HomeMy WebLinkAboutNC0036935_Report - Technical Review per A.3 of Permit - Submittal of Scope_2020120312/9/2020 Mail - Bennett, Bradley - Outlook
https://outlook.office365.com/mail/search/id/AAMkADg1YjdhZmIxLTMzMGYtNGU3Ni1hNGU4LTY3M2E1ODhmOGQxYgBGAAAAAACylgPJqHeWQptj…1/2
Re: [External] Re: A.3. Due Bullet Points on WWTP/Collection system NC0036935
Pine Mountain <pinemountainpoa@gmail.com>
Thu 12/3/2020 1:25 PM
To: Wiggs, Linda <linda.wiggs@ncdenr.gov>
Cc: Donald Price <drpriceconsulting@outlook.com>; Edie <ediestitt@gmail.com>; Davidson, Landon <landon.davidson@ncdenr.gov>; Bennett, Bradley
<bradley.bennett@ncdenr.gov>; Boss, Daniel J <daniel.boss@ncdenr.gov>
1 attachments (317 KB)
2020-Dec 2 WWTPA.(3) of NPDES NC0036935.pdf;
CAUTION: External email. Do not click links or open a achments unless you verify. Submit all suspicious email using the Phish Alarm bu on or as an a achment to Report
Spam.
Attached is the signed A.(3). of NPDES NC0036935
Thank You,
Edie Stitt
President, PMPOA, Inc.
On Wed, Dec 2, 2020 at 1:47 PM Wiggs, Linda <linda.wiggs@ncdenr.gov> wrote:
Don and Edie,
We will review the report and respond. We will need a signed copy of the submi al, will you be sending that via US Mail? Edie you can sign it, scan it
and send it via email if that is easier.
The process controls are due each month by the 10th. You can send those to me via email.
Thank you,
From: Donald Price [mailto:drpriceconsul ng@outlook.com]
Sent: Wednesday, December 2, 2020 12:36 PM
To: Wiggs, Linda <linda.wiggs@ncdenr.gov>; Pine Mountain <pinemountainpoa@gmail.com>; Edie <edies @gmail.com>
Cc: Davidson, Landon <landon.davidson@ncdenr.gov>; Benne , Bradley <bradley.benne @ncdenr.gov>; Boss, Daniel J <daniel.boss@ncdenr.gov>;
Donald Price <drpriceconsul ng@outlook.com>
Subject: [External] Re: A.3. Due Bullet Points on WWTP/Collec on system NC0036935
Importance: High
CAUTION: External email. Do not click links or open a achments unless you verify. Send all suspicious email as an a achment to report.spam@nc.gov
12/9/2020 Mail - Bennett, Bradley - Outlook
https://outlook.office365.com/mail/search/id/AAMkADg1YjdhZmIxLTMzMGYtNGU3Ni1hNGU4LTY3M2E1ODhmOGQxYgBGAAAAAACylgPJqHeWQptj…2/2
Linda,
Sorry for the delay, but thought this was also due by Dec. 10th as is our process control plan? But, please see a ached and let us know if you have
ques ons or need addi onal informa on. With implemen ng the addi onal
stream monitoring requirements and process control plan for the WWTP things have go en very busy. You take
that with the way Environlink le the facility/system, and I had my hands full. But, it is ge ng be er, and sample
results are not showing alot of difference between up and down streams, but I think spring will tell more. Dis get flow meter installed as requested
but took a li le longer due to shipping and receiving of unit. WWTP opera ons are coming along okay, and have made some arrangements to get
sludge pumped from the WWTP. Hope to get this completed within the next week. Please let me know if you have ques ons. Don
From: Wiggs, Linda <linda.wiggs@ncdenr.gov>
Sent: Wednesday, December 2, 2020 8:57 AM
To: Donald Price <drpriceconsul ng@outlook.com>; Pine Mountain <pinemountainpoa@gmail.com>; Edie <edies @gmail.com>
Subject: A.3. Due
Hi Don and Edie,
We have not received the evalua on report as noted below. It was due December 1, 2020. We have had discussions and you’ve sent components of this
report, but we have not received the complete report yet.
A. (3.) TREATMENT SYSTEM EVALUATION AND COMPLIANCE
[G.S. 143-215.3(a)(2)]
The permi ee shall evaluate and report on the condi on and opera on of the wastewater treatment system. Procedures for the evalua on and
report shall be provided to staff in the Asheville Regional Office of the Division of Water Resources for their approval within one month of the
effec ve date of this permit.
