HomeMy WebLinkAbout20160285 Ver 3_Modification Request_20201207Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* 20160285 Version* 3 Is this project a public transportation project?* r Yes r No Reviewer List:* Rick Trone:eads\rvtrone Select Reviewing Office:* Central Office - (919) 707-9000 Does this project require a request for payment to be sent?* r Yes r No How much is r $240.00 owed? * r $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * r For the Record Only (Courtesy Copy) r New Project r Modification/New Project with Existing ID r More Information Response r Other Agency Comments r Pre -Application Submittal r Re-Issuance\Renewal Request r Stream or Buffer Appeal Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: SDP17000-Pre-filing Mtg Not Required EM.pdf Date for Meeting Request 10/29/2020 ID# 2016085 Version 3 Project Contact Information Name: Jennifer Burdette Who is subrritting the information? Email Address: burdette@mcadamsco.com Project Information 462.79KB Existing ID #: Existing Version: 20160285 2 20170001(no dashes) 1 Project Name: Oak Pointe Residential Subdivision Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Wake Please upload all files that need to be submited. Oick the upload button or drag and drop files here to attach document SDP17000-SS Stabilization Permit Mod 4.61 MB Pkg_Optimized.pdf SDP17000-IP Permit Modification Ltr- 2.83MB Stabilization.pdf Only pdf or krm files are accepted. Describe the attachments or comments: Individual Permit modification request for emergency bank stabilization and USACE modification approval letter. Sign and Submit W By checking the box and signing box below, I certify that: ■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. ■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. ■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in autonatically. MODIFICATION REQUEST > SDP-17000 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 creating experiences through experience November 16, 2020 Mr. James Lastinger Raleigh Regulatory Field Office US Army Corps of Engineers 3334 Heritage Trade Drive, 105 Wake Forest, NC 27587 Mr. Paul Wojoski 401 & Buffer Permitting Branch Division of Water Resources Archdale Bldg., 9th Floor 512 N Salisbury Street Raleigh, NC 27604 RE: Individual Permit/Certification & Buffer Authorization Modification Request Oak Pointe Residential Development USACE AID SAW-2016-00095/DWR Project #16-0285 Apex, Wake County, NC SDP-17000 Dear Mr. Lastinger and Mr. Wojoski, On behalf of Lennar Carolinas, LLC, McAdams is requesting a modification of the Individual Permit (IP) and Water Quality Certification (WQC) for the Oak Pointe Residential Development. This 58-acre project is located on the south side of Old Jenks Road, approximately 1,000 feet east of the intersection of Old Jenks Road and West Williams Street in Apex, Wake County. After the