per minute (GPM). The aggregate flow to the infiltration wells is estimated to be approximately 0.4 MGD at a rate of 285 GPM, with the remaining withdrawal being used for dust suppression activities associated with the ash basin closure. The proposed average annual water withdrawal rate is 347 million gallons per year (MGY), averaging 29 million gallons per month (MGM). Please refer to the attached Site Plan and Survey for an overview of the proposed activity, location, and project limits. Additional information will be provided in the subsequent permit application submission. If you have any questions or require additional information, please do not hesitate to contact me at (215) 863-1639, or at ghazoll.motlacih@woodplc.com. Sincerely, Wood Environment & Infrastructure Solutions, Inc. Ghazoll Motlagh, PE, CFM Senior Water Resources Engineer 'Wood' is a trading name for John Wood Group PLC and its subsidiaries 0 Duke Energy — Marshall Steam Station — Lake Norman Raw Water Intake Application Attachments: Site Location Map 2016 Catawba — Wateree Shoreline Classification Survey Site Plan Profile and Detail Sheets 'Wood' is a trading name for John Wood Group PLC and its subsidiaries • • • PROJECT LOCATION , sherm 261 MARSHALL STEAM STATION i`% " f{E- • RMA �f A. Y ` <0 1 z C t - _Co Miles �pyright:A 201,Mati.o al\5 g 4ph` %e y, i-eub�d CLIENT PROJECT PROJECT NO.: woo � DUKE WATER INTAKE AND CONVEYANCE 7779140003 REVISION NO.: LAKE NORMAN p 2801 Yorktown Road, Ste 100 Tel. 704-357-8600 ENERGY® TERRELL, NORTH CAROLINA DATE: Charlotte, NC 28208 www.woodplc.com 2020 PROJECTION / DATUM: PREPARED BY: TITLE FIGURE NO.: NC83F DNP CHECKED BY: GM SITE LOCATION MAP w 1 INCH:1 MILE REVIEWED BY: - I JSA Catawba-Wateree Shoreline Classification Public Infrastructure Residential - Future Residential Commercial Marina woo CLIENT If DUKE PROJECT DUKE ENERGY RAW WATER INTAKE AND CONVEYANCE PROJECT NO.: 7812200482 REVISION NO.: LAKE 0 2801 Yorkmont Road, Ste 100 Tel. 704357-8600 �, ENERGY® CA TERRELL, NORTHRTH CAROLINA DATE: Charlotte, NC 28208 www.woodplc.com 2020 PROJECTION / DATUM: PREPARED BY: TITLE FIGURE NO.: NC-83F DNP 2016 CATAWBA - WATEREE SHORELINE CLASSIFICATION 0 300' 600' CHECKED BY: GM REVIEWED BY: JSA SCALE: 1" = 600' N: 681,235.64 F• 1 Al R ?Q7 ?R NOTES: 1. COORDINATES ARE BASED ON HORIZONTAL DATUM: NORTH CAROLINA ' STATE PLANES, NORTH AMERICAN DATUM OF 1983 (NAD83). 2. THIS DRAWING IS THE PRODUCT OF MERGING TWO DIGITAL SURVEY FILES. THE LANDWARD TOPOGRAPHICAL SURVEY IS PART OF A LARGER - - - - LIDAR—BASED SURVEY OF THE MARSHALL STEAM STATION AND PROVIDED TO ARCADIS BY DUKE ENERGY. THE EXTENT OF THE LIDAR oooo SURVEY IS GENERALLY ALONG THE 760 CONTOUR. A BATHYMETRIC SURVEY OF THE ADJACENT AREA OF LAKE NORMAN WAS PERFORMED w s s s s BY WOOD ENVIRONMENTAL AND INFRASTRUCTURE SOLUTION, INC. IN JUNE 2020. USING THE SAME DATUM AND COORDINATE SYSTEM, THE DIGITAL FILES OF BOTH SURVEYS WERE ADJOINED TO CREATE THIS 0000o FIGURE. oomda 3. THE COORDINATES DEPICTED FOR PROPOSED INFRASTRUCTURE ARE FOR "101 THE PURPOSE OF THE CONVEYANCE PERMIT APPLICATION. COORDINATES ',, T'11 OF FUTURE AS —BUILT FEATURES MAY BE DIFFERENT THAN THOSE q6 o Q DEPICTED IN THIS FIGURE. 4. PROPOSED PROJECT INFRASTRUCTURE LANDWARD OF THE FERC soot PROJECT BOUNDARY IS NOT DEPICTED ON THIS FIGURE. X Or m � ■1w_1zanixim 25 0 25 50 SCALE: 1 " = 50' PROPOSED INTAKE N:681,100.98 E:1,418,370.50 PROPOSED PROJECT AREA = 0.2213 ACRES 'DUKE ENERGY CAROLINAS PROPOSED INTAKE N: 680,977.50 E:1, 418, 442.22 o/ 1 1 OWNER: DUKE ENERGY CAROLINAS LLC Poo PROPOSED PROJECT INFRASTRUCTURE LANDWARD OF THE FERC PROJECT BOUNDARY IS NOT DEPICTED ON THIS PLAN. N W K a W m Q LL 6] _ a p 02 100—FEET OFFSET FROM FERC PROJECT BOUNDARY/ FULL POND CONTOUR ELEVATION 760 1 1 PROPOSED INTAKE PIPE r4 AIRBURST SUPPLY PIPE ~ SEE PROFILES ON FIG 2 ~ - AND FIG 2 " 0 r" n ' ESTIMATED EASEMENT BOUNDARY APPROXIMATE EXTENT OF OUTER TURBIDITY CURTAIN. DEPTH OF CURTAIN TO LAKEBED. TYPE 1 CURTAIN. _ APPROXIMATE EXTENT OF INNER TURBIDITY CURTAIN, DEPTH OF CURTAIN TO LAKEBED. TYPE 3 CURTAIN. PROPOSED INTAK AIRBURST SUPPL N:681,100.98 E:1,418.370.50 — PROPOSED PROJECT AREA - 0.2213 ACRES E PIPE Y PIPE 1` PROPOSED INTAKE SCREENS (2) N: 860,977.50 E= 1.415,442,22 NOT FOR CONSTRUCTION 1e551O"a' `"g'"sets "a'"e DUKE ENERGY BUSINESS SERVICES, LLC - MARSHALL STEAM STATION • TERRELL, NORTH CAROLINA ARCADIS Project No. L>esign&Donsuttancy DYNAMIC GROUNDWATER RECIRCULATION PILOT SYSTEM DESIGN 77 SCALE(S) AS INDICATED professional Engineers No. ARCADIS forneturaland 0 10, 20' 40' 6uiltassets Date Date ]ByCkd SITE PLAN JULY2020 FIG 1 sage Date signed Project Mgr. ARCADIS G&M THIS BAR USE TO VERIFY 5420 WADE PARK BLVD REPRESENTS ONE I FIGURE No. Date Revisions ARCADIS G&M OF NORTH CAROLINA, SUITE 350 INCH ON THE REPRODUCTION THIS DRAWING IS THE PROPERTY OF THE ARCADIS ENTITY IDENTIFIED IN THE TITLE BLOCK Designed by Drawn by Checked by INC. RALEIGH, NC 27607 ORIGINAL DRAWING: SCALE AND MAY NOT BE REUSED OR ALTERED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF SAME I CIVIL TEL. 919.854.1282 ` 100 FEET 0 FSET FROM _ — — FERC PROJECT BOUNDARY IPING CONTINUESI UNDERGROUND