Loading...
HomeMy WebLinkAbout20201888 Ver 1_PreFiling Acknowledgement Email_20201207Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, December 7, 2020 12:31 PM To: mackenzie.richards@kimley-horn.com Cc: Trone, Rick V Subject: Pre -Filing Meeting Request Acknowledgement - Emergency Watershed Protection (EWP) Streambank Repair: Site 1 and Site 2 - 20201888 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Emergency Watershed Protection (EWP) Streambank Repair: Site 1 and Site 2 that you submitted on 12/4/2020. The ID number for that project is 20201888, Version 1. Reviewer Contact Information: Reviewer: Rick Trone Email: rick.trone@ncdenr.gov Reviewing Office: Central Office - (919) 707-9000 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201888 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 12/4/2020 Contact Name* Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Mackenzie Richards (Kimley-Horn) mackenzie.richards@kimley-horn.com Emergency Watershed Protection (EWP) Streambank Repair: Site 1 and Site 2 The City of Durham - Department of Public Works Durham Street Address 101 City Hall Plaza Address Line 2 City Durham Fbstal / Zip Code 27705 State / Frovince / Fegion NC Country USA Is this a transportation project?* Yes o No Type(s) of approval sought from the DWR: 141 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express • Individual Permit F Modification • Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below.* The proposed project, Emergency Watershed Protection (EWP) Streambank Repair: Site 1 & Site 2, is located within the Ellerbe Creek riparian corridor, northeast of Interstate-85 in Durham County, North Carolina. The area surrounding the project is largely composed of residential housing and scattered commercial development. The proposed project is part of a larger undertaking that is proposing to repair and stabilize streams at four sites and to repair and maintain several existing aerial waterline and sewer crossings that experienced damage during Hurricane Florence. Site 1 and Site 2 of this larger undertaking consists of the repair and stabilization of a length of Ellerbe Creek and an unnamed tributary to Ellerbe Creek as well as the repair and maintenance of three existing aerial utility crossings. After discussions with the USACE, it is assumed that the project will qualify for authorization under both a Nationwide Permit 3 (Maintenance) and a Nationwide Permit 27 (Aquatic Habitat Restoration, Enhancement, and Establishment Activities). The proposed stream repair will include the grading of damaged and unstable stream banks to match natural channel contours, the placement of rip rap and boulder toe protection along the stream banks to provide stabilization, and the installation of rip rap embankment protection at drainage swales to prevent future erosion and sedimentation. The project is also proposing the construction of log J-hook riffles within the stream to establish grade control, facilitate sediment transport, and enhance aquatic species habitat. As part of the stream repair, stream banks that have been graded and disturbed will be replanted with live stakes, bare roots, and herbaceous plugs to promote vegetation establishment and restore the overall function of the riparian buffers. In addition, Site 1 and Site 2 of the project proposes to perform maintenance repairs on three existing aerial utility crossings that were damaged during Hurricane Florence. As part of this repair and maintenance, an existing aerial waterline crossing will be converted to an underground trenchless crossing that will be directionally drilled below the stream substrate. To repair damage at two existing aerial sewer crossings, gaps between supports and carrier pipes will be grouted in place and pipes will be properly strapped to supports. Please give a couple of dates you are available for a meeting. 12/10/2020 Please attach the documentation you would like to have the meeting about. EWP Streambank Repair_ Site 1 and Site 3.98MB 2—buffer approval.pdf SAW-2020- 1.52 MB 01176_Sites1 and2_PJD_Revised.pdf Fig 1_EWPStreams_Vicinity.pdf 671.89KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/4/2020