Loading...
HomeMy WebLinkAbout20091105 Ver 1_Site Plan_20100922OrZ-SAN CITY OF SANFORD, NORTH CAROLINA BIG BUFFALO WASTEWATER TREATMENT PLANT 12MGD EXPANSION US Army Corps of Engineers Section 404 Permit Application - Nationwide Permit No. 39 NCDENR Division of Water Quality 401 Water Quality Certification Application HAZEN AND SAWYER Environne -tal E;i ;cars a Scientisrs FT, , ?n? - t3 rc P, AS Y i,,;i VP NO! ,E F PAEI,' FOR CAMS I RU nOi'?l f Q)gp `R Fq C1TY C7F SA€N IF0HD h. 0 F 1 -?A 41'^ UN ND SAN,) It? u i n.i ! _fJ 1 r.11. , yp ,, TYP P, AS Y I,.;1'W NOI 9E FPAEID FOR CAMS IRUG W 'j yyaFaF C1TY C7 h. W, LN AND €??C?C1 Fq {! 0 F F1'--!'`. '_141'^ ' I I rr ? r .i?' I ? • ?. r! 1?1 n 'y h. ? i ,? In'?f'J? hU}. ?VI ? - .?. ?=1:'I ?V. '.. uJ w w z CLn-, ? ..... .l C] CJ Cl C7 CI ,J Y -ME SIDE .... .. F.I:.I.'' ? ?.Ti1? ij" err r ,_? ',??'a •? 15 i.?C;A• i . -.ri . i ?t'?_?'-, (;i,J it I % - y tP i r `AIN L""' CiiY 0 r SF;N FORD o? TR. u . ..... _ .............. . j Ic I - CITY O? SANFC;R, 1h ZLN X01) S ANM,R RIG HHHAP-) M r T!AICH I I EE w O ? I _ - .......... I ? I I AIYI,.;1j C.I ?1IFA?HI,'? 1 ?tiIHN iU.)I"l yyaFaF (( `q Fq CITY C7? A N F0HD h. 'R TT i LN ND it I I T ' 'I IJ' L I 16r ? I V N L-LI N A?. I I? i 4 s Ci ? III I r! A YI,,;1l FA AEI,' 1 ?ti?HN iU.)i"l yyaFaF (( `q Fq C.TY C7? €?F0HD ? N()i NA rr r .i' J r `I o1i'i rd_ I I I ? r jam- 1 ' U r u } mm t 140 CONSTRUCTOR OR LAND DISTURBANCE ACTIVITES MAY BEGIN UNTIL ALL EROSION CONTROL MEASURES HAVE BEEN INSTALLED IN LOCATIONS AS SHOWN ON THE CONTRACT DRAWINGS 2, CONTRACTOR REQUIRED TO MAINTAIN ALL CONSTRUCTION ACTIVITIES WITHIN UNITS OF DISTURBANCE AS SHOWN ON THE CONTRACT DRAWINGS. 3 ALL DISTURBED AREAS LEFT EXPOSED SHALL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED MTH TEMPORARY UZOUND COVER, SPACES, OR XTRUCTIMES SUFFICIENT TO RESTRAIN EARLIER, A. PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION SHALL BE PLANTED OR OTHERWISE PROVIDED 'WITHIN 21 DAYS FOLLOWING tOMPLITION OF CONSTRUCTION OR DEVELOPMENT, ON THAT PORTION OF THE TRACT (DISTURBER AREA) UPON WHICH FURTHER ACTIVE CONSTRUCTION WILL NOT BE TAKEN, 5- SILT FENCE SHALL BE CLEANED WHEN SEDIMENT VOLUME REACHES 1/2 OF TOTAL VOLUME OF MEASURE. 6- ALL CRDWCN CONTROL MEASURED SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND PERMANENT VEGETATION IS ESTABLISHED ON ALL DISTURBED AREAS- 7CONTRACTOR SHALL R£ VEGETATE DISTURBED AREAS IN ACCORDING TO THE REEDING SCHEDULE ON DRAWING 02 AND AS PER SPOCIRCATION 02910 - FINAL GRADING ANN LANDSCAPING. 