TO BORE LAUNCH PIT i 11 SURFq�f FERC PROJECT BOUNDARY <gkFeFD SURFADF «..;.; CRITICAL RESERVOIR 384 FEET 100—YEAR FLOODI PLAIN INTAKE PIPEI(12" DIA HOD) 2—AIRBURST SUPPLY LINES (2" DIA HOD) 284 FEET \ PIPE LAUNCH PIT: EXCAVATED AT CONTF ACTOR'S OPTION FROM BARGE BASED EXCAVATOR;SUITABLE 705 MATERIAL, IF PRESEN . ANTICIPATED SIZE = 8'x8'x4' DEEP (SUBJECT TO ACTUAL CONDITIONS) 700 2 Wm —2+50 —2+00 —1+00 0+ 0 1+00 2+00 3+00 3+40 9 H D D INSTALLATION PROFILE CONSTRUCTION PHASE a LL x OPTION 1: (SHOWN), INTAKE PIPE (12") AND TWO AIRBURST SUPPLY LINES (2' EA.). " m— OPTION 2: OUTER CASING PIPE (16" OR 18") WITH INTAKE PIPE AND AIR LINES INSIDE WITH SPACERS. SCALE: HORIZ. 20'-0", VERT. 5'-0" e w a o NOT FOR CONSTRUCTION r XOFR'M D Professional Engineers Name DUKE ENERGY BUSINESS SERVICES, LLC - MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ARCADIS Project No. 0 5' 10' D�Bsign&Consultancy DYNAMIC GROUNDWATER RECIRCULATION PILOT SYSTEM DESIGN 77 Professional Engineer's No. Date Date IVrnaturatand ARCADIS j 0 10' 20' 3 40' 6uiltassets PROFILE (SHEET 1 OF 2) JULY2020 ^ L �_ FAG L state Date signed Project mg, ARCADIS G&M 5420 WADE PARK BLVD THIS BAR USE TO VERIFY Date Revisions By Ckd REPRESENTS ONE I FIGURE ARCADIS G&M OF NORTH CAROLINA, SUITE 350 THIS DRAWING IS THE PROPERTY OF THE ARCADIS ENTITY IDENTIFIED IN THE TITLE BLOCK Designed by Drawn by Checked by INCH ON THE REPRODUCTION INC. RALEIGH, NC 27607 ORIGINAL DRAWING: SCALE AND MAY NOT BE REUSED OR ALTERED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF SAME. CIVIL TEL. 919.854.1282 785 785 384 FEET t 780 780 \ 100 FEET 0 FSET FROM FERC PROJECT BOUNDARY 284 FEET 775 — — 775 770 \ ` v \ 770 765 \ 765 WARNING SURPq BUOY CE 760 ` \ FERC PROJECT BOUNDARY/ NORMAL POOL/ 100—YEAR FLOOD PLAIN 760 PIPING CONTINUES UNDERGROUND \ TO BORE LA NCH PIT gkeeep\URFgce 7ss 7ss 750 CRITICAL RESERVOIR ELEVATION`\ 750 \ 745 ` ` 745 740 \ 740 735 \ \\ 735 730 \\ 730 \ `\ 16' DIA. SCREEN 725 \ \ (TYP OF 2) 725 ` f8' EXPOSED `\ METAL PIPE ON LAKEBIED. SECTION INTAKE PIPE (12" DIA HDD) \ \� CONNECTIN G DRILL SECTION 2—AIRBURST SUPPLY LINES ( " DIA HDD) \ TO SCREE ARRAY 720 \\ 720 715 ` 715 710 / 710 705 705 BACKFILL ANY EXCAVATION WITH TO N GENER LDOTMATCH7 rn PRE— XISTING LAKEBED °I 700 CONT UR 700 w� —2+50 —2+00 —1+00 0+00 1+00 2+00 3+00 3+25 =max POST —CONSTRUCTION PROFILE Q LL n 6 = D. o SCALE: HORZ. 20'-0", VERT. 5'-0" NOT FOR CONSTRUCTION X 0�R.