Loading...
HomeMy WebLinkAbout20201080 Ver 1_CAMA Major Permit_20201208Permit Class NVW Permit Number 110-20 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission r r t nit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to James & Tammy York, 204 Leonard Road, Pilot Mountain, NC 27041 Authorizing development in Brunswick County, adj. to manmade canal off AIWW, at 407 6th Street, in Sunset Beach . as requested in the permittee's application dated 7/12/20, including attached workplan drawings (3), Sheets 2 and 2a of 3, both dated 7/9/20 and Sheet 3 of 3, dated 7/12/20. This permit, issued on November 12, 2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 2) No backfill material shall be placed within 30 feet of the normal high water line, except that which will be used to backfill the area behind the permitted bulkhead. 3) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. 4) No vegetated wetlands shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2023 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee James & Tammy York Permit No. 110-20 Page 2 of 3 ADDITIONAL CONDITIONS 5) No open water shall be excavated or filled, even temporarily. 6) All fill material to be placed below normal high-water level shall be confined behind the permitted bulkhead. 7) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 8) The bulkhead shall be constructed prior to any backfilling activities 9) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 10) All backfill material shall be clean and free of any pollutants except in trace quantities. 11) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. Sedimentation and Erosion Control 12) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third parry without the written approval of the Division of Coastal Management. 15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 16) All debris associated with this development shall be contained within the authorized project area and removed to an appropriate upland refuse disposal site. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level.