Loading...
HomeMy WebLinkAboutSW3201201_Report (Geotech)_20201208 ECS Southeast, LLP Report of Subsurface Exploration Union County Sheriff Expansion Monroe, Union County, North Carolina ECS Project Number 08:14031 March 11, 2020 Tufqifo!K/!Hfjhfs-! Q/F/!.!Opsui!Dbspmjob! 3131/14/22!23;46;2:! .15(11( Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page i TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................. 1 1.0 INTRODUCTION .................................................................................................................. 2 1.1 GENERAL ................................................................................................................................. 2 1.2 SCOPE OF SERVICES ................................................................................................................ 2 2.0 PROJECT INFORMATION ..................................................................................................... 3 2.1 PROJECT LOCATION ................................................................................................................ 3 2.2 PAST SITE HISTORY/USES AND CURRENT SITE CONDITIONS ................................................. 3 2.3 PROPOSED CONSTRUCTION ................................................................................................... 3 3.0 FIELD EXPLORATION ........................................................................................................... 4 3.1 FIELD EXPLORATION PROGRAM ............................................................................................. 4 3.2 REGIONAL/SITE GEOLOGY ...................................................................................................... 4 3.3 SUBSURFACE CHARACTERIZATION ......................................................................................... 5 3.4 GROUNDWATER OBSERVATIONS ........................................................................................... 5 4.0 LABORATORY SERVICES ...................................................................................................... 6 4.1 LABORATORY TESTING ........................................................................................................... 6 5.0 DESIGN RECOMMENDATIONS ............................................................................................. 7 5.1 BUILDING DESIGN ................................................................................................................... 7 5.1.1 Foundations .................................................................................................................. 7 5.1.2 Floor Slabs ..................................................................................................................... 7 5.1.3 Seismic Design Considerations ..................................................................................... 8 5.2 SITE DESIGN CONSIDERATIONS .............................................................................................. 9 5.2.1 Cut and Fill Slopes ......................................................................................................... 9 5.2.2 Pavement Considerations ............................................................................................. 9 6.0 SITE CONSTRUCTION RECOMMENDATIONS ....................................................................... 11 6.1 SUBGRADE PREPARATION .................................................................................................... 11 6.1.1 Stripping and Grubbing ............................................................................................... 11 6.1.2 Proofrolling ................................................................................................................. 11 6.1.3 Subgrade Stabilization ................................................................................................ 11 6.2 EARTHWORK OPERATIONS .................................................................................................. 11 6.2.1 Moisture Sensitive Soils .............................................................................................. 11 6.2.2 Below Grade Excavation ............................................................................................. 12 6.2.3 Lower-Consistency/Weak Soils ................................................................................... 13 6.2.4 Structural Fill Materials............................................................................................... 13 6.2.5 Compaction ................................................................................................................. 13 6.3 FOUNDATIONS ..................................................................................................................... 15 6.4 UTILITY INSTALLATIONS ....................................................................................................... 15 6.5 GENERAL CONSTRUCTION CONSIDERATIONS ...................................................................... 16 7.0 CLOSING ........................................................................................................................... 17 Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page ii APPENDICES Appendix A Drawings & Reports Site Location Diagram Boring Location Diagram Boring Log Summary Profiles A & B Appendix B Field Operations Reference Notes for Boring Logs Boring Logs B-1 through B-15 Appendix C Laboratory Testing Laboratory Testing Summary Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 1 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering evaluation for the proposed expansion located at 3344 Presson Road in Monroe, Union County, North Carolina. Based on our review of the provided site plan, we understand that the site will include the construction of a new 61,000 Square Feet (SF) facility with associated parking/drive areas. The subsurface conditions disclosed by the borings generally consisted of surficial materials, consisting of topsoil underlain by residual soils and Partially Weathered Rock (PWR) to the explored depths of the borings. o Surficial organic laden topsoil was encountered at each boring location with an approximate thickness ranging from 1 to 3 inches. o Residual soils typically consist of Elastic SILT (MH), Fat CLAY (CH), Sandy CLAY (CL), Silty SAND (SM), and Sandy SILT (ML) and extend to depths ranging from approximately 5 to 25 feet below existing grades. o Partially Weathered Rock (PWR) was encountered at each boring location at depths ranging from approximately 3 to 24 feet below existing grade. Auger refusal materials were encountered at boring locations B-1, B-3, and B-6 at depths ranging from approximately 18.7 to 19.7 feet below existing grades. Depending upon the actual project grading requirements, difficult excavation may be encountered during construction. ECS recommends an additional subsurface exploration that includes test pit observations to further evaluate the rippability of the subgrade materials, particular within cut areas, if planned. Moisture sensitive (MH and CH) soils were encountered at Borings B-1, B-3, B-4, B-6, B-7, B-9 through B-12, and B-14 and extended to depths ranging from approximately 3 to 8 feet below existing grades. MH soils with Plasticity Index (PI) greater than 30 and CH soils should not be used for direct support of project slabs-on-grade, foundations, or pavements. The on-site moisture sensitive soils are considered unsuitable to marginally suitable for direct support of structures, slabs, and pavements. Expansion index testing on the onsite MH and CH soils to further evaluate the shrink/swell potential of these soils is recommended. Based on the results of the subsurface exploration, the proposed structure can be supported on conventional shallow foundations bearing on low plasticity residual soils or new Structural Fill. An allowable bearing pressure of 2,500 psf is recommended provided the site and foundation subgrade preparation sections of this report are followed. Concrete slabs-on-grade supported by approved residual soils or properly prepared engineered fills can be designed using a modulus of subgrade reaction of 90 pounds per cubic inch (pci). C Specific information regarding the subsurface exploration procedures, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report but shou constitute our findings, conclusions, and recommendations in their entirety. Furthermore, ECS should review our findings and recommendations in their entirety once the final project criteria have been established. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 2 1.0 INTRODUCTION 1.1 GENERAL The purpose of this exploration was to explore the general subsurface conditions at the site and to evaluate those conditions with regard to foundation and slab support, along with general site development. Based on our review of the provided site plan, we understand that the site will include the construction of a new 61,000 Square Feet (SF) facility with associated paved parking/drive areas located at 3344 Presson Road in Monroe, Union County, North Carolina. The recommendations developed for this report are based on project information provided by the Client. This report contains the results of our subsurface exploration, site characterization, and engineering analyses for the proposed construction. 