Loading...
HomeMy WebLinkAbout20201297 Ver 1_West Duncan Street Impact Map_20201208 t IN // \ \ \\ \\\%\ \ \TEMPORARY STREAM R N >Q v \ \%\\ \\; CHANNEL IMPACT Z \ \ \\\\ \\ ±19LF; 140SF - • / / , / / O L+ d \\\\\\;\ /� ' EXTENT OF PRIOR STREAM IMPACT / / / / V • F. p y \ `� ELEVATION: 128.4 / �/ / / 2 : :� C d \ \\\\ ` (PER FIELD VISIT W/NCDEQ) / / / Z W� TEMPORARY RIP RAP PAD ;__ - / / (8'X 8'X 12" MIN DIA.)_� _.�;.�° �`V� .: // / % / / / t �� v .►:•,pok laity, I / / / \v vA ..}►ltv .� w...o. 0�J SANDBAG ►:fit - -�� Wp;��,L�•� / / / / / mom COFFER DAM �� �y S.���'�:��'v �� / / / / ROAD SURFACE 0.0)Z ". _ itteoli�ftalr % / / 96"LOW vV �P� � � � e 0"°"� t / TEMPORARY FLEXIBLE HOSE HEIGHT AND LENGTH OF FLOW PIPE \ \ •-ittp_ire•SO SO SO SOeirk1' �;s / / BOTTOM OF PIPE SET �_.,, i RETAINING WALL VARIES ir.V ) / / irilr,r. ,, , \ ii. ^�f ~� ~� ~� ~� �� ^�' ^",,�,,'"' / 96"HIGH 12" BELOW LEVEL OF \ I /zYl !'�j•j•j•j•j•-`1 ,4 .14:1: ( I FLOW PIPE NATURAL STREAM BED z tee* r� r� r� r� .� .�' +„,/ / EXISTING GROUND I \ -..�i . 4..��.G.�G.��.�alv..o.U�I�+iU / r . . L,_ It3j �0.�0.�0.o0.t1,,2'1' / /z_: ,:b I133_MI f ���_�� �..• 134_ .tiVe'���� 135_ LEVEL MOF NATURAL �138I �J�,.0 y. 113 L 2'TALL CONCRETE SILL 3)------- \ �139 ___ _____ 9-- INSTALLED ON EACH (ELEV: 132.1) N \ END OF PIPE - \ \ (TOP ELEV:133.1) PIPE INVERT (ELEV: 131.1) WIN62 LF-(2)96" • - N \ i- 62 LF-(2)96" RCP @ 3.4% _ _ _ _cam,/ NOTE:CONCRETE SILLS TO BE w RCP @ 3.4% _ BOLTED/ANCHORED TO CONCRETE LU nilill _ - -- - - HEADWALL I- CULVERT CROSS SECTION (J') o a _ -- (NOT TO SCALE) Z Z Q WEST DUNCAN STREETalli \ U z 2 o 1- -\,-- aft ins \ NOTE: Z z Q / \ A TEMPORARY COFFER DAM IS TO BE INSTALLED ON THE UPSTREAM PORTION OF THE STREAM D J 0_ /a/ - - CHANNEL TO ALLOW FOR ROAD CROSSING AND CULVERT CONSTRUCTION.FLOW FROM EXISTING 0 \ STREAM SHALL BE PUMPED AROUND ROAD CROSSING DURING CONSTRUCTION ACTIVITIES SO / NEW PIPES MAY BE INSTALLED IN DRY CONDITIONS.SEDIMENT LADEN WATER WITHIN WORK I- AREA SHALL BE DISCHARGED VIA SILT BAG.UPON COMPLETION OF THE ROAD CROSSING,THE . . • • • . . 1111111LIMMIMMimumwCOFFER DAM WILL BE REMOVED AND THE STREAM WILL BE RESTORED TO ITS ORIGINAL LJJ III DIMENSIONS. - •• SANDBAG I l ` -- =1ao �_ COFFER DAM '- -' .. - - _ -------====== STREAM IMPACTS - ' _ _ / PROJECT NO: i �4% j%y I / / TYPE OF AREA SQ. FT. AC. LENGTH(LF) le..............=�� / i/ TEMPORARY 349 .008 41 r , i / , / / `/ . / , / / SCALE: 135 i 1U —i ._//\ ^ •, / ,// // / // 1"=20' \�N \ / TEMPORARY STREAM ,'N . . - EXTENT OF PRIOR STREAM IMPACT DATE: CHANNEL IMPACT FUND ` -� \\ I ELEVATION: 132.3 2020-12-02 ±22 LF;209 SF ^\\\\``yy \;{ I (PER FIELD VISIT W/NCDEQ) 20 0 10 20 40 r I \\1` ' \ \\11 I , / — � SHEET NO: SCALE:1"=20' E-1 J