permit was issued, a sanitary sewer crossing, shown in Impact Area E from the original application (Original Overall Impact Map and Impact Area E Exhibit attached), was changed to an aerial crossing to connect to the existing sewer. The meander of the stream at the crossing location has increased dramatically in a short period of time after construction. The picture below shows the stream erosion at the pier supporting the aerial SS line. McAdams has developed the attached repair/stabilization plan (E1-E6) using a combination of non-natural armoring techniques and natural channel design. The Town of Apex has reviewed this plan and requested expedited approval to prevent a sanitary sewer line failure. MODIFICATION REQUEST > SDP-17000 creating experiences through experience 2 of 2 Photo 1: Stream eroding sanitary sewer support pier Modification of the IP and WQC are necessary to authorize an additional 95 LF of permanent stream impact and 841 SF of Zone 1 buffer impact (area of Zone 1 within limit of disturbance) to implement the stabilization plan. The existing sanitary sewer easement will be utilized to access the repair area. A pre-filing meeting request was submitted to DWR on October 29, 2020. At the end of the 30-day pre-filing meeting period, a check for modification of the 401 Individual Water Quality Certification will be provided along with any other additional information requested. As recent heavy rains have exacerbated the erosion, Lennar intends to proceed the with repair upon approval from the USACE and will obtain a 401 modification after-the-fact once the pre-filing meeting requirement is satisfied. Please do not hesitate to contact me if you have any questions about the stabilization plan or impacts requested. Sincerely, MCADAMS Jennifer Burdette, PWS Senior Environmental Scientist, Water Resources Attachments: Lennar Agent Authorization Form Town of Apex Agent Authorization Form Original Impact Map Overall & Impact Area E Impact Drawing & Details (E1-E6) cc: Ryan Akers, McAdams M WADAMS AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Current Applicant FIELDS WITH *ARE REQUIRED PIN: 0732785077 Name: Lennar Carolinas, LLC; Landon Walls, Director of Land Development Address: 1100 Perimeter Park Dr, Ste 112, Morrisville, NC 27560 *Phone: •J *Email: '����.�120z. • /UILrA 49 le4we cowl Project Name: Oak Pointe Residential Subdivision Project Number: SDP-17000 Project Manager: Ryan Akers/Jennifer Burdette US Army Corps of Engineers —Wilmington District Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Wetlands Related Consulting and Permitting To Whom It May Concern: NC Division of Water Resources 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC27604 I hereby designate and authorize The John R. McAdams Company, Inc. to act on my behalf as my agent in obtaining verification of wetland delineations and processing of permit applications for the project listed above. I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives ofthe Wilmington District, U.S. Army Corps of Engineers (Corps) and NC Division of Water Resources to enter upon the property herein described for the purpose of conducting on -site investigation and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act/Section 10 of the Rivers and Harbors Act of 1899 and/or Waters of State and/or Riparian Buffer Rules. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government ofFicials to enter the property when accompanied by The John R. McAdams Company, Inc. staff. Landon Walls *Print Applicant Director of Land Development Title (if applicable) *Signature `Dat creating experiences through experience 2905 Meddian Parkway, Durham, NC / 919. 36t. 5000 M MCADAMS AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Current rropertV Owner FIELDS WITH *ARE REQUIRED PIN: 0732783155 Name: Town of Apex Address: P O Box 250, Apex, NC 27502 *Phone: 4q ^ 3I)0 *Email: D2a/. *V0W: S AP6KAX Project Name: Oak Pointe Residential Subdivision Project Number: SDP-17000 Project Manager: Ryan Akers/Jennifer Burdette US Army Corps of Engineers —Wilmington District Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Wetlands Related Consulting and Permitting NC Division of Water Resources 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 To Whom It May Concern: I hereby designate and authorize The John R. McAdams Company, Inc. to act on my behalf as my agent in obtaining verification of wetland delineations and processing of permit applications for the project listed above. I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and NC Division of Water Resources to enter upon the property herein described forthe purpose of conducting on -site investigation and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act/Section 10 of the Rivers and Harbors Act of 1899 and/or Waters of State and/or Riparian Buffer Rules. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by The John R. McAdams Company, I staff. T06VA GP /gipPX �Adm - *Print Property Owner *Signs ure /6�(✓r ,t1nGre f %/�d Title (if applicable)° *Date zo creating experiences through experience 2905 Meddian Parkway, Durham, NC / 919. 351. 5000 50' ER ( BUFFER IMPA( AREA IMPACT AREA °'B!' YELLOW POIN-FE COURT- (50' PUBLIC R/W) 50' SiREAM — BUFFER DfPACT — AREA "C" POINTE CROSSING- (50' PUBLIC R/W) EXISTING TOWN DF- APEX 30' SANRARY SEWER EASEMEM EXIS1ING TOWN OF / PPEX 2D' WATER ( "�? EASEMENT" I . J , IMPACT AREA , F o'Al000INYR IPLA MPACT l/ _ `, ,,;+ YL REP N.T.S. OB-03-2Di6 44#s . iV es 7OM, DIOSR SN RO I �Q} 04l (so PUfi ri AD Y�xv Flvydf�` . PI �o c �J ) t 100 PLUMP rR t PWN L ,� 1()• PHASE LINE BIAP � i II .f TOWN OF APEX 100' STREAM BUFFER (TIP.) PROPOSED PFLOOR PLAIN (PER MORE SLUMMED 10/12/2DI5) .... ,.:.. ♦ 1 (so' Pueuc IXISIING TOWN OF APEX 20' WATER