- 0 5' 10' Professional Engineers Name DUKE ENERGY BUSINESS SERVICES, LLC - MARSHALL STEAM STATION • TERRELL, NORTH CAROLINA ARCADIS Project No. D�esign&Consultancy DYNAMIC GROUNDWATER RECIRCULATION PILOT SYSTEM DESIGN 30043377 Professional Engineer's No. Date IVrnaturatand ARCADIS 0 10 20 40 huittassets ARCADIS G&M OF NORTH CAROLINA, PROFILE (2 OF 2) JULY2020 FIG 3 state Date signed Project Mgc ARCADIS G&M 5420 WADE PARK BLVD SUITE 350 THIS BAR USE TO VERIFY REPRESENTS ONE I FIGURE No. Date Revisions By Ckd THIS DRAWING IS THE PROPERTY OF THE ARCADIS ENTITY IDENTIFIED IN THE TITLE BLOCK AND MAY NOT BE REUSED OR ALTERED IN WHOLE OR IN PART WITHOUT THE Designed by ��-nby Checked by INCH ON THE REPRODUCTION ORIGINAL DRAWING: SCALE INC. CIVIL RALEIGH, NC 27607 EXPRESS WRITTEN PERMISSION OF SAME. TEL. 919.854.1282 WARNING BUOY FERC PROJECT BOUNDARY ELEVATION /NORMAL POOL/100—YEAR FLOOD L 760 ---- ------ =m= -------- ANCHORING AND CHAIN NOT SHOWN FOR CLARTY *DANGER 3" SILVER REFLECTIVE BAND m CRITICAL RESERVOIR ELEVATION Nw 2" ORANGE BAND 750------------------------------.————————————————————————————————————— — — — — —- 3 U o w F 3" BLACK LETTERS 0. MIX (TWO SIDES TYP.) a 16" APPR X. o0 D. o Lo t`i 16" DIA. SCREEN 16" DIA. SCREEN n x z w a iD EXPOSED PIPE MANIFOLD ABOVE LAKEBED TO BE FLANGED 12" STEEL OR DUCTILE IRON, CONNECTED TO 12" HDPE INTAKE PIPE. = r� w DANGER z x o LAKEBED n12" INTAKE PIPE ---- 713 — ---- — 2" AIRBURST SUPPLY PIPE (TYP OF 2) CONNECTED STEEL FRAMING SET ON LAKEBED SURFACE CONCRETE BALLAST TO INTAKE PUMP STATION 1/2" DIA. 316 SS ROD 1" ID MOORING RING 10' LF 3/8" SS CHAIN SCREEN ARRAY DETAIL - PROFILE LOOKING LANDWARD 1/2" ROUND TYPE 316 SS EYE N.T.S. EXAGGERATED VIEW. SCREEN MANIFOLD PIPING WILL BE SUPPORTED CONCRETE CAP OR BLOCK PARTIALLY BY AND WITHIN THE STONE BACKFILL TO PROVIDE STABILITY. Z d BURIED IN LAKEBED FLOOR i0 WARNING BUOY N.T.S. X LL v M NOT FOR CONSTRUCTION Professional Engineers Name DUKE ENERGY BUSINESS SERVICES, LLC - MARSHALL STEAM STATION • TERRELL, NORTH CAROLINA ARCADIS Project Nu. sign&Consultancy DYNAMIC GROUNDWATER RECIRCULATION PILOT SYSTEM DESIGN 30043377 Professional Engineers No. Date SCALE(S) AS INDICATED i0fnatUf818nf1 /aRCJaDIS t1UiIt855ET5 ARCADIS G&M OF NORTH CAROLINA, DETAILS JULY 2020 FIG 4 State Dale Signed Project Mgr. ARCADIS G&M 5420 WADE PARK BLVD SUITE 350 THIS BAR USE TO VERIFY REPRESENTS ONE I FIGURE No. Date Revisions By Ckd THIS DRAWING IS THE PROPERTYOF THE ARCADIS ENTITY IDENTIFIED IN THE TITLE BLOCK Designed by Drawn by Cracked by INCH ON THE REPRODUCTION INC.. LEIGH, NC 27607 ORIGINAL DRAWING: SCALE ALTERED IN WHOLE OR IN PART WITHOUT THE AND MAY NOT BE REUSED OR AL EXPRESS WRITTEN PERMISSION OF SAME. CIVIL TEL. 919.854.1282