HomeMy WebLinkAboutNCC192838_NOT Closeout Documents_2020120815A CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
y SEDIMENTATION INSPECTION REPORT
INSPECTION ECINSP-499855
In Compliance
CASE NUMBER: ECPC-03-2020-129674
PROJECT: PROJ-11-2019-13488 Dollar General-S NC 127
PARCEL/ADDRESS: 269914235566 5121 S NC 127 HWY, HICKORY NC 28602
START DATE: 12/03/2020 Thursday 2:04 pm
COMPLETION DATE: 12/03/2020 Thursday 2:04 pm
CONTACT LIST
Contact Person - Erosion Contrc TERAMORE CONSTRUCTION, LLC, 214 KLUMAC RD STE 101, SALISBURY NC
28144, C:7042247364 JSTRICKLAND(q),TERAMORE.NET
Land Owner FLOYD LEATHERMAN, 3446,
PICTURES: PRINTS: SLIDES: ❑ DIGITAL: VIDEO:
WEATHER & SOIL CONDITIONS
sunny, cool, soil workable
PROGRESS INSPECTION
IS SITE CURRENTLY UNDER NOTICE OF VIOLATION?
VIOLATIONS
❑ a. No approved plan 31-4 (c)
❑ b. Failure to follow approved plan 31-5 (f)
❑ c. Failure to submit revised plan 31-6 (m)
❑ d. Failure to provide adequate groundcover 31-5 (d)
❑ e. Insufficient measures to retain sediment on site 31-7 (e)
❑ f. Failure to take all reasonable measures 31-4 (d)
PHASE OF GRADING: Final grading complete
POTENTIAL NPDES PERMIT VIOLATION? No
m
❑ g. Inadequate buffer zone 31-5 (a)(1)
❑ h. Graded slopes and fills too steep 31-5 (b)
❑ i. Unprotected exposed slopes 31-5 (b)
❑ j. Failure to maintain erosion control
❑measures 31-13
k. Notice of activity initiation 31-6 (j)
❑ I. Other (describe)
HAS SEDIMENTATION DAMAGE OCCURED? No DEGREE OF DAMAGE:
❑ Lake/natural watercourse on the tract ❑ Other property
❑ Lake/natural watercourse off the tract ❑ Road/walkway
INSPECTION REPORT IN CASE FILE DUE TO Sent to person financially responsible
DATE GIVEN/SENT
CORRECTIVE ACTIONS NEEDED
CONCLUSION
COMMENTS continue to maintain ground cover
E9 - rinspsedimentationreport 12/04/2020 14:05 Page 1 of 2
$A cOG CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
SEDIMENTATION INSPECTION REPORT
INSPECTION ECINSP-499855
In Compliance
Permanent ground cover sufficient to restrain erosion has been established.
No additional self -monitoring or self -inspections are required.
Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated.
REPORT BY Toni Norton
E9 - rinspsedimentationreport 12/04/2020 14:05 Page 2 of 2