HomeMy WebLinkAboutNCC205520_ESC Approval Submitted_20201209ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quality
March 12, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
NVR, Inc. / Ryan Homes
Attention: Joe Mosca, Production Manager
13924 Professional Center Drive, Suite 100
Huntersville, North Carolina 28078
RE: Project Name: Holcomb Woods Phase 2 — Supplemental EC Plan For Ryan Homes, Lots
220 — 223 & 345 — 356 (16 Lots Total)
Acres Approved: 3.6
Project ID: CABAR-2020-056
County: Cabarrus
City: Harrisburg
Address: Harvest Gold Drive
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: NVR, Inc. / Ryan Homes
Date Received by LQS: March 02, 2020
Plan Type: New
Dear Mr. Mosca,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain
the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette. lucaskncdenr. gov
or Paul Clark at Paul. clark(2ncdenr.gov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
NORT�CARQ�UNA
Deparb—d of ERFMnenbd
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
704.663.1699
Letter of Approval with Modifications
NVR, Inc. / Ryan Homes
March 12, 2020
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office
may require revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and
would require a revised plan and additional application fee. You are requested to file an amended form if there is
any change in the information included on the form. In addition, it would be helpful if you notify this office of
the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Harris Engineering
Attention: Wayne M. Harris, PE
5200 Park Road, Suite 231
Letter of Approval with Modifications
NVR, Inc. / Ryan Homes
March 12, 2020
Page 3 of 3
Charlotte, North Carolina 28209
Inspection Department
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Holcomb Woods Phase 2 — Supplemental EC Plan For Ryan Homes, Lots
220 — 223 & 345 — 356 (16 Total Lots)
Project ID: CABAR-2020-056
County: Cabarrus
Implement the latest NCGO 1 standards for Ground Cover and Self Inspection approved April 01, 2019.
Please include these standards in future plan submittals.