December 2, 2020
NC Dept. of Environmental Quality -Div. of Water Resources
Asheville Regional Office
2090 US 70 Highway 70
Swannanoa, N.C. 28779
Attn. Mr. G. Landon Davidson, PG
Regional Supervisor, Water Quality Regional Operations Section
Dear Mr. Davidson,
Subject: Pine Mtn. Lakes WWTP and Sewer Collection
System-NPDES NC0036935-Burke County
Treatment System Evaluation per Section
A.(3}. of NPDES NC0036935
Per conditions in Pine Mtn . Lakes recently issued NPDES permit NC0036935 in Burke County; Pine Mountain Lakes &
POA offer the following 'Bullet Points', as an evaluation of the current WWTP and Sewer Collection system serving Pine
Mtn Lakes POA (property owners association) to meet section A.(3) NPDES permit requirements. This document is set to
list WWTP area first and then Sewer Collection system. We have replaced Environlink as our operator and secured the
wastewater treatment and sewer collection services from Mr. Don Price, Grade 4 Bio. Certification 10536, and Grade 4
Collection certification of 991335. He is also doing our well water system.
WWTP-
• A current review of the operation of the 20,000 GPO Package WWTP and Chlorine dissipation pond is under way
with the inclusion of Influent BOD & TSS monitoring to determine the loading rates and characteristics on the
WWTP. After loading rates can be determined, a determination can then be made on solids/sludge production
/accumulation, and a more defined wasting schedule determined. This should take about 90 days and is weather
dependent and dependent on system usage, which as you are aware can be seasonal. There are only about 30
townhouses, the motel/Christian center, POA office and Golf shop on the WWTP. The process Control plan and
reporting document referenced in our renewed permit has been implemented with the addition of a time
in/time out column for the ORC.
• The current chlorine dissipation pond, as it's referred to, but also functions as a polishing pond is also currently
being reviewed for loading and operation. As you are aware, there is an accumulation of 'Duck Weed' on the
surface of the pond. Plans are being made to manually remove the duckweed and could possibly take until
spring of 2021, late March or April depending on weather and additional outside contactor assistance that may
be needed. Other issues with the polishing pond are to get duckweed off and create conditions to prevent it
from re-occurring. My thought is to add diffused aeration to the pond to accomplish this . The question is, will
Pine Mtn. Lakes be required to apply for and receive an A to C (authorization to construct) prior to adding
aeration to the pond? The addition of aeration would also serve as a deterrent to animals and varmints taking
up residence in and around the pond. Pine Mtn. would also like to inquire about being allowed to shore up and
secure the pond's embankment and impoundment area adjacent to White Oak creek. This area is showing
indications or potential breech if efforts aren't made to prevent this. Is there a Nationwide 401 permit Pine Mtn.
could follow to address this? Finally, in regards to adding a liner to the pond, after review and determination of
installing a liner, will Pine Mtn. be required to apply for and receive an A to C for this?
Pine Mtn. Lakes Treatment System, NC0036935
Evaluation. Page 2
WWTP Cont'd.
• Stand-by generator-The current stand-by generator is being evaluated for possible 're-build/retrofit', but this
may not be feasible due to age and condition. Don Price has been researching for possible used units that could
be used to meet stand-by power requirements. This may take a little while, would request a 6 month time frame
to get completed.
• Effluent flow meter -an ISCO model 3010 ultrasonic flow meter was installed on Nov. 30, 2020, and has been
put in service on same day . It does continuous recording on a 'flash drive', which is changed out on a 30 day
interval. We have been taking a visual reading and recording flow for the day . Prior to this, Don Price was
reading staff gauge and weir on effluent WWTP and making estimate based on reading .
Sewer Collection System
• Plans to conduct a visual inspection of the sewer collection system and associated manholes is planned for early
spring 2021, when weather conditions allow for and volunteer assistance can be scheduled . Pi ne M tn. will also
secure dye tablets to conduct dye testing of the manholes and cleanouts within the system, with additional
focus being made to areas located adjacent to and in close proximity to any streams . Pine Mtn. will request
smoke test machine loan from ARO-Water Quality Regional Operations section, to conduct in-house smoke
testing in early spring 2021. In conducting visual observations and dye testing, Pine Mtn. plans to GPS manholes
and review/update existing sewer maps to follow requirements of 15A NCAC 02T .0403, Permittin g by regulation
(deemed permitted). Pine Mtn. plans to use this as guidance in operation of the sewer collecti o ns sy stem within
its purview. Additionally, Pine Mtn. plans to develop and i mplement a 'Sewer Use Policy/O rdinanc e' for the
existing collection system within its covenant and allowance s. After smoke testing, dye test ing, and evaluation of
data from the efforts are obtained, Pine Mtn will provide a list of corrective actions and tim e line for their
implementation . An estimated date for completion of this process is early to mid-summer 2021, about early
June-July period .
Pine Mtn. request input from the Asheville Regional Office regarding this plan to meet section A.(3 ). of l\JP DE S permit
NC0036935 and the other items listed above. Should you have questions or need additional informa tion, p l .:ase contact
828-437-4894 or email pinemountainpoa@gmail.com . We look forward to hearing from you an d you r assis tance in
helping us meet our NPDES permit and complying with the regulations.
Sincerely,
fd \\h ~~
Edith Stitt, Pine Mtn. POA President
Cc: Linda Wiggs -NCDEQ-DWR-ARO
Don Price-Pine Mtn. Lakes WWTP ORC