1.2 SCOPE OF SERVICES As requested, ECS performed fifteen (15) soil test borings at locations across the site. A laboratory- testing program was also implemented to help characterize the physical and engineering properties of the subsurface soils. This report discusses our exploratory and testing procedures, presents our findings and evaluations, and includes the following: Information on site conditions including geologic information and special site features. Description of the field exploration and laboratory tests performed. Final logs of the soil borings and records of the field exploration and laboratory tests. Measurement of the surface materials at each boring location and notation of this information on the boring logs and in the text of the report. Recommendations regarding foundation options for the structure and settlement potential. Recommendations regarding slab-on-grade construction and design. Seismic site class based on the average N-method. Geotechnical recommendations with regard to pavement support. Evaluation of the on-site soil characteristics encountered in the soil borings with regards reuse as Structural Fill to support ground slabs and pavements. Recommendations for minimum soil cover during frost heaving, compaction requirements for fill and backfill areas, and slab-on-grade construction. Recommendations regarding site preparation and construction observations and testing. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 3 2.0 PROJECT INFORMATION 2.1 PROJECT LOCATION The project site is at 3344 Presson Road in Monroe, Union County, North Carolina, as shown in figure 2.1.1 below, and included in Appendix A. Figure 2.1.1 Site Location 2.2 PAST SITE HISTORY/USES AND CURRENT SITE CONDITIONS Based on our review of Google Earth historical imagery, mass grading for the existing construction appears to have started in 1993 and has remained developed since that time. The previous use discussion is not considered a comprehensive or in-depth review of the site history, rather a quick overview of available aerial imagery. 2.3 PROPOSED CONSTRUCTION Based on our review of the provided site plan, we understand that the site will include the construction of a new 61,000 SF facility with paved associated parking/drive areas. Final grading information was not provided. The following information explains our understanding of the structure and their loads: Table 2.3.1 Design Assumptions SUBJECT DESIGN INFORMATION / ASSUMPTIONS # of Stories Single story Usage Sheriff Office Facility Framing Wood or steel Column Loads 100 kips (maximum) Wall Loads 4 kips per linear foot Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 4 3.0 FIELD EXPLORATION 3.1 FIELD EXPLORATION PROGRAM The field exploration was planned with the objective of characterizing the project site in general geotechnical and geological terms and to evaluate subsequent field and laboratory data to assist in the determination of geotechnical recommendations. 3.1.1 Test Borings The subsurface conditions were explored by drilling fifteen (15) soil test borings across the site. A track-mounted SIMCO 2400 drill rig was utilized to drill the soil test borings. Borings were generally advanced to a depths ranging from approximately 9 to 25 feet below the current ground surface. Boring locations were identified in the field by ECS personnel using handheld GPS technology and existing landmarks as reference prior to mobilization of our drilling equipment. The approximate as- drilled boring locations are shown on the Boring Location Diagram in Appendix A. Ground surface elevations noted on our boring logs were interpolated from Client provided topographic information and should be considered approximate. Standard penetration tests (SPTs) were conducted in the borings at regular intervals in general accordance with ASTM D 1586. Small representative samples were obtained during these tests and were used to classify the soils encountered. The standard penetration resistances obtained provide a general indication of soil shear strength and compressibility. 3.2 REGIONAL/SITE GEOLOGY The site is located in the Piedmont Physiographic Province of North Carolina. The native soils in the Piedmont Province consist mainly of residuum with underlying saprolites weathered from the parent bedrock, which can be found in both weathered and unweathered states. Although the surficial materials normally retain the structure of the original parent bedrock, they typically have a much lower density and exhibit strengths and other engineering properties typical of soil. In a mature weathering profile of the Piedmont Province, the soils are generally found to be finer grained at the surface where more extensive weathering has occurred. The particle size of the soils generally becomes more granular with increasing depth and gradually changes first to weathered and finally to unweathered parent bedrock. The mineral composition of the parent rock and the environment in which weathering occurs largely control the resulting soil's engineering characteristics. The residual soils are the product of the weathering of the parent bedrock. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 5 3.3 SUBSURFACE CHARACTERIZATION The following sections provide generalized characterizations of the soil strata encountered during our subsurface exploration. For subsurface information at a specific location, refer to the Boring Logs in Appendix B. Table 3.3.1 Subsurface Stratigraphy Approximate Ranges of (1) Depth Range Stratum Description SPT N-values (ft) (bpf) Varying amounts of surficial topsoil were 0.1 to 0.3 N/A reported by the driller at each boring N/A (2) location. RESIDUAL Elastic SILT (MH), Fat CLAY (CH), 3 to 25 I Sandy CLAY (CL), Silty SAND (SM), and Sandy 3 to 88 SILT (ML). PARTIALLY WEATHERED ROCK sampled as II 3 to 24 100+ (3)(4) Silty SAND (SM) and Sandy SILT (ML). Notes: (1) Standard Penetration Test ( removal takeoffs. (3) Partially Weathered Rock (PWR) was encountered at each boring location at varying depths. (4) PWR is defined as residual material exhibiting SPT N-values greater than 100 bpf. 3.4 GROUNDWATER OBSERVATIONS Groundwater measurements were attempted at the termination of drilling at the time of our exploration. Groundwater was not encountered within the borings at the time of drilling within the explored depth of the boring. Borehole cave-in depths were measured at each boring location at depths ranging from approximately 6.1 to 21.4 feet below the existing ground surface. Cave-in of a soil test boring can be caused by groundwater hydrostatic pressure, weak soil layers, and/or drilling activities. Fluctuations in the groundwater elevation should be expected depending on precipitation, run-off, utility leaks, and other factors not evident at the time of our evaluation. Normally, highest groundwater levels occur in late winter and spring and the lowest levels occur in late summer and fall. Depending on time of construction, groundwater may be encountered at shallower depths and locations not explored during this study. If encountered during construction, engineering personnel from our office should be notified immediately. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 6 4.0 LABORATORY SERVICES The laboratory testing performed by ECS for this project consisted of selected tests performed on samples obtained during our field exploration operations. The following paragraphs briefly discuss the results of the completed laboratory testing program. Classification and index property tests were performed on representative soil samples obtained from the test borings in order to aid in classifying soils according to the Unified Soil Classification System (USCS) and to quantify and correlate engineering properties. A geotechnical staff professional visually classified each soil sample from the test borings on the basis of texture and plasticity in accordance with the USCS and ASTM D2488 (Description and Identification of Soils-Visual/Manual Procedures). After classification, the staff professional then grouped the various soil types into the major zones noted on the boring logs in Appendix B. The group symbols for each soil type are indicated in parentheses following the soil descriptions on the boring logs. The stratification lines designating the interfaces between earth materials on the boring logs are approximate; in situ, the transitions may be gradual. 4.1 LABORATORY TESTING In addition to visual classification, ECS performed four (4) natural moisture content tests and two (2) Atterberg limits tests on selected soil samples obtained from within the borings. The natural moisture content was obtained in general accordance with ASTM D2216. Atterberg limits tests were performed to determine the liquid and plastic limits of the sample in general accordance with ASTM D4318. The results of the laboratory testing are presented on the respective Boring Logs in Appendix B and are summarized in Appendix C. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 7 5.0 DESIGN RECOMMENDATIONS 5.1 BUILDING DESIGN The following sections provide recommendations for foundation design, soil supported slabs, and seismic design parameters. 