Loading...
HomeMy WebLinkAboutNCC190943_NOT Closeout Documents_20201209North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: Harris Teeter Fuel #139 - Colours River basin: Neuse Person financially responsible: Harris Teeter Properties, LLC - Jacob Phares, Vice Project #: CRAVE-2019-037 President Address: 701 Crestdale Road, Matthews, NC 28105 1. Project Location: Waterscape Way, New Bern Pictures: No 2. Weather and soil conditions: sunny, hot, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one. Title: Inspection report: Sent Report Date given/sent: August 13, 2020 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released, remove 10. Comments: from active files. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: James Edwards Others present: No one. Date of inspection: August 06, 2020 Time arriving on site: 10:30 AM Time leaving site: 10:40 AM cc: