Loading...
HomeMy WebLinkAbout820064_Sludge Survey (Testing Dates)_20191018 0 RECEIVED p DEQ!DWR ROY COOPER Governor , MICHAEL S.REGAN OCT 232019 Secretary LINDA CULPEPPER NORTH CAROLINA Director Environmental Quality WQROS OROS FAYETTEVILLEPEG(OWALOFFECE October 18, 2019 Timothy F Lindsay McGee Church Road Farm 2560 Five Bridge.Rd Clinton,NC 28328. Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS820064 McGee Church Road Farm Animal Waste Management System Sampson.County Dear Timothy F Lindsay: • The Division of Water Resources (Division)received your sludge survey information on September 20, 2019. With the survey results, you requested an extension of the sludge survey requirement for lagoon structure "1" at the McGee Church Road Farm facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until,December 31,2024. The next sludge survey for lagoon structure"1" at McGee Church Road Farm should be: performed before December 31,2024.Please retain this letter and keep it with your:farm records for reference. Please call me at(919) 707-3705 if you have any questions. Sincerely, . Heath C. Robinson' Animal Feeding Operations Program cc: . Fayetteville Regional_Office,SWater Quality Regional Operations Section Permit File AWS820064 North Carolina Department of Environmental Quality I Division of Water Resources D E Q 512 North Salisbury Street i 1636 Mall service Center I Raleigh,North Carolina 27699-1636 W.. Ospulneal a + s\ / 919.707.9000 ii • Sludge Survey Evaluation Form. Today's Date 10/18/2019 Facility# 820064 Owner: McGee Church Rd,LLC Lagoon:ID .. Sludge Survey.Received: - • 9/20/2019 Sludge Survey Performed: • 8/8/2019 Sludge Depth(Row 0):(ft) 4.1 Existing Treatment Depth(Row P): (ft) 6.60 Start Date: 1/1/1980 Facility age at time:of survey:(yr) • 40 Average Sludge Accumulation.(ft/yr): ., : 0:10 ; : Requested Extension: (yr) 5 Requested Due.Date. 2024 Sludge Accumulation during extension period: (ft): 0.52 Treatment Depth Available after Extension: (ft) 6:08 Sludge level OK? YES'- Ratio Estimates Based on Depth EXISTING:_ EXEMPTION Ratio of Sludge layer to total'trmt depth 0:38 0.43. ; Ratio of.Sludge depth OK? . . EXISTING EXEMPTION Average Sludge layer thickness(T) 41 4.62 Depth of the lagoon from top of bank to bottom soil surface(D) 14.3 14.3 Slope=Horizontal/vertical side slope(S) 2.5 2.5 Length at the top of inside bank(L) 620 620 Width at the top inside slope(W) _ 190 . 190 Thickness of existing liquid treatment zone(I') 6:60 6.08 Length at midpoint of sludge layer(Lm)=L-2S(D-(T/2)) • 558:75 560.04 Width at midpoint of sludge layer(Wm)=W-2S(D-(T/2)) 128.75 130.04 Volume of sludge(Vs)=Lm*Wm*T 294950.16 . 336278.76 Volume in.gallons.(Vsg)=Vs*7.481 2206522:12 2515365.16 Thickness of total treatment zone(Z)=T+Y 10.70 10.70 ' Length at midpoint of total treatment zone(Lz)=L-2(S)(D-(Z/2)) 575.25 575.25 Width at midpoint of total treatment zone(Wz)=W-2(S)(D-(Z/2)) 145.25 145.25 Volume of total.treatment zone(Vz)=Lz*Wz*Z - 894039.17 • :.894039.17 : Ratio(R)of sludge layer volume to total trmt volume . . 0.330 . . 0:376 Sludge Volume Ratio:OK? : :`YES Maximum extension until end of permit cycle Next survey to be done:(calendar yr)... 12/31/2024 Notification letter mailed:. 10/18/2019