Loading...
HomeMy WebLinkAbout820090_Plan of Action (POA)_20200304 PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION Facility Number: 0 f© County: , Facility Name: Certified Operator Name: �" 260Ic p Operator#: � ��� /, `Attach a copy of Lagoon Sludge Survey Form and volume worksheets Note: A certified Sludge Management Plan may be submitted in lieu of this POA. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 a. Lagoon Name/Identifier J b.Total Sludge Depth (ft) B c. Sludge Depth to be Removed for Compliance (ft) e d.Sludge Volume to be Removed (gallons) /41) ��� ( / e. Sludge PAN (lbs/1000 gal) N/g f. Liquid PAN (lbs/1000 gal) A(/1 g. PAN of Sludge(lbs) (d x e)/1000 N• /t Compliance Timeframes: If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results in an elevated waste analysis, a sludge managementplan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey. If the sludge level is non-compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in sludge levels, DWR may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.27. SPOA 9-15 2016 Page 1 of 3 NARRATIVE: Use this section to describe the method(s)that will be used to lower the sludge depth. If microbe use is planned, specify the product to be used. • I hereby certify that I have reviewed the information listed above and.included within the attached Plan of Action, and to the best of my knowledge and ability,the information is accurate and correct. I further certify and acknowledge that compliance with regard to sludge accumulation must be achieved within two years of the original sludge survey indicating non-compliance. Sludge Survey Date: /)-'2 Compliance Due Date: ( ' -/ el---At) a. Phone: 9to - 990-3 2--p,5 ( Facility Owner/Manager(print) c ' i) ,J lf-� Date: FacilityOwner/Manager(signature) NPDES Permitted Facilities State Permitted Facilities Return this form to: Return this form to: Animal Feeding Operations Program NC Division of Water Resources NC Division of Water Resources at the appropriate Regional Office 1636 Mail Service Center (see following page) Raleigh, NC 27699-1636 SPOA 9-15-2016 Page 2 of 3 Sludge Management/Operation Plan Sludge Management Guidance Lagoon evaluation data developed by NCSU and a review of lagoon management records of several lagoons showed that the treatment capability of the swine lagoons evaluated in NC was not significantly adversely affected by sludge accumulations of 50%or more of the planned treatment volume of the lagoon.Therefore it is felt that it is permissible to allow sludge accumulation into the planned treatment zone of properly monitored and managed lagoons provided that: • Nutrient values of the lagoon effluent are within the normal operating range. • There is no noticeable increase in lagoon odor. ✓ Nutrients land applied from the lagoon are properly accounted for in the application plan (WUP)with no excess application. o Stop-pump level is easily attained with no adverse deposition of sludge into temporary storage. Sludge Management Sludge in my lagoon will be managed by the following: o Adequately monitor to define sludge volume,location,and rate of accumulation by conducting an annual sludge survey. • Maintain a minimum 2.5 feet deep zone,free of sludge at the pump intake during irrigation. • Position the pump intake and manage the irrigation operation such that the material irrigated is not more concentrated than the nutrient analysis samples. • Sufficient monitoring to address concerns that nutrients are not over applied. o Other items as required by DWQ.