5.1.1 Foundations Provided subgrades and Structural Fills are prepared as discussed herein, the proposed structure can be supported by conventional shallow foundations. The design of the foundation shall utilize the following parameters: Table 5.1.1.1 Foundation Design Design Parameter Column Footing Wall Footing (1) Net Allowable Bearing Pressure 2,500 psf Low Plasticity Residual Soils (2) Acceptable Bearing Soil MaterialOr Newly-Placed Structural Fill Minimum Width 24 inches 18 inches Minimum Footing Embedment Depth 18 inches 18 inches (below slab or finished grade) Estimated Total Settlement 1 inch or less 1 inch or less ½ inch or less between ½ inch or less over 50 Estimated Differential Settlement columns feet (1) Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation. Provided the recommendations outlined herein are implemented, the proposed structures can be supported on shallow foundations bearing on low plasticity residual soils or approved Structural Fill. Bearing pressures in excess of the recommended design value are available where PWR is encountered at or near the final foundation bearing elevation. However, the risk of intolerable total and differential settlement would be increased for higher bearing pressures as the result of variable subsurface (e.g. abrupt transitions form soil to PWR) condition throughout the planned building area. MH soils (with a PI > 30) and CH soils should not be used for direct support of foundations and floor slabs. If unsuitable soils such as high plasticity soils (MH soils with a Plasticity Index greater than 30 and CH soils) are observed at the footing bearing elevations at the time of construction, the unsuitable soils should be undercut and removed a minimum of 2 feet below bottom of footing. 1,000 psi at 28 days), Structural Fill, or compacted crushed aggregate up to the original design bottom of footing elevation. 5.1.2 Floor Slabs On-site low plasticity residual soils and newly-placed Structural Fill are considered suitable for support of the floor slabs, although moisture control during earthwork operations, including the use of discing or appropriate drying equipment, may be necessary. Depending on the design subgrade Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 8 elevations, there may be areas of high plasticity, soft, or yielding soils that should be removed and replaced with compacted Structural Fill in accordance with the recommendations included in this report. The following graphic depicts our soil-supported slab recommendations: Vapor Barrier Concrete Slab Granular Capillary Break/Drainage Layer Compacted Subgrade Figure 5.1.2.1 1. Drainage Layer Thickness: 4 inches 2. Drainage Layer Material: GRAVEL (GP, GW), SAND (SP, SW) 3. Subgrade compacted to 100% maximum dry density per ASTM D698 Subgrade Modulus: Provided the placement of Structural Fill and Granular Drainage Layer per the recommendations discussed herein, the slab may be designed assuming a modulus of subgrade reaction, k of 90 pci (lbs/cu. inch). The modulus of subgrade reaction value is based on a 1 foot by 1 1 foot plate load test basis. Slab Isolation: Ground-supported slabs should be isolated from the foundations and foundation- supported elements of the structure so that differential movement between the foundations and slab will not induce excessive shear and bending stresses in the floor slab. Where the structural configuration prevents the use of a free-floating slab, the slab should be designed with suitable reinforcement and load transfer devices to preclude overstressing of the slab. 5.1.3 Seismic Design Considerations Seismic Site Classification: The North Carolina Building Code (NCBC) requires site classification for seismic design based on the upper 100 feet of a soil profile. Three methods are utilized in classifying sites, namely the shear wave velocity (v) method; the undrained shear strength (s) method; and su the Standard Penetration Resistance (SPT N-value) method. The SPT N-value method was used in classifying this site. Based on the SPT N-values obtained within the drilled depth of borings, a seismic Site C C appropriate for this project͵ The seismic site class definitions for the weighted average of SPT N-value in the upper 100 feet of the soil profile are shown in the following table: Table 5.1.3.1: Seismic Site Classification Site Class Soil Profile Name SPT Resistance, N-bar Not Applicable A Hard Rock Not Applicable B Rock N-bar > 50 C Very dense soil and soft rock - D Stiff Soil Profile N-bar < 15 E Soft Soil Profile Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 9 5.2 SITE DESIGN CONSIDERATIONS 5.2.1 Cut and Fill Slopes ECS does not anticipate cut or fill slopes greater than 5 feet in height. We recommend that permanent cut slopes with less than 5 feet crest height through undisturbed residual soils be constructed at 2:1 (horizontal: vertical) or flatter. Permanent fill slopes less than 5 feet tall may be constructed using Structural Fill at a slope of 2.5:1 or flatter. However, a slope of 3:1 or flatter may be desirable to permit establishment of vegetation, safe mowing, and maintenance. The surface of cut and fill slopes should be adequately compacted. Permanent slopes should be protected using vegetation or other appropriate means to prevent erosion. The outside face of building foundations and the edges of pavements placed near slopes should be located an appropriate distance from the slope. Buildings or pavements placed at the top of fill slopes should be placed a distance equal to at least ½ of the height of the slope behind the crest of the slope. Buildings or pavements near the bottom of a slope should be located at least of the height of the slope from the toe of the slope. Slopes with structures located closer than these limits or slopes taller than the height indicated should be specifically evaluated by the geotechnical engineer and may require approval from the building code official. Temporary slopes in confined or open excavations should perform satisfactorily at inclinations of 2:1. Excavations should conform to applicable OSHA regulations. Appropriately sized ditches should run above and parallel to the crest of permanent slopes to divert surface runoff away from the slope face. To aid in obtaining proper compaction on the slope face, the fill slopes should be overbuilt with properly compacted Structural Fill and then excavated back to the proposed grades. 5.2.2 Pavement Considerations Undisturbed low-plasticity residual soils or newly placed Structural Fill can provide adequate support for pavement structures and walkways designed for appropriate subgrade strength and traffic characteristics. ECS does not recommend supporting pavements on the existing high plasticity soils. The existing high plasticity soils should be removed to a depth of 2 feet from below pavement areas and replaced with compacted Structural Fill. The Owner may consider supporting pavements on the high plasticity soils provided the risks associated with poor pavement performance and increased maintenance are acceptable. Undercutting of high plasticity (MH with a PI>30 and CH) soils should be anticipated. Based on the soil types encountered in the soil test borings, we recommend a CBR value of 4 be used in design of the project pavements. For the design and construction of pavements, the subgrades should be prepared in accordance with the recommendations in of this report. We emphasize that good base course drainage is essential for successful pavement performance. Water buildup in the base course may result in premature pavement failures. The subgrade and pavement should be graded to provide positive runoff to either the outer limits of the paved area or to catch basins so that standing water will not accumulate on the subgrade or pavement. The pavement at locations for refuse dumpsters should be properly designed for the high axial loads and twisting movements of the trucks. Consideration should be given to the use of concrete pavement for the dumpster and approach areas. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 10 At locations where delivery trucks will be turning and maneuvering, the flexible pavement section should be designed to resist the anticipated shear stress on the pavement throughout the required pavement service life. When the traffic volumes, wheel loading conditions, and service life have been determined by the Client, ECS can perform pavement design recommendations for flexible and rigid pavements for an additional fee. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 11 6.0 SITE CONSTRUCTION RECOMMENDATIONS 6.1 SUBGRADE PREPARATION 6.1.1 Stripping and Grubbing The subgrade preparation should consist of stripping vegetation, rootmat, topsoil, remnants of previous construction, and other soft or unsuitable materials from the 10-foot expanded buildings and 5-foot expanded pavement limits and to 5 feet beyond the toe of Structural Fills. ECS should be called on to observe that topsoil and unsuitable surficial materials have been completely removed prior to the placement of Structural Fill or construction of structures. 6.1.2 Proofrolling After removing unsuitable surface materials, cutting to the proposed grade, and prior to the placement of Structural Fill or other construction materials, the exposed subgrade should be examined by ECS. The exposed subgrade should be thoroughly proofrolled with appropriate construction equipment having a minimum axle load of 10 tons (e.g. fully loaded tandem-axle dump truck). The areas subject to proofrolling should be traversed by the equipment in two perpendicular (orthogonal) directions with overlapping passes of the vehicle under the observation of ECS. This procedure is intended to assist in identifying any localized yielding materials. In the event that prior to the placement of any subsequent Structural Fill or other construction materials. Methods of repair of unstable subgrade, such as undercutting or moisture conditioning or chemical stabilization, should be discussed with ECS to determine the appropriate procedure with regard to the conditions causing the instability. Test Pits may be excavated to explore the shallow subsurface materials in the area of the instability to help determine the cause of the observed unstable materials and to assist in the evaluation of the appropriate remedial action. 