EASEMENT 5 �A PU'SUC Ulu l(l' EA1 N / 50' EOOF /�P �ONE 3 SUFF 3 ER TYP.) I/ ✓1,r / FUMA Im ROPWN \ ill 1 /1 Id I I eQROAN LANE ,4 l / AII "i < \< �9 < ` I ` , ` 1, ` If pp a If ZfFE« IMPACT 2 IF P0a « e (/ /'JCI AAN N LAKE ��322 �,�-guF�P.R J YSrnANU. IMPACT / AREA �2T SF / �R II I I 1 J11 ` i P AP[M \I IJ / ONE 11% EA �U065 SF �I I� / AR i � I I Ili \I t nnmea..o. I(HH-1�000 ��^� KHHt0000.ow °d11 08-03-2016 /i / I I s GRAPHIC SCALE 1 inch 40 fr.. I 5 X:\Projects\SDP\SDP-17000\Storm\Aerial Sewer Stabilization\Current Drawings\SDP17000-STR.dwg, 11/2/2020 3:10:25 PM, Garcia, Kelli OAK POINTE IMPACT DRAWINGS EXHIBIT 1 APEX, NORTH CAROLINA PROJECT NO.SDP-17000 FILENAME SDP17000-STR CHECKED BY RAS DRAWN BY KEG SCALE 1"=20' DATE 11.02.2020 The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATIONGRAPHIC SCALE01020401 inch = 20 ft.SITE LEGENDGENERAL NOTES:1.ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THECONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE OWNER ANDDESIGN ENGINEER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITHCONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATIONSHALL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS ORGRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEENGIVEN.2.THE EXISTING GRADE SHOWN IN THIS DRAWING IS BASED ON SURVEY BY THE JOHN R.MCADAMS CO. CONDUCTED FEBRUARY 2020. CONTRACTOR TO RESTORE THE TOE OF THECHANNEL BANK TO APPROXIMATE LOCATION SHOWN ON THESE PLANS. CONTRACTORSHALL TIE PROPOSED TOP OF BANK BASED ON SITE CONDITIONS AT TIME OFCONSTRUCTION. \\johnrmcadams.com\dfsrt1\Projects\SDP\SDP-17000\Storm\Aerial Sewer Stabilization\Current Drawings\SDP17000-STR.dwg, 10/23/2020 11:42:12 AM, Stubbs, Rebecca OAK POINTE BULLETIN DRAWINGS EXHIBIT 2 APEX, NORTH CAROLINA PROJECT NO.SDP-17000 FILENAME SDP17000-STR CHECKED BY RAS DRAWN BY KEG SCALE N.T.S. DATE 10.23.2020 The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATIONBOULDER TOE REVETMENTN.T.S.SECTION VIEWGENERAL NOTES:1.FOOTER BOULDERS SHOULD BE FLAT AND RECTANGULAR AND PROVIDE AN EVEN SURFACE FOR STACKING.2.BOULDERS SHALL BE ANGULAR, FLAT, OR CUBED ROCK. INDIVIDUAL ROCK FRAGMENTS SHALL BE DENSE,SOUND, AND FREE FROM CRACKS, SEAMS OR OTHER DEFECTS CONDUCIVE TO ACCELERATED WEATHERING.NO CONCRETE, MAN-MADE ROCKS, OR SOFT ROCKS SHALL BE USED FOR THE CONSTRUCTION OF THE BOULDERTOE REVETMENT.3.FOOTINGS SHOULD BE LEVEL. THE LONGEST AXIS OF THE BOULDER SHOULD BE ORIENTED AT A NEAR VERTICALANGLE.4.BOULDERS SHALL BE PLACED BY MECHANICAL OR OTHER ACCEPTABLE METHODS, MINIMIZING VOIDS. THEBOULDERS SHALL BE PLACED TO FORM A NEAT AND UNIFORM SURFACE AREA. NO MORTAR IS PERMITTED.6.COMPACTED FILL MATERIAL SHALL BE CONSIDERED SUITABLE SOIL MATERIAL, FREE OF ROOTS, STICKS, ROCKS,BRUSH, LITTER AND OTHER OBJECTIONABLE MATERIAL.7.NO SIGNIFICANT VOIDS SHOULD EXIST BETWEEN ADJOINING FOOTER AND TOP ROCK. IN ORDER TO PREVENTPIPING OF