Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20100311 Ver 1_Approval Letter_20100909NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
North Carolina Division of Water Quality
Transportation Permitting Unit
In-Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Waters Permit
Modification
Project NamefIIP Project No.: Y-tp iDannQdufkcy k ' n
Date: f / 1
DOT Division: K) C,oun't`y: ,?'•l_I afeU b DWQ Project No./Permit Type: ?hO I I /I?ta4?rd r
DOT Staff: 17 iry? ?:IYLa pow -, DWQ Staff: _i 7fcll?A ry" 4/A4Q-
ACE Staff: DWQ Regional Office:
Modification Description:
1 ar a?cL Qaaa c>ae.?-
r
aLIL
0:'LLPrap --
Z. k a, A+O?L^ unbi
Modification Sketch:
Transportation and Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Ralegh, North Carolina 27604
Phone: 919-733.17861 FAX: 919-733-6693
Internet httpl/h2o.encstate.nc.uslnavetlandsl
One
NorthCarolina,
Naturally
An Equal opportunity 1 Affirmative Acton Employer
In-Field Modification F ? ''.
Page 2 of 3 /
,rl;
r
This in-field modification is required for the following reason(s):
? The information contained in the application or presented in support thereof is incorrect in the
following manner:
Conditions under which the original certification was issued have changed in the following
manner: n . - - ... _ -t _i 1 n r IL 1 ... n
in ' QIVLW County. The project shall be constructed as described in the Modification Description and
Sketch on Page 1 of this document dated q /0I /10 to improve/construct the section of
SP, lb94 that-extends-from f U A CA A4 V, -to, The approved
design is that described in the Modification Description and Modification Sketch on Page 1 of this document dated
r/?} 1 d Any further changes to the original Water Quality Certification dated Jt Al h O may require a
formal written modification request. e
The description of the proposed action provides adequate assurance that the proposed action in the t.?t2akif-1
River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality
:standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not
violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in
accordance with the application and conditions hereinafter set forth. Should your project change, you are required
to notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of ,
this Certification and approval letter, and is thereby responsible for complying with all the conditions. For this
approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should
obtain all other federal, state or local permits before proceeding with your project including (but not limited to)
Sediment and Erosion control, Coastal Stormwater, Non-discharge and Water Supply watershed regulations. This
Modification Approval shall expire on the same day as the expiration date of the corresponding Corps of Engineers
Permit.
Condition(s) of Modification Approval:
1. As-built drawings of the proposed action shall be submitted to the NC DWQ Transportation Permitting
Unit within 30-days of the completion of the action.
2. All the authorized activities and conditions of the certification associated with the original Water Quality
Certification dated 6 /4/10 and all other corresponding modifications still apply except where .
superceded by this certification.
This in-field modification is valid only if issued by an authorized agent of the NC Division of Water Quality,
Transportation Permitting Unit'.
In-Field Modification
Page 3of3 y•
3.
Failure to construct the proposed action as described in the Modification Description and Sketch on Page 1 of this
document and/or violations of any condition herein set forth may result in revocation' of-this.modification approval
and may result in criminal and/or civil penalties. This modification approval shall become null and void unless the
above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. If the
Corps of Engineers requires a formal written modification to the 404 permit for the proposed action, then NC DWQ
must require a formal written modification to the 401 WQC, and therefore, this infield modification is invalid. If
additional (wetland, stream, buffer) impacts for this project (now or in the future) exceed (one acre, 150 linear
feet, or one-third of an acre/150 linear feet, respectively), or if mitigation is required above and beyond the
current mitigation requirements for this project, this in-field modification is invalid and a formal written
modification is required.
This in-field modification is effective upon the date the last party signs this document. This in-field modification is
made upon mutual agreement between DOT and DWQ as indicated by the signatures below and is, therefore, not
subject to appeal by either party. Appeals by third parties must be made within sixty (60) days of notification
pursuant to the contested case provisio ns of the Administrative Procedure Act, N.C. Gen. Stat_ § 15OB-23 et seg.
r
DWQ Staff Signature:
Date: ul /W 1 !t) \\
DOT Staff Signature:
O
Date: S. V>?
Staff Signature:
Date:
- An authorized abent of the Transportation Permitting Unit is defined iiDWQ staff that are DOT-funded and review and
issue 401. Water Quality Certifications for DOT projects. These staff include Central Office and Regional Office personnel.
c .
1
BRIDGE LOCATION
0
PEE` PUE
- - PUE PUE
EXIST ROW
?,w 302 0 26' o
5 + 3 -?-
E l8" RCP c
PROP BASE PROP BASE
DITCH SEE DITCH SEE
DETAIL 111 DETAIL 11
DETAIL II
SPECIAL LATERAL BASE DITCH
( Not to Scale)
Natural
d
? Natural
2'
Groun y T
D Ground
/ l ,-Coir Fiber
Coir Fiber y B Matting
Matting
Class a Rip-Rap
Embeded in Soil
Min. D= 2 Ft.
B= 2 Ft.
FROM STA. 19+75 TO STA. 20+10 LEFT OF -L-
DETAIL III
STANDARD BASE DITCH
( Not to Scale)
Natural Natural
Ground 2,y 2d Ground
D
Filter Fabric-/ B Min. D= 1,5 Ft.
B= 5 Ft.
CLASS IIRIP RAP
orr
cnuNE FLOW
LARGE STONES ^
O?
FILTER FARRICl
STRFAM ?rToo EARTH
MATERIAL
Type of Liner = Class IIRip-Rap
FROM STA.19+45 TO STA. 19+75 RIGHT OF -L-