6.1.3 Subgrade Stabilization Subgrade Benching: Fill should not be placed on ground with a slope steeper than 5H:1V, unless the fill is confined by an opposing slope. Otherwise, where steeper slopes exist, the ground should be benched so as to allow for fill placement on a horizontal surface. Subgrade Stabilization: Is some areas of the site, undercutting of unsuitable materials may be considered inefficient. In such areas the use of a reinforcing geotextile or geogrid might be employed, under the advisement of ECS. Suitable stabilization materials may include medium duty woven geotextile fabrics or biaxial geogrids. The suitability and employment of reinforcing or stabilization products should be determined in the field by ECS personnel, in accordance with project specifications. 6.2 EARTHWORK OPERATIONS 6.2.1 Moisture Sensitive Soils Cut Areas: Moisture sensitive soils encountered at the site are those soil materials classified as Elastic SILT (MH) and Fat CLAY (CH). Moisture sensitive (MH with a PI>30 and CH) soils were encountered in Borings B-1, B-3, B-4, B-6, B-7, B-9 through B-12, and B-14 and extended to depths ranging from approximately 3 to 8 feet below existing grades. MH soils with Plasticity Index (PI) greater than 30 and CH soils should not be used for direct support of project slabs-on-grade, foundations, or pavements. MH soils with a PI greater than 30 and CH soils encountered within proposed structural areas should be undercut and replaced with low Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 12 plasticity Structural Fill to a minimum depth of 2 feet below subgrade elevations in slab, foundation, and pavement areas. Based on the limited laboratory testing performed, the on-site moisture sensitive soils are considered unsuitable to marginally suitable for direct support of structures, slabs, and pavements. Expansion index testing on the onsite MH and CH soils to further evaluate the shrink/swell potential of these soils may be warranted depending on the design subgrade elevations. Alternatively, cement or lime stabilization could be considered for moisture sensitive soils in lieu of undercutting. Fill Areas: High plasticity soils do not satisfy the specification criteria for satisfactory Structural Fill materials. Given the presence of high plasticity soils on this site, and to reduce the amount of import material to the site, the Owner can consider allowing soils with a maximum Liquid Limit of 65 and maximum Plasticity Index of 30 to be used as Structural Fill at depths greater than 2 feet below pavement subgrades outside the expanded building limits or within non-structural areas. 6.2.2 Below Grade Excavation Partially Weathered Rock (PWR) materials were encountered at each boring location at depths ranging from approximately 3 to 24 feet below existing grade. Based on the results of the soil test borings, it appears that difficult excavation will be encountered during construction. Depending on the foundation elevations, and planned utility depths, difficult excavation into PWR and or auger refusal materials may be encountered. PWR and Auger Refusal depths should be taken into consideration by the site civil designer when developing foundation, storm drainage, and utility plans. ECS recommends an additional subsurface exploration that includes test pit observations to further evaluate the excavation characteristics of the subgrade materials within cut areas. In mass excavation for general site work, dense soils and PWR can usually be removed by ripping with a single-tooth ripper attached to a large crawler tractor or by breaking it out with large front- end loader. In confined excavations such as foundations, utility trenches, etc., removal of PWR may require use of heavy duty backhoes, pneumatic spades, or blasting. As a general guide, we recommend the following definitions be used to define rock: General Excavation Rip Rock: Material that cannot be removed by scrapers, loaders, pans, dozers, or graders; and requires the use of a single-tooth ripper mounted on a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds. Blast Rock: Material which cannot be excavated with a single-tooth ripper mounted on a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8 or equivalent) or by a Caterpillar 977 frontend loader or equivalent; and occupying an original volume of at least one (1) cubic yard. Trench Excavation Blast Rock: Material which cannot be excavated with a backhoe having a bucket curling force rated at not less than 25,700 pounds (Caterpillar Model 225 or equivalent), and occupying an original volume of at least one-half (1/2) cubic yard. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 13 As noted in the Geology section of this report, the weathering process in the Piedmont can be erratic and significant variations of the depths of the more dense materials can occur in relatively short distances. In some cases, isolated boulders or thin rock seams may be present in the soil matrix. 6.2.3 Lower-Consistency/Weak Soils Lower-consistency weak soils (N-Values of 6 or less) were encountered at Borings B-1, B-4, and B-6, B-7, B-11, B-14, and B-15. Depending on final site grades and building pad elevations, undercutting and re-compaction/reworking of soils in these areas should be anticipated to properly prepare subgrade soils prior to Structural Fill placement and/or direct support of new construction. 6.2.4 Structural Fill Materials Product Submittals: Prior to placement of Structural Fill, representative bulk samples (about 50 pounds) of on-site and off-site borrow should be submitted to ECS for laboratory testing, which will include Atterberg limits, natural moisture content, grain-size distribution, and moisture-density relationships for compaction. Import materials should be tested prior to being hauled to the site to determine if they meet project specifications. Satisfactory Structural Fill Materials: Materials satisfactory for use as Structural Fill should consist of inorganic soils classified as CL, ML, SM, SC, SW, SP, GM and GC, or a combination of these group symbols, per ASTM D 2487. The materials should be free of organic matter, debris, and should contain no particle sizes greater than 4 inches in the largest dimension. Open graded materials, such as Gravels (GW and GP), which contain void space in their mass should not be used in Structural Fills unless properly encapsulated with filter fabric. Suitable Structural Fill material should have the index properties shown in Table 6.2.4.1 Table 6.2.4.1 Structural Fill Index Properties Location LL PI Building Areas 50 max 30 max Pavement Areas 50 max 30 max Unsatisfactory Materials: Unsatisfactory fill materials include materials which do not satisfy the requirements for suitable materials, as well as topsoil and organic materials (OH, OL), elastic Silt (MH), and high plasticity Clay (CH). The owner can consider allowing soils with a maximum Liquid Limit of 65 and Plasticity Index of 30 to be used as Structural Fill at depths greater than 2 feet below pavement subgrades outside the expanded building limits and within non-structural areas. 6.2.5 Compaction Structural Fill Compaction: Structural Fill within the expanded building, pavement, and embankment limits should be placed in maximum 8-inch loose lifts, moisture conditioned as necessary to within - suitable equipment to a dry density of at least 95% of the Standard Proctor maximum dry density (ASTM D698) except within 24 inches of finished soil subgrade elevation beneath slab-on-grade and pavements. Within the top 24 inches of finished soil subgrade elevation beneath slab on grade and pavements, the approved project fill should be compacted to at least 100 percent of its standard Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 14 Proctor maximum dry density. ECS should be called on to document that proper fill compaction has been achieved. Fill Compaction Control: The expanded limits of the proposed construction areas should be well defined, including the limits of the fill zones for buildings, pavements, and slopes, etc., at the time of fill placement. Grade controls should be maintained throughout the filling operations. Filling operations should be observed on a full-time basis by ECS to determine that the minimum compaction requirements are being achieved. Table 6.2.5.1 Frequency of Compaction Tests in Fill Areas Location Frequency of Tests Building Areas 1 test per 5,000 sq. ft. per lift Pavement Areas 1 test per 10,000 sq. ft. per lift Utility Trenches 1 test per 200 linear ft. per lift Compaction Equipment: Compaction equipment suitable to the soil type being compacted should be used to compact the subgrades and fill materials. Sheepsfoot compaction equipment should be suitable for the fine-grained soils (Clays and Silts). A vibratory steel drum roller should ideally be used for compaction of coarse-grained soils (Sands), as well as for sealing compacted surfaces. Fill Placement Considerations: Fill materials should not be placed on frozen soils, on frost-heaved soils, and/or on excessively wet soils. Borrow fill