Loading...
HomeMy WebLinkAbout20201728 Ver 1_PreFiling Acknowledgement Email_20201207Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, December 7, 2020 3:57 PM To: jonathan.herman@mcgillassociates.com Cc: Goss, Stephanie Subject: Pre -Filing Meeting Request Acknowledgement - Pine Level Sewer Force Main Replacement - 20201728 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Pine Level Sewer Force Main Replacement that you submitted on 11/11/2020. The ID number for that project is 20201728, Version 1. Reviewer Contact Information: Reviewer: Stephanie Goss Email: stephanie.goss@ncdenr.gov Reviewing Office: Raleigh Regional Office - (919) 791-4200 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201728 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 11/11/2020 Contact Name * Jonathan Herman Contact Email Address* jonathan.herman@mcgillassociates.com Project Name* Pine Level Sewer Force Main Replacement Project Owner* Johnston County Government Project County* Johnston Owner Address: Street Address P.O. Box 1049 Address Line 2 aty State / Province / Region Smithfield North Carolina Fbstal / Zip Code Country 27577 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * The Johnston County — Pine Level Sewer Force Main Replacement project proposes approximately 20,300 linear feet of new force main sewer line from the existing Pine Level pump station on North Peedin Ave, following an existing gravity sewer line, and ultimately discharging into an existing manhole adjacent to Outlet Center Dr. This will increase the capacity of the sanitary sewer collection system for Pine Level allowing for the town to grow further in the future as they are nearing their Flow capacity. The project is located within the municipal and extra -territorial limits of the Town of Pine Level and Johnston County with some minor cut through of properties within the Town of Selma Most of the lines will be installed adjacent to existing roads with some being installed cross country following the existing gravity sewer. Most locations where there are existing streams and wetlands there are proposed bore with encasement pipes and horizontal directional drill to avoid those conflicts. In two incidences open cut with stream bypass is proposed due to the constraints of the existing conditions. The installation of the force main is expected to disturb a total of 13.32 acres of soil, primarily in the excavation and stockpiling of dirt associated with the installation of the proposed force main. Please give a couple of dates you are available for a meeting. 11 /19/2020 11 /20/2020 Please attach the documentation you would like to have the meeting about. 2020-10-21 - Pine Level FM Final Drawing Set 40.43MB - ISSUED FOR PERMITS.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature C11 1111Y411PkIl � tpwc?w Submittal Date 11/11/2020