HomeMy WebLinkAbout20201788 Ver 1_PreFiling Acknowledgement Email_20201208Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, December 8, 2020 8:11 AM
To: lauren.norris-heflin@timmons.com
Cc: Goss, Stephanie
Subject: Pre -Filing Meeting Request Acknowledgement - Hwy 78 South - 20201788 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Hwy 78 South that you
submitted on 11/19/2020. The ID number for that project is 20201788, Version 1.
Reviewer Contact Information:
Reviewer: Stephanie Goss
Email: stephanie.goss@ncdenr.gov
Reviewing Office: Raleigh Regional Office - (919) 791-4200
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201788 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 11/19/2020
.....................................................................................................................................................................................................................
Contact Name * Lauren Norris -Heflin
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
lauren.norris-heflin@timmons.com
Hwy 78 South
Racoon Path Holdings, LLC
Lee
Street Address
Tramway Road (Hwy 78)
Address Line 2
aty
Sanford
Fbstal / Zip Code
27330
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Stephanie Goss
Please give a brief project description below.
In addition to this electronic pre -filing meeting request, an email with Pre -
Application Consultation information was sent to the DWR and USACE. The
corresponding memo is attached.
The proposed Hwy 78 South project, located between Tramway Road (Hwy
78) and Lemon Springs Road in Sanford, Lee County, NC consists of 111
single-family residential lots, stormwater control measures, and associated
amenities (i.e. road crossings, public utility connections). For the purpose
of 404/401 permitting, the project area consists of approximately 58.1-
acres south of Hwy 78 and west of Lemon Springs Road and Harward
Drive. The Site is occupied by converted agricultural and silvicultural land
with successional forests ranging from 10-15 years old, as well as mature
mixed hardwood forest. The Site was previously included in a larger project
area totaling approximately 132-acres which included additional parcels to
the north of Tramway Road. These areas to the north have since been
separated into a separate, single and complete project with independent
utility.
Proposed impacts to jurisdictional features within the Site are associated
with road crossings, public sewer line installation, and grading. Sewer line
placement is required by the local municipality and will be maintained by
the municipality following construction. Utility connections between the Hwy
78 South Site and parcels to the north (across Hwy 78) will be coordinated
in a way that allows for easier and more efficient planning of utility
placement between the two proposed projects. However, neither project is
dependent upon the other for utility connection. The project plans are
currently underway and site plans for permitting are anticipated around
early 2021. Preliminary plans with anticipated impact locations and
amounts are attached.
Impacts to wetlands and streams delineated on -Site should be minimal and
limited to those necessary to install necessary utility connections, road
crossings, and grading (where necessary). Four (4) of the five (5)
proposed wetlands impacts are associated with road and utility line
crossings. Of those, one road crossing will also require stream impacts for
culvert installation. The remaining proposed wetland impacts is associated
with grading necessary for stabilization of a residential lot. Impacts are
limited to those necessary for connection to public roads and utilities, and
project design utilized the confirmed delineation to place impacts where the
minimum amount of impact would occur.
In total, the proposed project should involve approximately 0.338-acres
(14,418-sq. ft.) of wetland impacts and 122-ft of stream impact. Impacts are
anticipated to result from culvert installation, dissipator pad installation, and
grading, and have not yet been separated by temporary and permanent.
Please give a couple of dates you are available for a meeting.
11 /23/2020
11 /25/2020
11 /30/2020
12/1 /2020
12/7/2020
Please attach the documentation you would like to have the meeting about.
May 78 South_Pre-application meeting memo
7.79MB
(reduced).pdf
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
lz_�w le
Submittal Date 11/19/2020