materials should not contain frozen materials at the time of placement, and frozen or frost-heaved soils should be removed prior to placement of Structural Fill or other fill soils and aggregates. Excessively wet soils or aggregates should be scarified, aerated, and moisture conditioned. At the end of each work day, fill areas should be graded to facilitate drainage of precipitation and the surface should be sealed by use of a smooth-drum roller to limit infiltration of surface water. During placement and compaction of new fill at the beginning of each workday, the Contractor may need to scarify existing subgrades to a depth on the order of 4 inches so that a weak plane will not be formed between the new fill and the existing subgrade soils. Drying and compaction of wet soils is typically difficult during the cold, winter months. Accordingly, earthwork should be performed during the warmer, drier times of the year, if practical. Proper drainage should be maintained during the earthwork phases of construction to prevent ponding of water which has a tendency to degrade subgrade soils. Alternatively, if these soils cannot be stabilized by conventional methods as previously discussed, additional modifications to the subgrade soils such as lime or cement stabilization may be utilized to adjust the moisture content. If lime or cement are utilized to control moisture contents and/or for stabilization, Quick Lime, ® Calciment or regular Type 1 cement can be used. The construction testing laboratory should evaluate proposed lime or cement soil modification procedures, such as quantity of additive and mixing and curing procedures, before implementation. The Contractor should be required to minimize dusting or implement dust control measures, as required. Where fill materials will be placed to widen existing embankment fills, or placed up against sloping ground, the soil subgrade should be scarified and the new fill benched or keyed into the existing material. Fill material should be placed in horizontal lifts. In confined areas such as utility trenches, Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 15 portable compaction equipment and thin lifts of 4 inches or less may be required to achieve specified degrees of compaction. We recommend that the Grading Contractor have equipment on site during earthwork for both drying and wetting fill soils. We do not anticipate significant problems in controlling moisture within the fill during dry weather, but moisture control may be difficult during winter months or extended periods of rain. The control of moisture content of higher plasticity soils is difficult when these soils become wet. Further, such soils are easily degraded by construction traffic when the moisture content is elevated. 6.3 FOUNDATIONS Protection of Foundation Excavations: Exposure to the environment may weaken the soils at the footing bearing level if the foundation excavations remain open for too long a time. Therefore, foundation concrete should be placed the same day that excavations are made. If the bearing soils are softened by surface water intrusion or exposure, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if rainfall becomes imminent while the bearing soils are exposed, a 2 to 3- placement of reinforcing steel. Footing Subgrade Observations: With the exception of high plasticity soils (Elastic SILT (MH) with a PI>30 and Fat CLAY (CH)), the soils at the foundation bearing elevation are anticipated to be suitable for support of the proposed structure. It will be important to have ECS observe the foundation subgrade prior to placing foundation concrete, to observe the bearing soils are what was anticipated. If soft or unsuitable soils are observed at the footing bearing elevations at the time of footing construction, the unsuitable soils should be undercut and replaced. Undercut footing areas 1,000 psi at 28 days) Structural Fill, or compacted c crushed aggregate up to the original design bottom of footing elevation. Depending upon the final site grades, it is possible that the foundation subgrades may include natural residual soil, Structural Fill, and PWR. Particular attention should be paid to areas where PWR is exposed at the foundation bearing elevation. If the PWR cannot be excavated to achieve a relatively uniform bearing surface, localized over-excavation on the order of 6 inches and backfilling with properly compacted Structural Fill will be necessary. 6.4 UTILITY INSTALLATIONS Utility Subgrades: The soils encountered in our exploration with the exception of the existing undocumented fill are expected to be generally suitable for support of utility pipes. The pipe subgrade should be observed and probed for stability by ECS to evaluate the suitability of the materials encountered. Loose or unsuitable materials encountered at the utility pipe subgrade elevation should be removed and replaced with suitable compacted Structural Fill or pipe bedding material. If PWR or rock is encountered above the invert elevation during utility excavation, over- excavation of up to 6 inches below the pipe invert to reduce the effects of point loading on the utilities may be recommended. Utility Backfilling: The granular bedding material should be at least 4 inches thick, but not less than that specified by the project drawings and specifications. Fill placed for support of the utilities, as well as backfill over the utilities, should satisfy the requirements for Structural Fill given in this Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 16 report. Compacted backfill should be free of topsoil, roots, ice, or other material designated by ECS as unsuitable. The backfill should be moisture conditioned, placed, and compacted in accordance with the recommendations of this report. 6.5 GENERAL CONSTRUCTION CONSIDERATIONS Moisture Conditioning: During the cooler and wetter periods of the year, delays and additional costs should be anticipated. At these times, reduction of soil moisture may need to be accomplished by a combination of mechanical manipulation and the use of chemical additives, such as lime or cement, in order to lower moisture contents to levels appropriate for compaction. Alternatively, during the drier times of the year, such as the summer months, moisture may need to be added to the soil to provide adequate moisture for successful compaction according to the project requirements. Subgrade Protection: Measures should also be taken to limit site disturbance, especially from rubber-tired heavy construction equipment, and to control and remove surface water from development areas, including structural and pavement areas. It would be advisable to designate a haul road and construction staging area to limit the areas of disturbance and to prevent construction traffic from excessively degrading sensitive subgrade soils and existing pavement areas. Haul roads and construction staging areas could be covered with excess depths of aggregate to protect those subgrades. The aggregate can later be removed and used in pavement areas, provided it meets project specifications and is free of soil contamination. Surface Drainage: Surface drainage conditions should be properly maintained. Surface water should be directed away from the construction area, and the work area should be sloped away from the construction area at a gradient of 1 percent or greater to reduce the potential of ponding water and the subsequent saturation of the surface soils. At the end of each work day, the subgrade soils should be sealed by rolling the surface with a smooth drum roller to reduce infiltration of surface water. Excavation Safety: Excavations and slopes should be made and maintained in accordance with OSHA excavation safety standards. The Contractor is solely responsible for designing and constructing stable, temporary excavations and slopes and should shore, slope, or bench the sides of the excavations and slopes as required to maintain stability of both the excavation sides and bottom. The C soil exposed in the excavations as part of the Ccedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ECS is providing this information solely as a service to our client. ECS is not assuming responsibility for construction site safety or the C inferred. Erosion Control: The surface soils may be erodible. Therefore, the Contractor should provide and maintain good site drainage during earthwork operations to maintain the integrity of the surface soils. Erosion and sedimentation controls should be in accordance with sound engineering practices and local requirements. Union County Sheriff Expansion March 11, 2020 ECS Project No. 08:14031 Page 17 7.0 CLOSING ECS has prepared this report of findings, evaluations, and recommendations to guide geotechnical- related design and construction aspects of the project. The description of the proposed project is based on information provided to ECS. If any of this information is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted so that we can review the changed conditions and provide additional or alternate recommendations as may be required to reflect the proposed construction. we may ascertain consistency of those plans/specifications with the intent of the geotechnical report. Field observations, monitoring, and quality assurance testing during earthwork and foundation installation are an extension of and integral to the geotechnical design recommendation. We recommend that the owner retain these quality assurance services and that ECS continue our involvement throughout these critical phases of construction to provide general consultation as issues arise. ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report. APPENDIX A Drawings & Reports Site Location Diagram Boring Location Diagram Boring Log Summary Profiles A & B Service Layer Credits: Esri, HERE, Garmin, (c) OpenStreetMap contributors ² Site Location 01,0002,000 Feet ENGINEER CJC2 Site Location Diagram SCALE 1 " = 1000 ' UNION COUNTY SHERIFF EXPANSION PROJECT NO. 08:14031 3344 PRESSON RD, MONROE, NORTH CAROLINA 1 DATE CREECH & ASSOCIATES 3//2020 Service Layer Credits: Esri, HERE, Garmin, (c) OpenStreetMap contributors ² B-12 B-14 B-1 B-13 B-3 B-4 B-2 B-7 B-5 B-6 B-10 B-9 B-8 B-11 B-15 Legend 0150300 Approximate boring locations - Feet ENGINEER CJC2 Boring Location Diagram SCALE 1 " = 150 ' UNION COUNTY SHERIFF EXPANSION PROJECT NO. 08:14031 3344 PRESSON RD, MONROE, NORTH CAROLINA 2 DATE CREECH & ASSOCIATES 3//2020 550550 B-1B-2B-3 B-4 B-5B-6B-7B-8 MLMH 6167 MHML MH 5 545545 MH MHML 146322 15100+21 ML 41 PWRML 6024100+100+ PWR 100+100+27 CL 5 540540 1911100+100+ PWR 8831100+ PWRPWR ML 100+ 2212100+100+ ML 45 ML ML Elevation in Feet 535535 PWR 100+18100+ 100+ PWR Elevation in Feet PWR 100+13599 MLML 530530 100+ 39100+ PWR AUGER REFUSAL PWR 78 @ 19' AUGER REFUSAL 100+ @ 19.7' 100+1653 SM AUGER REFUSAL SM @ 18.7' 525525 36 PWR 56 100+100+100+ END OF BORING @ 25' END OF BORINGEND OF BORING END OF BORINGEND OF BORING @ 23.7'@ 23.7' @ 25'@ 24' 520520 BORING LOG SUMMARY PROFILE NOTES: 1 SEE INDIVIDUAL BORING LOG AND GEOTECHNICAL REPORT FOR ADDITIONAL INFORMATION. Union County Sheriff ExpansionUnion County Sheriff Expansion 2 PENETRATION TEST RESISTANCE IN BLOWS PER FOOT (ASTM D1586). Creech & Associates 3344 Presson Road, Monroe, Union County, North Carolina PROJECT NO.:14031DATE:3//2020VERTICAL SCALE:1"=5'VERTICAL SCALE:1"=5' 558558 B-12B-13 ML MH B-14 828 552552 5 2472 CH 8 B-9B-11 2345 B-10 546546 ML 85 PWR ML 100+ 29 MHMH 106 PWR CH 13100+ END OF BORING END OF BORING @ 9.9' @ 10' END OF BORING PWRML 100+31 @ 9' MH 31 Elevation in Feet 540540 PWR B-15 52100+ ML 36 7885 Elevation in Feet ML 4 ML 100+ 534534 30 ML 53100+ 100+ 100+ PWR PWR 100+ PWR 528528 END OF BORING @ 9.4' 41100+ 100+ PWR CL 522522 100+ 8 100+ END OF BORINGEND OF BORING END OF BORING @ 24.8'@ 23.8' @ 25' BORING LOG SUMMARY PROFILE NOTES: 1 SEE INDIVIDUAL BORING LOG AND GEOTECHNICAL REPORT FOR ADDITIONAL INFORMATION. Union County Sheriff ExpansionUnion County Sheriff Expansion 2 PENETRATION TEST RESISTANCE IN BLOWS PER FOOT (ASTM D1586). Creech & Associates 3344 Presson Road, Monroe, Union County, North Carolina PROJECT NO.:14031DATE:3/10/2020VERTICAL SCALE:1"=6'VERTICAL SCALE:1"=6' APPENDIX B Field Operations Reference Notes for Boring Logs Boring Logs B-1 through B-15 ! SFGFSFODF!OPUFT!GPS!CPSJOH!MPHT! ! 2-3 ESJMMJOH!TBNQMJOH!TZNCPMT!'!BCCSFWJBUJPOT NBUFSJBM! ! TT!Tqmju!Tqppo!Tbnqmfs!QN!Qsfttvsfnfufs!Uftu! BTQIBMU! ! TU!Tifmcz!Uvcf!Tbnqmfs!SE!Spdl!Cju!Esjmmjoh! XT!Xbti!Tbnqmf!SD!Spdl!Dpsf-!OY-!CY-!BY! ! DPODSFUF! ! CT!Cvml!Tbnqmf!pg!Dvuujoht!SFD!Spdl!Tbnqmf!Sfdpwfsz!&! ! QB!Qpxfs!Bvhfs!)op!tbnqmf*!SRE!Spdl!Rvbmjuz!Eftjhobujpo!&! HSBWFM!! ITB!Ipmmpx!Tufn!Bvhfs!!! ! UPQTPJM! ! QBSUJDMF!TJ\[F!JEFOUJGJDBUJPO! WPJE! E FTJHOBUJPO!Q BSUJDMF!T J\[FT! ! ! Cpvmefst!!23!jodift!)411!nn*!ps!mbshfs! ! CSJDL! Dpccmft!!4!jodift!up!23!!jodift!)86!nn!up!411!nn*! ! Hsbwfm;!!!!!Dpbstf!!¿!jodi!up!4!jodift!)2:!nn!up!86!nn*! BHHSFHBUF!CBTF!DPVSTF! !!!!!!!!!!!!!!!!!Gjof!!5/86!nn!up!2:!nn!)Op/!5!tjfwf!up!¿!jodi*! ! Tboe;!!!!!!!Dpbstf!!3/11!nn!up!5/86!nn!)Op/!21!up!Op/!5!tjfwf*! 4 GJMM!!!!NBO.QMBDFE!TPJMT! ! !!!!!!!!!!!!!!!!!Nfejvn!!1/536!nn!up!3/11!nn!)Op/!51!up!Op/!21!tjfwf*! HX!XFMM.HSBEFE!HSBWFM! !!!!!!!!!!!!!!!!!Gjof!!1/185!nn!up!1/536!nn!)Op/!311!up!Op/!51!tjfwf*! ! hsbwfm.tboe!njyuvsft-!mjuumf!ps!op!gjoft! Tjmu!'!Dmbz!)”Gjoft•*!!=1/185!nn!)tnbmmfs!uibo!b!Op/!311!tjfwf*! HQ!QPPSMZ.HSBEFE!HSBWFM! ! hsbwfm.tboe!njyuvsft-!mjuumf!ps!op!gjoft! DPIFTJWF!TJMUT!'!DMBZT!! GJOF! DPBSTF! ! HN!TJMUZ!HSBWFM! HSBJOFE! HSBJOFE! SFMBUJWF! hsbwfm.tboe.tjmu!njyuvsft! V ODPOGJOFE! 8 9 9 68 BNPVOU! )&*! )&*! TQU!D POTJTUFODZ! D PNQSFTTJWF! HD!DMBZFZ!HSBWFM! 5 hsbwfm.tboe.dmbz!njyuvsft! )CQG*!)DPIFTJWF*! T USFOHUI-!R! Q Usbdf!=6!=6! =4!Wfsz!Tpgu! TX!XFMM.HSBEFE!TBOE! =1/36! Evbm!Tzncpm!21!21! hsbwfmmz!tboe-!mjuumf!ps!op!gjoft! 4!.!5!Tpgu! 1/36!.!=1/61! )fy;!TX.TN*! TQ!QPPSMZ.HSBEFE!TBOE! 6!.!9!Gjsn! 1/61!.!=2/11! Xjui!26!.!31!26!.!36! hsbwfmmz!tboe-!mjuumf!ps!op!gjoft! :!.!26!Tujgg! 2/11!.!=3/11! Bekfdujwf!?36!?41! TN!TJMUZ!TBOE! )fy;!”Tjmuz•*! 27!.!41!Wfsz!Tujgg! 3/11!.!=5/11! tboe.tjmu!njyuvsft! 42!.!61!Ibse! 5/11!.!9/11! TD!DMBZFZ!TBOE! ?61!Wfsz!Ibse! 7 ?9/11! tboe.dmbz!njyuvsft! XBUFS!MFWFMT! ! XM!Xbufs!Mfwfm!)XT*)XE*! NM!TJMU!!! ! opo.qmbtujd!up!nfejvn!qmbtujdjuz! HSBWFMT-!TBOET!'!OPO.DPIFTJWF!TJMUT !)XT*!Xijmf!Tbnqmjoh! ! 6 ! NI!FMBTUJD!TJMU!! TQU !)XE*!Xijmf!Esjmmjoh! E FOTJUZ ! ijhi!qmbtujdjuz! TIX!Tfbtpobm!Ijhi!XU! ! =6!Wfsz!Mpptf! DM!MFBO!DMBZ!!! BDS!Bgufs!Dbtjoh!Sfnpwbm! ! 6!.!21!Mpptf! mpx!up!nfejvn!qmbtujdjuz! TXU!Tubcjmj{fe!Xbufs!Ubcmf! ! 22!.!41!Nfejvn!Efotf! DI!GBU!DMBZ! EDJ!Esz!Dbwf.Jo! ijhi!qmbtujdjuz! ! 42!.!61!Efotf! XDJ!Xfu!Dbwf.Jo! ?61!Wfsz!Efotf! ! PM!PSHBOJD!TJMU!ps!DMBZ!! opo.qmbtujd!up!mpx!qmbtujdjuz! PIPSHBOJD!TJMU!ps!DMBZ ijhi!qmbtujdjuz! QU!QFBU!! ijhimz!pshbojd!tpjmt! ! ! 2 Dmbttjgjdbujpot!boe!tzncpmt!qfs!BTUN!E!3599.1:!)Wjtvbm.Nbovbm!Qspdfevsf*!vomftt!opufe!puifsxjtf/! 3 Up!cf!dpotjtufou!xjui!hfofsbm!qsbdujdf-!”QPPSMZ!HSBEFE•!ibt!cffo!sfnpwfe!gspn!HQ-!HQ.HN-!HQ.HD-!TQ-!TQ.TN-!TQ.TD!tpjm!uzqft!po!uif!cpsjoh!mpht/! 4 Opo.BTUN!eftjhobujpot!bsf!jodmvefe!jo!tpjm!eftdsjqujpot!boe!tzncpmt!bmpoh!xjui!BTUN!tzncpm!\\Fy;!)TN.GJMM*^/! 5 Uzqjdbmmz!ftujnbufe!wjb!qpdlfu!qfofuspnfufs!ps!Upswbof!tifbs!uftu!boe!fyqsfttfe!jo!upot!qfs!trvbsf!gppu!)utg*/! 6 Tuboebse!Qfofusbujpo!Uftu!)TQU*!sfgfst!up!uif!ovncfs!pg!ibnnfs!cmpxt!)cmpx!dpvou*!pg!b!251!mc/!ibnnfs!gbmmjoh!41!jodift!po!b!3!jodi!PE!tqmju!tqppo!tbnqmfs!! sfrvjsfe!up!esjwf!uif!tbnqmfs!23!jodift!)BTUN!E!2697*/!!”O.wbmvf•!jt!bopuifs!ufsn!gps!”cmpx!dpvou•!boe!jt!fyqsfttfe!jo!cmpxt!qfs!gppu!)cqg*/!! 7 Uif!xbufs!mfwfmt!bsf!uiptf!mfwfmt!bduvbmmz!nfbtvsfe!jo!uif!cpsfipmf!bu!uif!ujnft!joejdbufe!cz!uif!tzncpm/!!Uif!nfbtvsfnfout!bsf!sfmbujwfmz!sfmjbcmf! !xifo!bvhfsjoh-!xjuipvu!beejoh!gmvjet-!jo!hsbovmbs!tpjmt/!!Jo!dmbz!boe!dpiftjwf!tjmut-!uif!efufsnjobujpo!pg!xbufs!mfwfmt!nbz!sfrvjsf!tfwfsbm!ebzt!gps!uif !xbufs!mfwfm!up!tubcjmj{f/!!Jo!tvdi!dbtft-!beejujpobm!nfuipet!pg!nfbtvsfnfou!bsf!hfofsbmmz!fnqmpzfe/! 8 Njops!efwjbujpo!gspn!BTUN!E!3599.1:!Opuf!27/! 9! Qfsdfoubhft!bsf!ftujnbufe!up!uif!ofbsftu!6&!qfs!BTUN!E!3599.1:/ !!!Sfgfsfodf!Opuft!gps!Cpsjoh!Mpht!)14.33.3128*!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!ª!3128!FDT!Dpsqpsbuf!Tfswjdft- !MMD/!!Bmm!Sjhiut!Sftfswfe! CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-11 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 548 BLOWS/FT 1020304050+ 0 Topsoil Thickness 3.0" (MH RESIDUAL) ELASTIC SILT, reddish brown 2 to light brown and red, moist, firm to stiff 2 S-1SS18186 4 545 4 6 S-2SS181815 9 5 (PWR) PARTIALLY WEATHERED ROCK 100+ 25 SAMPLED AS SANDY SILT, light brown 50/5 S-3SS1816 540 (ML) SANDY SILT, light brown, moist, very hard 35 38 S-4SS181688 50 10 (PWR) PARTIALLY WEATHERD ROCK 535 SAMPLED AS SILTY FINE TOMEDIUM SAND, grayish brown 50/6 S-5SS185100+ 15 530 50/6 S-6SS185100+ AUGER REFUSAL @ 19.0' 20 525 25 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/22/202016.2 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/22/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-21 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 548 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" (ML RESIDUAL) SANDY SILT, reddish brown 5 to light brown, moist, very stiff 7 S-1SS1818 9 16 545 (PWR) PARTIALLY WEATHERED ROCK 100+ 35 SAMPLED AS SANDY SILT, light brown to 50/5 S-2SS1812 grayish brown 5 43 50/4 S-3SS1810100+ 540 (ML) SANDY SILT, grayish brown to light 31 21 brown, moist, hard to very stiff 16 S-4SS1810 15 10 535 6 8 S-5SS181818 10 15 (ML) SANDY SILT, light brown to grayish 530 brown, moist, hard 13 19 S-6SS181839 20 20 525 7 6 S-7SS181836 30 25 END OF BORING @ 25.0' 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/22/202021.1 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/22/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-31 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 548 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" (MH RESIDUAL) ELASTIC SILT, reddish 2 brown, moist, firm 3 S-1SS18187 4 545 (ML) SANDY SILT, reddish brown, moist, very 5 stiff 7 S-2SS1818 14 21 5 9 14 S-3SS1818 13 27 540 (PWR) PARTIALLY WEATHERED ROCK 100+ 50/6 SAMPLED AS SANDY SILT, light brown S-4SS186 10 (ML) SANDY SILT, grayish brown, moist, hard 2 22 S-5SS181845 23 535 (PWR) PARTIALLY WEATHERED ROCK 50/5 SAMPLED AS SANDY SILT, grayish brown S-6SS185100+ 15 530 47 50/2 S-7SS185100+ 20 Auger Refusal @ 19.7' 525 25 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/22/202015.1 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/22/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-41 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 547 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" (MH RESIDUAL) ELASTIC SILT, orangish 2 brown, moist, firm 2 S-1SS1818 545 3 5 (ML) SANDY SILT, light brown, moist, hard 12 18 S-2SS1818 23 41 5 (CL) LEAN CLAY, reddish brown, moist, firm 2 2 S-3SS1818 540 3 5 (PWR) PARTIALLY WEATHERED ROCK 100+ 40 SAMPLED AS SILTY SAND, light brown to 50/3 S-4SS187 grayish