8, THE CONTRACTOR SMALL PROVIDE ADDITIONAL STABILIZED OUTLETS FOR SILT FENCES (DETAIL 022724) WHEN SILT FENCES ARE LOCATED IN LOW LYING AREAS NOT ILLUSTRATED ON PLAN SHEETS, S. ALL PIPE WORK SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD CONSTRUCTION TECHNIQUES. ONLY THE LENGTH OF TRENCH III VA41CIA PIPE CAN BE INSTALLED IN ONE DAYS TIME SHALL BE OPEN AT ANY TIME, WITH SPOIL MATERIAL PLACED ON THE UPHILL SIDE OF THE TRENCH, PIPING SHALL BE CAPPED AT END OF EACH DAYS WORK TO PREVENT SEDIMENT FROM ENTERING, TRENN SHALL BE BACKFILLED AT END OF EACH DAYS WORK AND DISTURBED AREAS SEEDED Ord TEMPORARY SEEDING MEASURES IF APPROPRIATE, IRTHE CU41RACM IS TO ENSURE ANY DEWATDANG SHALL BE ROUTED THRU :SILT BAGS AND DISPOSED OF IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENTATION POLLUTION W41ROL ALF 11, CONTRACTOR SHALL ENSURE ANY TOXISTRUCRAN WASTE GENERATED AS A RESULT OF PROPOSED CONSTRUCITON SHALL BE DISPOSED OF IN A LANDFILL WTH ALL PERMITS REQUIRED BY THE DIVISION OF WASTE MANAGMENT, ALL WASTE GOLD SHALL BE STOCKPILED ON GTE AND COVERED UNDER THIS EROSION ADD SEDIMENT CONTROL PLAN, OR TAKEN OFF SITE TO A SOIL, DISPOSAL AREA WITH ALL APPLICATBLE STATE AND LOCAL PERMITS. DESIGNED 4N DRAWN ................... JPC NECKED RPOLI'E'UMS, —JAM—, m 0 0 100 YEAR FLOCOPLAIN, TYP (228,76 NGVD 29) GRIT COLLECTION EXIST SILT FENCE, TYP INFLUENT PUMP ',STATION 0227044 MODIFICATIONS GRIT HANDLIND CURB/YARD INLET MODIFICATIGNO SEDIMENT CONTROL, TYP OLD INFLUENT PUMP STATION MODIFICATIONS APPROXIMATE LIMITS OF DISTURBANCE, TYR SCREENINGS AREA SILT FENCE NTH MODIFICATIONS OUTLET CONTROL, TYP = FINE SCREENS SWILL '61 —F Tif TEMPORARY ROLLED DISTRIBUTRON BOX FROSION CONTROL MITI FIN(, TYP MODIFICATIONS = F72-ID141 ............... . ................... Mwul uu yiwWl CITY OF SANFORIluii D NORTH CAROLINA SLUDGE THICKENING BUILDING MODS AEROBIC DIGESTER I MODIFICATIONS AEROBIC DIGESTER 2 MODIFICATIONS SLUDGE STORAGE TANK 2 MODIFICATIONS FARALUEL TO PIEi. / NO EROSION StiALL BE A NOT RELEASED FOR CONSTRUCTION SITE WORK ChAL EROSION & SEDIMENTATION CONTROL — AREA 3 ELECTRICAL BUILDING 2 am NAIRK L NE SEE 026 i i _1 L-.......' ? , Jl 1 I - 1` I / i i 111A P, 'AS Y i,,;i VP i NO! ,E I FPAEID FOR CAMS IRUG nOi'?l C1TY C7FNFOC1 D SAN,,Y R I _,IOf EP ?Of _L - j _ _ 4 11 'S A i F 0 { , i -T I 1'-i Nit i Tr 'ITEFf, -C r,TE P_V, FILTRAMN GHA 8ER -- I K Tl', P _ "? ?, i -3.3 '--F . r • • 7 1VI i-I L- • PREI'AIN!'aY I?RA'JVIHG I Nr I -EAU ?'R CNti'?iRI:Cil01?J _- I CITY OF SANFORD M) A NOR ? L1 C;ARC)l 1NA EPIC; BUFFALO I "T : xr 1,I,i1 I„ I,- Mi C,L 4 1 F?f CI"1 Y C SANFORD r ?. r 1 a F ??a.'"' ? ra,Y f?c err n ?-- i?a `? ?5 i.?IC?.A• .1 ':?i i;' i ?t'?_?[" I''ii`J G TY CAF SANf=ORD N, P A F-, NA, I?R ?,w1F ?,r, 4 CI"1 Y 0 `;AFNF I? `? C ;:.'; i t-i A F-, NA lIR I r r _C r € T 3- 33 e i (ft 2 G TY CAF SANf=ORD ?? '? p! ky (?q {pSq {? pp (9 N, F.. E A ; A, J.%r iI ,!. lP I, I.I 111,0 ( - 1