Loading...
HomeMy WebLinkAboutSW5201101_Application_20201208IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will sheet flow across the property to existing wetlands and streams 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Tar-Pamilico River basin. 4. Total Property Area: 17.13 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 17.13 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHM line, and coastal zvetlands landzvard from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (B UA). Non -coastal wetlands landzvard of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 23.9 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormzater BMP. For lozv density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Coole Creek _ Stream Class * WS-IV; NSW Stream Index Number * 28-24 Total Drainage Area (so 17.13 On -site Drainage Area (so 17.13 Off -site Drainage Area (so N/A Proposed Impervious Area** (so 178,160 % Impervious Area** (total) 23.9% Impervious— Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so N/A On -site Streets (so N/A On -site Parking (so N/A On -site Sidewalks (so N/A Other on -site (so 39,281 Future (so 138,879 Off -site (so 0 Existing BUA*** (so 0 Total (so: 178,160 Stream Class and Index Number can be determined at: http.aortal.rtcdeazr.or /zvg eh/zvq/ps/cst%lassif ications Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *"* Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6