brown 10 535 42 50/5 S-5SS1810100+ 15 530 (SM) SILTY SAND, grayish brown, moist, very dense 23 33 S-6SS181478 45 20 525 36 22 S-7SS181456 34 25 END OF BORING @ 25.0' 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/22/202015.4 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/22/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-51 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 546 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" 545 (ML RESIDUAL) SANDY SILT, light brown, 7 moist, stiff 5 S-1SS1818 9 14 (ML) SANDY SILT, light brown, moist, very hard 18 20 S-2SS1818 40 60 5 (ML) SANDY SILT, reddish brown to light 540 19 8 brown, moist, very stiff 8 S-3SS1818 11 11 11 S-4SS181822 11 10 535 (PWR) PARTIALLY WEATHERED ROCK SAMPLED AS SANDY SILT, light brown to grayish brown 7 20 S-5SS1816 50/5 100+ 15 530 15 40 S-6SS1816100+ 50/5 20 525 50/5 S-7SS55100+ END OF BORING @ 24.0' 25 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/202020.1 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-61 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 546 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" 545 (MH RESIDUAL) ELASTIC SILT, reddish 2 brown, moist, firm 3 S-1SS1818 3 6 (ML) SANDY SILT, light brown, moist, very stiff 24 7 to stiff 12 S-2SS1814 12 5 540 4 5 S-3SS181411 6 3 6 S-4SS181812 6 10 535 4 5 S-5SS181813 8 15 530 (PWR) PARTIALLY WEATHERED ROCK SAMPLED AS SILTY SAND, gray 50/2 S-6SS22 AUGER REFUSAL @ 18.7' 100+ 20 525 25 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/202016.2 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-71 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 546 BLOWS/FT 1020304050+ 0 Topsoil Thickness 1.0" 545 (MH RESIDUAL) ELASTIC SILT, reddish 1 brown, moist, soft 2 S-1SS1818 1 3 (PWR) PARTIALLY WEATHERED ROCK 100+ 26 SAMPLED AS SANDY SILT, orangish brown to 50/5 S-2SS1818 light brown 5 540 22 35 S-3SS1818100+ 50/6 24 42 S-4SS1818100+ 50/5 10 535 (ML) SANDY SILT, grayish brown, moist, very hard 36 36 S-5SS181659 23 15 530 (ML) SANDY SILT, light brown, moist, very stiff 5 7 S-6SS1818 9 16 20 525 (PWR) PARTIALLY WEATHERED ROCK SAMPLED AS SILTY SAND, gray 50/2 S-7SS22 END OF BORING @ 23.7' 100+ 25 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/202021.5 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-81 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 546 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" 545 (ML RESIDUAL) SANDY SILT, grayish brown, 3 moist, very stiff 7 S-1SS1818 15 22 (PWR) PARTIALLY WEATHERED ROCK 100+ 35 SAMPLED AS SANDY SILT, light brown 50/4 S-2SS1816 5 540 20 30 S-3SS1816100+ 50/6 28 50/5 S-4SS1810100+ 10 535 (ML) SANDY SILT, orangish brown, moist, stiff 3 3 S-5SS1818 6 9 15 530 (SM) SILTY SAND, orangish brown, moist, very dense 53 15 23 S-6SS1816 30 20 525 (PWR) PARTIALLY WEATHERED ROCK SAMPLED AS SILTY SAND, gray 100+ 50/1 S-7SS11 END OF BORING @ 23.7' 25 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/202020.0 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-91 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 546 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" 545 (MH RESIDUAL) ELASTIC SILT, reddish 3 brown, moist, stiff 4 S-1SS1818 6 10 (PWR) PARTIALLY WEATHERED ROCK 100+ 17 SAMPLED AS SANDY SILT, reddish brown 42 S-2SS1818 50/5 5 (ML) SANDY SILT, light reddish brown to 540 14 grayish brown, moist, very hard to hard 20 S-3SS181452 32 23 28 S-4SS181878 50 10 535 14 28 S-5SS181653 25 15 530 8 14 S-6SS181841 27 20 525 (PWR) PARTIALLY WEATHERED ROCK SAMPLED AS SILTY SAND, orangish brown 19 28 S-7SS1614100+ 50/4 25 END OF BORING @ 24.8' 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/202021.0 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-101 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 545 BLOWS/FT 1020304050+ 0545 Topsoil Thickness 1.0" (CH RESIDUAL) FAT CLAY, reddish brown, 3 moist, stiff 4 S-1SS18181325.064 8 31 (MH) ELASTIC SILT, reddish brown, moist, 31 8 hard 12 S-2SS1818 9 5540 (ML) SANDY SILT, light reddish brown, moist, 9 hard 16 S-3SS181836 20 (PWR) PARTIALLY WEATHERED ROCK 14 SAMPLED AS SANDY SILT, light brown to 26 S-4SS1818 grayish brown 50/6 100+ 10535 16 50/6 S-5SS1813100+ 15530 50/3 S-6SS183100+ 20525 100+ 50/3 S-7SS33 END OF BORING @ 23.8' 25520 30515 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/202021.4 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-111 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 546 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" 545 (MH RESIDUAL) ELASTIC SILT, reddish 2 brown, moist, firm 2 S-1SS1818 4 6 (ML) SANDY SILT, reddish brown, moist, hard 6 8 S-2SS1818 23 31 5 (PWR) PARTIALLY WEATHERED ROCK 540 26 SAMPLED AS SANDY SILT, light brown 50/4 S-3SS1810 100+ (ML) SANDY SILT, light brown, moist, very hard 23 48 S-4SS181485 37 10 535 (PWR) PARTIALLY WEATHERED ROCK SAMPLED AS SANDY SILT, light brown 50/6 S-5SS185100+ 15 530 15 38 S-6SS1816100+ 50/4 20 525 (CL) LEAN CLAY, light brown, moist, firm 7 3 S-7SS1814 5 8 25 END OF BORING @ 25.0' 520 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/202021.8 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-121 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 554 BLOWS/FT 1020304050+ 0 Topsoil Thickness 4.0" (MH RESIDUAL) ELASTIC SILT, reddish 3 brown, moist, firm 3 S-1SS181819.8 5 8 (MH) ELASTIC SILT, reddish brown, moist, 24 6 550 very stiff 10 S-2SS1818 14 5 6 9 S-3SS181823 14 (ML) SANDY SILT, reddish brown, moist, very 5 hard 545 9 S-4SS1818 20 29 10 END OF BORING @ 10.0' 540 15 535 20 530 25 525 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/20208.0 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-131 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 554 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" (ML RESIDUAL) SANDY SILT, light brown, 9 moist, very stiff 13 S-1SS181828 15 (ML) SANDY SILT, light brown, moist, very 72 8 550 hard to hard 22 S-2SS1818 50 5 13 20 S-3SS181845 25 (PWR) PARTIALLY WEATHERED ROCK 13 SAMPLED AS SANDY SILT, grayish brown 545 25 S-4SS1717 50/5 100+ 10 END OF BORING @ 9.9' 540 15 535 20 530 25 525 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/20207.0 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-141 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 552 BLOWS/FT 1020304050+ 0 Topsoil Thickness 2.0" (CH RESIDUAL) FAT CLAY, reddish brown, 2 moist, firm 2 S-1SS181852168 550 3 35.2 3 3 S-2SS18188 5 5 (ML) SANDY SILT, light reddish brown, moist, 85 5 very hard 35 S-3SS1816 545 50 (PWR) PARTIALLY WEATHERED ROCK 50/6 S-4SS66 SAMPLED AS SANDY SILT, grayish brown 100+ END OF BORING @ 9.0' 10 540 15 535 20 530 25 525 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/20207.1 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 CLIENTJob #:BORING #SHEET Creech & Associates08:14031B-151 OF 1 PROJECT NAMEARCHITECT-ENGINEER Union County Sheriff Expansion SITE LOCATION 2 CALIBRATED PENETROMETER TONS/FT 12345+ 3344 Presson Road, Monroe, Union County, North Carolina ROCK QUALITY DESIGNATION & RECOVERY NORTHINGEASTINGSTATION RQD%REC.% 20%40%60%80%100% DESCRIPTION OF MATERIAL ENGLISH UNITS PLASTICWATERLIQUID LIMIT %CONTENT %LIMIT % BOTTOM OF CASINGLOSS OF CIRCULATION STANDARD PENETRATION SURFACE ELEVATION 538 BLOWS/FT 1020304050+ 0 Topsoil Thickness 3.0" (ML RESIDUAL) SANDY SILT, orangish brown, 2 moist, soft 2 S-1SS181829.4 2 4 535 (ML) SANDY SILT, orangish brown, moist, very 3 stiff 6 S-2SS1818 24 30 5 (PWR) PARTIALLY WEATHERED ROCK 20 SAMPLED AS SANDY SILT, grayish brown 44 S-3SS1816 50/3 100+ 530 40 S-4SS77 50/3 100+ END OF BORING @ 9.4' 10 525 15 520 20 515 25 510 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL. WLWS WD BORING STARTEDCAVE IN DEPTH GNE2/24/20206.1 WL(SHW)WL(ACR)BORING COMPLETEDHAMMER TYPE GNE2/24/2020 WLRIGFOREMANDDRRIILLLLIINNGG MMEETTHHOODD SIMCO 2400Cody PresleyHHSSAA 22..2255 APPENDIX C Laboratory Testing Laboratory Testing Summary ECS MID-ATLANTIC, LLC Laboratory Testing Summary Date:3..2020 Project Number:ProjectName: 14031Union County Sheriff ExpansionGEO PercentCompaction Boring SampleDepth/MoistureLiquidPlastic PlasticityPassingMaximumOptimumCBROther NumberNumberLocationContentLimitLimitIndexNo. 200DensityMoistureValue Tpjm (%)Sieve(pcf)(%) 1.0-2.5' 25.0CH B-10S-1643133 1.0-2.5' 19.8 B-12S-1 1.0-2.5' 35.2CH B-14S-1682147 1.0-2.5' 29.4 B-15S-1 Summary Key: V = Virginia Test MethodHyd = HydrometerUCS = Unconfined Compression SoilOC = Organic Content S = Standard ProctorCon = ConsolidationUCR = Unconfined Compression RockSA = See Attached M= Modified ProctorDS = Direct ShearLS = Lime StabilizationNP = Non Plastic GS = Specific GravityCS = Cement Staibilization*= Test Not Conducted Lab Workbook and Summary SheetPage 1 Jnqpsubou!Jogpsnbujpo!Bcpvu!Zpvs Hfpufdiojdbm!Fohjoffsjoh!Sfqpsu Tvctvsgbdf!qspcmfnt!bsf!b!qsjodjqbm!dbvtf!pg!dpotusvdujpo!efmbzt-!dptu!pwfssvot-!dmbjnt-!boe!ejtqvuft Uif!gpmmpxjoh!jogpsnbujpo!jt!qspwjefe!up!ifmq!zpv!nbobhf!zpvs!sjtlt/ ¦!fmfwbujpo-!dpoÑ!hvsbujpo-!mpdbujpo-!psjfoubujpo-!ps!xfjhiu!pg!uif Hfpufdiojdbm!Tfswjdft!Bsf!Qfsgpsnfe!gps !qspqptfe!tusvduvsf- TqfdjÑ!d!Qvsqptft-!Qfstpot-!boe!Qspkfdut ¦!dpnqptjujpo!pg!uif!eftjho!ufbn-!ps Hfpufdiojdbm!fohjoffst!tusvduvsf!uifjs!tfswjdft!up!nffu!uif!tqfdjÑ!d!offet!pg! ¦!qspkfdu!pxofstijq/ uifjs!dmjfout/!B!hfpufdiojdbm!fohjoffsjoh!tuvez!dpoevdufe!gps!b!djwjm!fohjoffs! nbz!opu!gvmÑ!mm!uif!offet!pg!b!dpotusvdujpo!dpousbdups!ps!fwfo!bopuifs!djwjm! Bt!b!hfofsbm!svmf-!bmxbzt!jogpsn!zpvs!hfpufdiojdbm!fohjoffs!pg!qspkfdu! fohjoffs/!Cfdbvtf!fbdi!hfpufdiojdbm!fohjoffsjoh!tuvez!jt!vojrvf-!fbdi!hfp. dibohft!.!fwfo!njops!poft!.!boe!sfrvftu!bo!bttfttnfou!pg!uifjs!jnqbdu/! ufdiojdbm!fohjoffsjoh!sfqpsu!jt!vojrvf-!qsfqbsfe!tpmfmz!gps!uif!dmjfou/!Op!pof! Hfpufdiojdbm!fohjoffst!dboopu!bddfqu!sftqpotjcjmjuz!ps!mjbcjmjuz!gps!qspcmfnt! fydfqu!zpv!tipvme!sfmz!po!zpvs!hfpufdiojdbm!fohjoffsjoh!sfqpsu!xjuipvu!