WATER THROUGH STRUCTURE ROCKS, THE CONTRACTOR SHALL CHINK BY HAND OR EQUIPMENTALL UNDESIRABLE VOIDS WITH SMALLER ROCKS SUCH AS ANY EXISTING STREAMBED MATERIAL OR SPECIFIEDSUBSTRATE.8.FILTER FABRIC SHALL BE MIRAFI 180N OR ENGINEER APPROVED EQUAL (NON-WOVEN FABRIC) AND IS TO BEINSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION (SEE DETAIL ON EXHIBIT 3).CONSTRUCTION GUIDELINES:1.ALL EROSION AND SEDIMENT CONTROL DEVICES SHOULD BE INSTALLED IN ACCORDANCE WITH THE APPROVEDEROSION CONTROL PLAN.2.CHANNEL FLOW SHOULD BE DIVERTED AWAY FROM THE WORK AREA IN ACCORDANCE WITH THE APPROVEDEROSION CONTROL PLAN AND SITE SHOULD BE DEWATERED.3.LOOSE MATERIAL AT THE TOE OF THE EMBANKMENT SHOULD BE EXCAVATED UNTIL A STABLE FOUNDATION ISREACHED.4.EXCAVATE THE STREAM BANK UNTIL A STABLE SLOPE ANGLE IS ACHIEVED. THE SUBGRADE SHOULD BESMOOTH, FIRM, AND FREE FROM PROTRUDING OBJECTS OR VOIDS THAT WOULD EFFECT THE PROPERPOSITIONING OF THE FIRST LAYER OF STONES AND FILTER FABRIC. REMOVE ROOTS, TWIGS, AND OTHER DEBRISIN BOULDER TOE EXCAVATION LIMITS.5.PLACE NON WOVEN GEOTEXTILE FILTER FABRIC LOOSELY AND EVENLY ON PREPARED FILL SLOPE AND SECUREWITH STAPLES 2 FEET ON-CENTER MAXIMUM. RETAIN A SUITABLE LENGTH OF NON WOVEN GEOTEXTILEFABRIC TO CONTINUE 12" PAST THE FOOTER ROCK. ADJACENT STRIPS SHOULD OVERLAP 12 INCHES AND BESTAPLED ON 12 INCH CENTERS. UPSTREAM OR UPSLOPE FILTER FABRIC SHOULD ALWAYS BE PLACED OVER THEDOWNSTREAM OR DOWNSLOPE FILTER FABRIC. IF THE FILTER FABRIC IS TORN OR DAMAGED DURINGCONSTRUCTION, IT SHOULD BE REPAIRED OR REPLACED. STAPLES SHALL BE 0.125 INCHES DIAMETER NEWSTEEL WIRE FORMED INTO A "U" SHAPE NOT LESS THAN 6 INCHES IN LENGTH WITH A THROAT OF 1 INCHWIDTH.6.FOOTER ROCKS SHALL BE PLACED INDIVIDUALLY AND KEYED INTO THE CHANNEL, BED, STREAM BANK ASSHOWN IN THE DETAIL. THE TOP ROCKS OF THESE STRUCTURES SHALL BE PLACED LINEARLY, WITH TIGHT ANDCONTIGUOUS SURFACE CONTACT WITH ADJACENT ROCK. ENSURE THE ROCKS ARE STACKED SO THE PLACEDSTONE RESTS ON TWO STONES IN THE TIER BELOW IT. HEADER BOULDERS SHOULD BE SET SLIGHTLY BACKFROM FOOTER BOULDERS SUCH THAT PART OF THE HEADER BOULDER IS RESTING ON THE POROUS BACKFILL.7.PLACEMENT OF COARSE BACKFILL SHOULD OCCUR CONCURRENTLY WITH THE PLACEMENT OF EACHCONSECUTIVE ROCK LAYER. THE BACKFILL SLOPE ANGLE SHOULD BE 2H:1V OR FLATTER BUT SHOULD ALWAYSPROVIDE AT MINIMUM POSITIVE DRAINAGE.8.IF GEOTEXTILE IS PUNCTURED DURING BOULDER PLACEMENT, THE BOULDERS SHALL BE FULLY REMOVED FORAT LEAST THREE FEET OUTSIDE THE LIMITS OF THE FABRIC PUNCTURE AND A NEW GEOTEXTILE PATCH WITHMINIMUM OVERLAP SHALL BE SECURELY FASTENED OVER THE PUNCTURE WITH SECURING PINS. \\johnrmcadams.com\dfsrt1\Projects\SDP\SDP-17000\Storm\Aerial Sewer Stabilization\Current Drawings\SDP17000-STR.dwg, 10/23/2020 11:42:12 AM, Stubbs, Rebecca OAK POINTE BULLETIN DRAWINGS EXHIBIT 3 APEX, NORTH CAROLINA PROJECT NO.SDP-17000 FILENAME SDP17000-STR CHECKED BY