Dan Harbaugh 6/17/2020
Tuckaseigee Water and Sewer Authority
1246 W Main St
Sylva, NC 28779
Subject: Request for Additional Information
Draft NPDES Permit NCO089532
TWSA WWTP #6
Jackson County
Dear Mr. Harbaugh:
The Division has received and reviewed the request for the renewal of the NPDES wastewater permit
for Tuckaseigee Water and Sewer Authority's TWSA WWTP #6 facility in Jackson County. The
previous version of this permit, issued on July 6, 2015, required approval of a new Authorization to
Construct and submittal of a signed engineering certificate before any discharge of wastewater.
Review of our records indicated that an ATC Permit was not applied for or issued during the term of
this permit.
According to 15A NCAC 02H .0 13 8 (a), for ATC permits the following is required:
(a) Required. After an NPDES permit has been issued by the Division of Environmental
Management in accordance with this Section, construction of wastewater treatment
facilities or additions thereto shall not begin until final plans and specifications have been
submitted to and an Authorization to Construct has been issued to the permittee by the
Division of Environmental Management. If an Authorization to Construct has not been
applied for in accordance with the requirements of the NPDES permit during the term of
the permit, the permit will be considered void upon expiration and future actions will be
considered as a new application.
Please submit an Authorization to Construct application for this facility to DWR before the
expiration of your permit on July 31, 2020.
Without an ATC Permit, this permit is considered void, and any application will be processed as a new
application. The term "New" is defined according to 15A NCAC 02H .0103 (16) as follows:
(16) "New", with respect to implementing the NPDES permitting program, means:
(a) Proposed facilities that do not have a NPDES Permit nor have any facilities constructed.
(b) Facilities which physically exist, however are illegally constructed, i.e., no required
agency approvals.
(c) Facilities which have received an NPDES Permit and have received an Authorization to
Construct but have not begun significant construction of any wastewater treatment facilities
within the term of the current permit.
Any increases in treatment plant hydraulic capacity, which has not received an
Authorization to Construct shall be considered new and new effluent limitations and other
requirements, if applicable, would be imposed for the entire facility.
D EQ�� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 276991617
o.P,ro,rem or e�W.a����a� ouzory 919.707.9000
DocuSign Envelope ID: E728BF75-9AA8-480C-8503-762205B9B703
In order to process this permit renewal application as a new permit application, the Division requires
an Engineering Alternatives Analysis (EAA). Given the many years passed since any alternatives to a
direct discharge have been evaluated for this facility, an updated EAA would be prudent. Economic
costs, best available technology, and availability of a connection to a POTW may have changed over
time.
The Division has reviewed your application and public comments for the draft permit. To enable us to
complete our review in accordance with N.C.G.S. 143-215.1 and 15A NCAC 2H .0105, please provide
additional or revised information to address the following comments:
Complete an Engineering Alternatives Analysis (EAA): The Division requires applicants to
fully document and exhaust all alternatives to surface water discharge [G.S. § 143 -215. 1 (b)(a)
and 15A NCAC 2H .0105 (c)(2)]. The EAA should include boring logs and/or other
information indicating that a subsurface system is neither feasible nor practical as well as
written confirmation indicating that connection to a POTW is not an option. For the non -
discharge alternatives, please demonstrate whether or not the physical size of the site is
prohibitive, and whether or not the resulting loading rate is prohibitive based on site specific
soil conditions. For your reference, the "Engineering Alternatives Analysis (EAA) Guidance
Document" is enclosed. Please complete and return Attachment A. Local Governments Review
Form (page 8). The EAA should also include a present value of costs analysis as outlined in the
Division's EAA guidance. Each alternative should be thoroughly evaluated and each
conclusion should be substantiated by appropriate documents and itemized budgets
demonstrating that alternatives are cost prohibitive.
If no response is received within 60 calendar days [per 15A NCAC 21-1.0107(b)], the project will be
deactivated and withdrawn from our review process. If you have any questions, please contact Emily
DelDuco at 919-707-9125 or email at emily.delducogncdenr.gov.
ec: NPDES Program Files
DWR/ARO
Sincerely,
DDocuSigned by:
83281344CHEMA1...
John E. Hennessy, Supervisor
Compliance & Expedited Permitting Unit
Division of Water Resources, NCDEQ