Ñ!stu! uibu!pddvs!cfdbvtf!uifjs!sfqpsut!ep!opu!dpotjefs!efwfmpqnfout!pg!xijdi!uifz! dpogfssjoh!xjui!uif!hfpufdiojdbm!fohjoffs!xip!qsfqbsfe!ju/!Boe!op!pof!.!opu! xfsf!opu!jogpsnfe/ fwfo!zpv!.!tipvme!bqqmz!uif!sfqpsu!gps!boz!qvsqptf!ps!qspkfdu!fydfqu!uif!pof! psjhjobmmz!dpoufnqmbufe/ Tvctvsgbdf!Dpoejujpot!Dbo!Dibohf B!hfpufdiojdbm!fohjoffsjoh!sfqpsu!jt!cbtfe!po!dpoejujpot!uibu!fyjtufe!bu!uif! Sfbe!uif!Gvmm!Sfqpsu ujnf!uif!tuvez!xbt!qfsgpsnfe/!Ep!opu!sfmz!po!b!hfpufdiojdbm!fohjoffsjoh! Tfsjpvt!qspcmfnt!ibwf!pddvssfe!cfdbvtf!uiptf!sfmzjoh!po!b!hfpufdiojdbm! sfqpsu!xiptf!befrvbdz!nbz!ibwf!cffo!bggfdufe!cz;!uif!qbttbhf!pg!ujnf<!cz! fohjoffsjoh!sfqpsu!eje!opu!sfbe!ju!bmm/!Ep!opu!sfmz!po!bo!fyfdvujwf!tvnnbsz/! nbo.nbef!fwfout-!tvdi!bt!dpotusvdujpo!po!ps!bekbdfou!up!uif!tjuf<!ps!cz!obuv. Ep!opu!sfbe!tfmfdufe!fmfnfout!pomz/ sbm!fwfout-!tvdi!bt!Ò!ppet-!fbsuirvblft-!ps!hspvoexbufs!Ò!vduvbujpot/!Bmxbzt! dpoubdu!uif!hfpufdiojdbm!fohjoffs!cfgpsf!bqqmzjoh!uif!sfqpsu!up!efufsnjof!jg!ju! B!Hfpufdiojdbm!Fohjoffsjoh!Sfqpsu!Jt!Cbtfe!po jt!tujmm!sfmjbcmf/!B!njops!bnpvou!pg!beejujpobm!uftujoh!ps!bobmztjt!dpvme!qsfwfou! B!Vojrvf!Tfu!pg!Qspkfdu.TqfdjÑ!d!Gbdupst nbkps!qspcmfnt/ Hfpufdiojdbm!fohjoffst!dpotjefs!b!ovncfs!pg!vojrvf-!qspkfdu.tqfdjÑ!d!gbdupst! xifo!ftubcmjtijoh!uif!tdpqf!pg!b!tuvez/!Uzqjdbm!gbdupst!jodmvef;!uif!dmjfouÉt! Nptu!Hfpufdiojdbm!Gjoejoht!Bsf!Qspgfttjpobm hpbmt-!pckfdujwft-!boe!sjtl!nbobhfnfou!qsfgfsfodft<!uif!hfofsbm!obuvsf!pg!uif! Pqjojpot tusvduvsf!jowpmwfe-!jut!tj{f-!boe!dpoÑ!hvsbujpo<!uif!mpdbujpo!pg!uif!tusvduvsf! Tjuf!fyqmpsbujpo!jefoujÑ!ft!tvctvsgbdf!dpoejujpot!pomz!bu!uiptf!qpjout!xifsf po!uif!tjuf<!boe!puifs!qmboofe!ps!fyjtujoh!tjuf!jnqspwfnfout-!tvdi!bt!bddftt! tvctvsgbdf!uftut!bsf!dpoevdufe!ps!tbnqmft!bsf!ublfo/!Hfpufdiojdbm!fohjoffst! spbet-!qbsljoh!mput-!boe!voefshspvoe!vujmjujft/!Vomftt!uif!hfpufdiojdbm!fohj. sfwjfx!Ñ!fme!boe!mbcpsbupsz!ebub!boe!uifo!bqqmz!uifjs!qspgfttjpobm!kvehnfou! offs!xip!dpoevdufe!uif!tuvez!tqfdjÑ!dbmmz!joejdbuft!puifsxjtf-!ep!opu!sfmz!po! up!sfoefs!bo!pqjojpo!bcpvu!tvctvsgbdf!dpoejujpot!uispvhipvu!uif!tjuf/!Bduvbm! b!hfpufdiojdbm!fohjoffsjoh!sfqpsu!uibu!xbt; tvctvsgbdf!dpoejujpot!nbz!ejggfs.tpnfujnft!tjhojÑ!dboumz!gspn!uiptf!joej. ¦!opu!qsfqbsfe!gps!zpv- dbufe!jo!zpvs!sfqpsu/!Sfubjojoh!uif!hfpufdiojdbm!fohjoffs!xip!efwfmpqfe!zpvs! ¦!opu!qsfqbsfe!gps!zpvs!qspkfdu- sfqpsu!up!qspwjef!dpotusvdujpo!pctfswbujpo!jt!uif!nptu!fggfdujwf!nfuipe!pg! ¦!opu!qsfqbsfe!gps!uif!tqfdjÑ!d!tjuf!fyqmpsfe-!ps nbobhjoh!uif!sjtlt!bttpdjbufe!xjui!voboujdjqbufe!dpoejujpot/ ¦!dpnqmfufe!cfgpsf!jnqpsubou!qspkfdu!dibohft!xfsf!nbef/ B!SfqpsuÉt!Sfdpnnfoebujpot!Bsf!!Gjobm Uzqjdbm!dibohft!uibu!dbo!fspef!uif!sfmjbcjmjuz!pg!bo!fyjtujoh!hfpufdiojdbm Ep!opu!pwfssfmz!po!uif!dpotusvdujpo!sfdpnnfoebujpot!jodmvefe!jo!zpvs!!sf. fohjoffsjoh!sfqpsu!jodmvef!uiptf!uibu!bggfdu; qpsu/!Uiptf!sfdpnnfoebujpot!bsf!opu!Ñ!obm-!cfdbvtf!hfpufdiojdbm!fohjoffst! ¦!uif!gvodujpo!pg!uif!qspqptfe!tusvduvsf-!bt!xifo!juÉt!dibohfe!gspn!b efwfmpq!uifn!qsjodjqbmmz!gspn!kvehnfou!boe!pqjojpo/!Hfpufdiojdbm!fohjoffst! !!qbsljoh!hbsbhf!up!bo!pgÑ!df!cvjmejoh-!ps!gspn!bmjhiu!joevtusjbm!qmbou dbo!Ñ!obmj{f!uifjs!sfdpnnfoebujpot!pomz!cz!pctfswjoh!bduvbm !up!b!sfgsjhfsbufe!xbsfipvtf- tvctvsgbdf!dpoejujpot!sfwfbmfe!evsjoh!dpotusvdujpo/!Uif!hfpufdiojdbm!fohj.up!ejtbqqpjounfout-!dmbjnt-!boe!ejtqvuft/!Up!ifmq!sfevdf!uif!sjtl!pg!tvdi! offs!xip!efwfmpqfe!zpvs!sfqpsu!dboopu!bttvnf!sftqpotjcjmjuz!ps!mjbcjmjuz!gps!pvudpnft-!hfpufdiojdbm!fohjoffst!dpnnpomz!jodmvef!b!wbsjfuz!pg!fyqmbobupsz! uif!sfqpsuÉt!sfdpnnfoebujpot!jg!uibu!fohjoffs!epft!opu!qfsgpsn!dpotusvdujpo!qspwjtjpot!jo!uifjs!sfqpsut/!Tpnfujnft!mbcfmfe!ÆmjnjubujpotÇ!nboz!pg!uiftf! pctfswbujpo/qspwjtjpot!joejdbuf!xifsf!hfpufdiojdbm!fohjoffstÉ!sftqpotjcjmjujft!cfhjo! boe!foe-!up!ifmq!puifst!sfdphoj{f!uifjs!pxo!sftqpotjcjmjujft!boe!sjtlt/!Sfbe! B!Hfpufdiojdbm!Fohjoffsjoh!Sfqpsu!Jt!Tvckfdu!up uiftf!qspwjtjpot!dmptfmz/!Btl!rvftujpot/!Zpvs!hfpufdiojdbm!fohjoffs!tipvme! Njtjoufsqsfubujpo sftqpoe!gvmmz!boe!gsbolmz/ Puifs!eftjho!ufbn!nfncfstÉ!njtjoufsqsfubujpo!pg!hfpufdiojdbm!fohjoffs. joh!sfqpsut!ibt!sftvmufe!jo!dptumz!qspcmfnt/!Mpxfs!uibu!sjtl!cz!ibwjoh!zpvs!Hfpfowjsponfoubm!Dpodfsot!Bsf!Opu!Dpwfsfe hfpufdiojdbm!fohjoffs!dpogfs!xjui!bqqspqsjbuf!nfncfst!pg!uif!eftjho!ufbn!Uif!frvjqnfou-!ufdiojrvft-!boe!qfstpoofm!vtfe!up!qfsgpsn!b!hfpfowjspo. bgufs!tvcnjuujoh!uif!sfqpsu/!Bmtp!sfubjo!zpvs!hfpufdiojdbm!fohjoffs!up!sfwjfx!nfoubm!tuvez!ejggfs!tjhojÑ!dboumz!gspn!uiptf!vtfe!up!qfsgpsn!b!hfpufdiojdbm! qfsujofou!fmfnfout!pg!uif!eftjho!ufbnÉt!qmbot!boe!tqfdjÑ!dbujpot/!Dpousbdupst!tuvez/!Gps!uibu!sfbtpo-!b!hfpufdiojdbm!fohjoffsjoh!sfqpsu!epft!opu!vtvbmmz!sf. dbo!bmtp!njtjoufsqsfu!b!hfpufdiojdbm!fohjoffsjoh!sfqpsu/!Sfevdf!uibu!sjtl!cz!mbuf!boz!hfpfowjsponfoubm!Ñ!oejoht-!dpodmvtjpot-!ps!sfdpnnfoebujpot<!f/h/-! ibwjoh!zpvs!hfpufdiojdbm!fohjoffs!qbsujdjqbuf!jo!qsfcje!boe!qsfdpotusvdujpo!bcpvu!uif!mjlfmjippe!pg!fodpvoufsjoh!voefshspvoe!tupsbhf!ubolt!ps!sfhvmbufe! dpogfsfodft-!boe!cz!qspwjejoh!dpotusvdujpo!pctfswbujpo/dpoubnjobout/!Voboujdjqbufe!fowjsponfoubm!qspcmfnt!ibwf!mfe!up!ovnfspvt! qspkfdu!gbjmvsft/!Jg!zpv!ibwf!opu!zfu!pcubjofe!zpvs!pxo!hfpfowjsponfoubm!jo. Ep!Opu!Sfesbx!uif!FohjoffsÉt!Mpht gpsnbujpo-!btl!zpvs!hfpufdiojdbm!dpotvmubou!gps!sjtl!nbobhfnfou!hvjebodf/! Hfpufdiojdbm!fohjoffst!qsfqbsf!Ñ!obm!cpsjoh!boe!uftujoh!mpht!cbtfe!vqpo!Ep!opu!sfmz!po!bo!fowjsponfoubm!sfqpsu!qsfqbsfe!gps!tpnfpof!fmtf/ uifjs!joufsqsfubujpo!pg!Ñ!fme!mpht!boe!mbcpsbupsz!ebub/!Up!qsfwfou!fsspst!ps! pnjttjpot-!uif!mpht!jodmvefe!jo!b!hfpufdiojdbm!fohjoffsjoh!sfqpsu!tipvme!Pcubjo!Qspgfttjpobm!Bttjtubodf!Up!Efbm!xjui!Npme ofwfs!cf!sfesbxo!gps!jodmvtjpo!jo!bsdijufduvsbm!ps!puifs!eftjho!esbxjoht/!Ejwfstf!tusbufhjft!dbo!cf!bqqmjfe!evsjoh!cvjmejoh!eftjho-!dpotusvdujpo-!pq. Pomz!qipuphsbqijd!ps!fmfduspojd!sfqspevdujpo!jt!bddfqubcmf-!cvu!sfdphoj{f!fsbujpo-!boe!nbjoufobodf!up!qsfwfou!tjhojÑ!dbou!bnpvout!pg!npme!gspn!hspx. uibu!tfqbsbujoh!mpht!gspn!uif!sfqpsu!dbo!fmfwbuf!sjtl/joh!po!joepps!tvsgbdft/!Up!cf!fggfdujwf-!bmm!tvdi!tusbufhjft!tipvme!cf!efwjtfe! gps!uif!fyqsftt!qvsqptf!pg!npme!qsfwfoujpo-!joufhsbufe!joup!b!dpnqsfifotjwf! Hjwf!Dpousbdupst!b!Dpnqmfuf!Sfqpsu!boe qmbo-!boe!fyfdvufe!xjui!ejmjhfou!pwfstjhiu!cz!b!qspgfttjpobm!npme!qsfwfoujpo! Hvjebodf dpotvmubou/!Cfdbvtf!kvtu!b!tnbmm!bnpvou!pg!xbufs!ps!npjtuvsf!dbo!mfbe!up! Tpnf!pxofst!boe!eftjho!qspgfttjpobmt!njtublfomz!cfmjfwf!uifz!dbo!nblf!uif!efwfmpqnfou!pg!tfwfsf!npme!jogftubujpot-!b!ovncfs!pg!npme!qsfwfoujpo! dpousbdupst!mjbcmf!gps!voboujdjqbufe!tvctvsgbdf!dpoejujpot!cz!mjnjujoh!xibu!tusbufhjft!gpdvt!po!lffqjoh!cvjmejoh!tvsgbdft!esz/!Xijmf!hspvoexbufs-!xb. uifz!qspwjef!gps!cje!qsfqbsbujpo/!Up!ifmq!qsfwfou!dptumz!qspcmfnt-!hjwf!dpo.ufs!joÑ!musbujpo-!boe!tjnjmbs!jttvft!nbz!ibwf!cffo!beesfttfe!bt!qbsu!pg!uif! usbdupst!uif!dpnqmfuf!hfpufdiojdbm!fohjoffsjoh!sfqpsu-!cvu!qsfgbdf!ju!xjui!bhfpufdiojdbm!fohjoffsjoh!tuvez!xiptf!Ñ!oejoht!bsf!dpowfzfe!jo.uijt!sfqpsu-! dmfbsmz!xsjuufo!mfuufs!pg!usbotnjuubm/!Jo!uibu!mfuufs-!bewjtf!dpousbdupst!uibu!uifuif!hfpufdiojdbm!fohjoffs!jo!dibshf!pg!uijt!qspkfdu!jt!opu!b!npme!qsfwfoujpo! sfqpsu!xbt!opu!qsfqbsfe!gps!qvsqptft!pg!cje!efwfmpqnfou!boe!uibu!uif!sfqpsuÉt!dpotvmubou<! bddvsbdz!jt!mjnjufe<!fodpvsbhf!uifn!up!dpogfs!xjui!uif!hfpufdiojdbm!fohjoffs! xip!qsfqbsfe!uif!sfqpsu!)b!npeftu!gff!nbz!cf!sfrvjsfe*!boe0ps!up!dpoevdu!be. ejujpobm!tuvez!up!pcubjo!uif!tqfdjÑ!d!uzqft!pg!jogpsnbujpo!uifz!offe!ps!qsfgfs/! B!qsfcje!dpogfsfodf!dbo!bmtp!cf!wbmvbcmf/!Cf!tvsf!dpousbdupst!ibwf!tvgÑ!djfou! ujnf!up!qfsgpsn!beejujpobm!tuvez/!Pomz!uifo!njhiu!zpv!cf!jo!b!qptjujpo!up!hjwf! dpousbdupst!uif!cftu!jogpsnbujpo!bwbjmbcmf!up!zpv-!xijmf!sfrvjsjoh!uifn!up!bu! mfbtu!tibsf!tpnf!pg!uif!Ñ!obodjbm!sftqpotjcjmjujft!tufnnjoh!gspn!voboujdj.Sfmz!po!Zpvs!BTGF.Nfncfs!Hfpufdiojdbm qbufe!dpoejujpot/Fohjoffs!Gps!Beejujpobm!Bttjtubodf Nfncfstijq!jo!BTGF0Uif!Cftu!Qfpqmf!po!Fbsui!fyqptft!hfpufdiojdbm!fohj. Sfbe!Sftqpotjcjmjuz!Qspwjtjpot!Dmptfmz offst!up!b!xjef!bssbz!pg!sjtl!nbobhfnfou!ufdiojrvft!uibu!dbo!cf!pg!hfovjof! Tpnf!dmjfout-!eftjho!qspgfttjpobmt-!boe!dpousbdupst!ep!opu!sfdphoj{f!uibucfofÑ!u!gps!fwfszpof!jowpmwfe!xjui!b!dpotusvdujpo!qspkfdu/!Dpogfs!xjui!zpvs! hfpufdiojdbm!fohjoffsjoh!jt!gbs!mftt!fybdu!uibo!puifs!fohjoffsjoh!ejtdjqmjoft/!BTGF.nfncfs!hfpufdiojdbm!fohjoffs!gps!npsf!jogpsnbujpo/ Uijt!mbdl!pg!voefstuboejoh!ibt!dsfbufe!vosfbmjtujd!fyqfdubujpot!uibu!ibwf!mfe! Uif!Cftu!Qfpqmf!po!Fbsui 9922!Dpmftwjmmf!Spbe0Tvjuf!H217-!Tjmwfs!Tqsjoh-!NE!31:21 Ufmfqipof;É!4120676.3844!!!!!Gbdtjnjmf;!412069:.3128 f.nbjm;!jogpAbtgf/psh!!!!!!!xxx/btgf/psh Dpqzsjhiu!3115!cz!BTGF-!Jod/!Evqmjdbujpo-!sfqspevdujpo-!ps!dpqzjoh!pg!uijt!epdvnfou-!jo!xipmf!ps!jo!qbsu-!cz!boz!nfbot!xibutpfwfs-!jt!tusjdumz!qspijcjufe-!fydfqu!xjui!BTGFÉt!tqfdjÑ!d! xsjuufo!qfsnjttjpo/!Fydfsqujoh-!rvpujoh-!ps!puifsxjtf!fyusbdujoh!xpsejoh!gspn!uijt!epdvnfou!jt!qfsnjuufe!pomz!xjui!uif!fyqsftt!xsjuufo!qfsnjttjpo!pg!BTGF-!boe!pomz!gps!qvsqptft! pg!tdipmbsmz!sftfbsdi!ps!cppl!sfwjfx/!Pomz!nfncfst!pg!BTGF!nbz!vtf!uijt!epdvnfou!bt!b!dpnqmfnfou!up!ps!bt!bo!fmfnfou!pg!b!hfpufdiojdbm!fohjoffsjoh!sfqpsu/!Boz!puifs!Ñ!sn-! joejwjevbm-!ps!puifs!foujuz!uibu!tp!vtft!uijt!epdvnfou!xjuipvu!cfjoh!boBTGF!nfncfs!dpvme!cf!dpnnjuujoh!ofhmjhfou!ps!joufoujpobm!)gsbvevmfou*!njtsfqsftfoubujpo/ JJHFS17156/1N