RAS DRAWN BY KEG SCALE DATE The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATIONNON-WOVEN GEOTEXTILE FABRICMATERIAL SPECIFICATIONSN.T.S. 10.23.2020 \\johnrmcadams.com\dfsrt1\Projects\SDP\SDP-17000\Storm\Aerial Sewer Stabilization\Current Drawings\SDP17000-STR.dwg, 10/23/2020 11:42:13 AM, Stubbs, Rebecca OAK POINTE BULLETIN DRAWINGS EXHIBIT 4 APEX, NORTH CAROLINA PROJECT NO.SDP-17000 FILENAME SDP17000-STR CHECKED BY RAS DRAWN BY KEG SCALE DATE The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATIONSOIL LIFTS DETAILN.T.S.GENERAL NOTES:1.DO NOT EXCEED A 2H:1V SLOPE FOR SOIL LIFTS2.MAXIMUM LIFT THICKNESS 12", MINIMUM, 6".3.KEY-IN AND OVERLAP LIFTS A MINIMUM OF 1'.4.EACH SOIL LIFT WILL BE SECURELY STAKED AND KEYED INTO THE EXISTING BANK.5.WOODEN STAKES SHALL BE DESIGNED TO SAFELY AND EFFECTIVELY SECURE EROSION CONTROL BLANKETS, COIR LOGS, FASCINES, AND OTHER BIOENGINEEREDSTRUCTURES FOR TEMPORARY OR PERMANENT APPLICATIONS.6.SOIL LIFT FILL MATERIAL SHALL BE TOPSOIL OR 50 PERCENT MIX OF TOPSOIL AND SUITABLE SOIL MATERIAL AS DETERMINED BY THE DESIGN ENGINEER. ALL FILLMATERIAL SHALL BE FREE OF ROOTS, STICKS, ROCKS, BRUSH, LITTER AND OTHER OBJECTIONABLE MATERIAL.7.LIVE CUTTINGS SHALL MEET ALL OF THE SPECIFICATIONS STATED IN THE LIVE CUTTING NOTES ON THIS SHEET. THE LIVE BRANCHES SHOULD BE RELATIVELYSTRAIGHT, WITH NO VISIBLE SIGNS OF DISEASE, DAMAGE OR DEFORMITY.CONSTRUCTION GUIDELINES:1.INSTALL SUBGRADE GRADING AND BOULDER TOE TO FINISHED ELEVATIONS, REMOVING ROOTS, TWIGS, AND OTHER DEBRIS WHICHWOULD PREVENT THE MATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE.2.PLACE EROSION CONTROL BLANKET ON TOP OF THE SUBGRADE/BOULDER TOE PERPENDICULAR TO THE DIRECTION OF STREAMFLOW. RETAIN A SUITABLE LENGTH OF EROSION CONTROL BLANKET TO CONTINUE MATTING UP THE SLOPE. INSTALL THE EROSIONCONTROL BLANKET SUCH THAT THE UPSTREAM SIDE WILL BE ON TOP AND WILL OVERLAP THE DOWNSTREAM SIDE BY AT LEAST ONEFOOT AS NECESSARY TO COVER THE LONGITUDINAL LENGTH REQUIRED.3.PLACE SALVAGED AND/OR FURNISHED TOPSOIL UPON EROSION CONTROL BLANKET TO APPROPRIATE GRADE ELEVATION AND BANKSLOPE. PLACE SELECT FILL TO A VERTICAL DEPTH OF 6 INCHES (RIGHT BANK) AND 12 INCHES (LEFT BANK) AND MINIMUM OF 4 FEET INLENGTH. TAMP SOIL FIRMLY.4.APPLY PERMANENT SEED TO TOPSOIL IN ACCORDANCE WITH PLANTING SCHEDULES, SEED MIXES, AND PLANTING AS DESIGNED ANDAS SPECIFIED. SEED MIXTURE TO BE APPLIED TO FRONT PORTION OF LIFT THAT WILL BE LEFT EXPOSED.5.ENCAPSULATE THE TOPSOIL WITH UNBURIED LENGTH OF EROSION CONTROL BLANKET TO COVER THE LIFT. FASTEN EROSIONCONTROL BLANKET WITH WOODEN STAKES. HANDLE THE FABRIC AND SOIL MATERIALS IN A MANNER THAT DOES NOT DAMAGE THEMATTING OR DEPOSIT SOIL MATERIAL IN THE STREAM CHANNEL. REPAIRS AND FABRIC REPLACEMENT ARE THE RESPONSIBILITY OFTHE CONTRACTOR.6.AFTER SOIL LIFT IS COMPLETED, THE LIVE CUTTINGS SHALL BE CRISS-CROSSED ON TOP OF THE LIFT AT 8 TO 12 BRANCHES PER LINEARFOOT ALONG THE STREAM BANK. THE BASAL END OF THE BRANCHES SHOULD EXTEND AT LEAST 1 FOOT PAST THE BACK OF THE SOILLIFT, AGAINST THE BACK OF THE EXCAVATION. NO MORE THAN 6 INCHES OF THE BUDDING END OF THE LIVE BRANCH SHOULDEXTEND PAST THE FRONT OR FINISHED FACE OF THE SOIL LIFT. ORIENT THE BRANCHES SO THE EXPOSED PORTIONS HAVE THEIR BUDSFACING UPWARDS AND REMOVE THE TERMINAL BUD TO PROMOTE ROOT AND STEM DEVELOPMENT.7.COVER THE LIVE BRANCHES WITH TOPSOIL TO CREATE AN EVEN SURFACE FOR THE CONSTRUCTION OF THE NEXT LIFT.8.REPEAT TO FORM UNTIL A MINIMUM 2 SOIL LIFTS HAVE BEEN CREATED AT A SLOPE NO STEEPER THAN 2H:1V.9.APPLY PERMANENT SEEDING ON THE FINISHED SLOPE ACCORDING TO PLANTING PLAN (SEE EXHIBIT 6).SECTION VIEWN.T.S. 10.23.2020LIVE CUTTING NOTES:1.AREAS NOTED AS LIVE CUTTINGS WITHIN THE SOIL LIFTS SHALL BE PLANTED WITH SILKY DOGWOOD (CORNUS AMOMUM), SILKY WILLOW(SALIX SERICEA), AND BLACK WILLOW (SALIX NIGRA).2.ALL LIVE CUTTINGS SHALL BE DORMANT AT TIME OF ACQUISITION AND PLANTING.3.LIVE CUTTINGS SHALL BE 1/2-2” IN DIAMETER. LIVE CUTTINGS SHALL ALSO BE 2 - 4 FEET IN LENGTH.4.DURING PREPARATION, THE BASAL ENDS OF THE LIVE STAKES SHALL BE CLEANLY CUT AT AN ANGLE TO FACILITATE EASY INSERTION INTOTHE SOIL, WHILE THE TOPS SHALL BE CUT SQUARE OR BLUNT FOR TAMPING. ALL LIMBS SHALL REMAIN ON THE SIDES OF THE LIVECUTTING PRIOR TO INSTALLATION.5.CUTTINGS SHALL BE HARVESTED IN A MANNER SUCH THAT THEY ARE CUT, IMMEDIATELY PUT INTO WATER TO BE SOAKED FOR 10 DAYS,AND THEN PLANTED IMMEDIATELY AFTER THE 10 DAYS ARE COMPLETED. CUTTINGS SHALL REMAIN WET UNTIL THEY ARE PLANTED.OUTSIDE STORAGE LOCATIONS SHOULD BE CONTINUALLY SHADED AND PROTECTED FROM WIND AND DIRECT SUNLIGHT.6.LIVE CUTTINGS SHALL BE BUNDLED AND PLACED IN BETWEEN EACH SOIL LIFT AND STAKED. THE BRANCHES SHALL BE CRISS-CROSSED ONTOP OF THE LIFT AT 8 TO 12 BRANCHES PER LINEAR FOOT. THE BASAL END OF THE BRANCHES SHALL EXTEND AT LEAST 1 FOOT PAST THEBACK OF THE SOIL LIFT. NO MORE THAN 6 INCHES OF THE BUDDING END OF THE LIVE BRANCH SHALL EXTEND PAST THE FRONT ORFINISHED FACE OF THE SOIL LIFT. ANY STAKES THAT ARE SPLIT OR DAMAGED DURING INSTALLATION SHALL BE REMOVED AND REPLACED.7.ONE TO TWO INCHES SHALL BE CUT CLEANLY OFF OF THE TOP OF EACH LIVE STAKE (WITH LOPPERS) AT AN ANGLE OF APPROXIMATELY 15DEGREES FOLLOWING INSTALLATION. \\johnrmcadams.com\dfsrt1\Projects\SDP\SDP-17000\Storm\Aerial Sewer Stabilization\Current Drawings\SDP17000-STR.dwg, 10/23/2020 11:42:14 AM, Stubbs, Rebecca OAK POINTE BULLETIN DRAWINGS EXHIBIT 5 APEX, NORTH CAROLINA PROJECT NO.SDP-17000 FILENAME SDP17000-STR CHECKED BY RAS DRAWN BY KEG SCALE DATE The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATIONCROSS-SECTION VIEWN.T.S.EROSION CONTROL BLANKET DETAILSNOTES:1.AN EROSION CONTROL BLANKET SHALL BE USED TO STABILIZE THE NEWLY CONSTRUCTEDCHANNEL FROM THE TOP OF BANK TO TOE OF SLOPE AND SHALL BE 100%BIODEGRADABLE.2.THE CHANNEL SIDE SLOPES SHALL BE FINE GRADED, SEEDED, FERTILIZED, AND LIMEDPRIOR TO INSTALLING THE EROSION CONTROL BLANKET. REMOVE ROOTS, TWIGS, ANDOTHER DEBRIS WHICH WOULD CAUSE BULGES IN THE MATTING AS WELL AS PREVENT THEMATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE.3.KEY-IN EDGES OF MATTING A MINIMUM OF 6 INCHES INTO FINISHED GRADE. LAYMATTING SHINGLED DOWNSTREAM TO UPSTREAM, OVERLAPPING AT EDGES A MINIMUMOF 1 FOOT.4.INSTALL STAKES TO ENSURE GOOD GROUND CONTACT OF THE MATTING TO WITHSTANDMEDIUM TO HIGH FLOWS. STAKES SHALL BE 100% BIODEGRADABLE AND INSTALLED PERTHE MANUFACTURER'S SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO, THEMANUFACTURER'S RECOMMENDED DENSITY AND PATTERN.5.KEY-IN EDGES OF MATTING A MINIMUM OF 6 INCHES, PARTICULARLY NEAR RESTORATIONSTRUCTURES, BOULDERS, LOGS, ETC. CHECK MATTING FOR LOOSE ENDS, FLAPS, OR OTHERWEAKNESSES OR DAMAGE WHICH MAY CAUSE IT TO BECOME LOOSE UNDER FLOWCONDITIONS.6.THE EROSION CONTROL BLANKET SHALL CONSIST OF A MACHINE-PRODUCED BLANKETMADE OF COCONUT FIBER AND BE EQUIVALENT OR BETTER THAN THE FOLLOWINGSPECIFICATION. SOIL STABILIZATION MATTING WHICH USES PLASTICS, METALS, OR OTHERMAN-MADE MATERIALS IN THE CONSTRUCTION OF THE MATERIAL WILL NOT BEPERMITTED.WEIGHT = 13.6 OZ/SYTENSILE STRENGTH DRY (ASTM D 4595) = 780 LBS/FT MACHINE DIRECTION 744 LBS/FT CROSS DIRECTIONTENSILE STRENGTH WET (ASTM D 4595) = 672 LBS/FT MACHINE DIRECTION 648 LBS/FT CROSS DIRECTIONELONGATION FAILURE WET (ASTM D 4595) = 30% MACHINE DIRECTION28% CROSS DIRECTIONOPEN AREA = 65%RECOMMENDED SHEAR STRESS = 3LBS/SQ.FT.RECOMMENDED FLOW = 8FT/SRECOMMENDED SLOPE </= 1:1MINIMUM TWINE COUNT PER FOOT = 15X14SLOPE APPLICATION ISOMETRIC VIEWN.T.S. 10.23.2020 \\johnrmcadams.com\dfsrt1\Projects\SDP\SDP-17000\Storm\Aerial Sewer Stabilization\Current Drawings\SDP17000-STR.dwg, 10/23/2020 11:42:14 AM, Stubbs, Rebecca OAK POINTE BULLETIN DRAWINGS EXHIBIT 6 APEX, NORTH CAROLINA PROJECT NO.SDP-17000 FILENAME SDP17000-STR CHECKED BY RAS DRAWN BY KEG SCALE DATE The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATIONTEMPORARY SEEDING SCHEDULE:TEMPORARY SEEDING SHALL BE APPLIED AS NEEDED DURING CONSTRUCTION TO STABILIZE BARE OR DISTURBED AREAS OF SOIL AND AT THE COMPLETIONOR ALL GRADING AND EARTHWORK ACTIVITIES WITHIN A PARTICULAR AREA OF THE SITE. PERMANENT SEED MAY BE DISTRIBUTED WITH TEMPORARY SEEDUPON THE FINAL APPLICATION OF TEMPORARY SEED.SEEDING DATE SEEDING MIXTUREAPPLICATION RATEAUG 15 - MAY 1 RYE (GRAIN) 30 LBS/AC AUG 15 - MAY 1WHEAT30 LBS/ACMAY 1 - AUG 15GERMAN MILLET 10 LBS/ACMAY 1 - AUG 15BROWNTOP MILLET10 LBS/ACSEEDING METHODS1.EVENLY APPLY SEED USING A CYCLONE SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. THIS MUST BE DONE WITHIN 48 HOURS OF LANDDISTURBING ACTIVITIES.2.MULCH WITH CLEAN WHEAT STRAW.3.AFTER SEEDING, APPLY MULCH TO AREAS UNDER HARSH CONDITIONS SUCH AS AREAS THAT HAVE BEEN GRADED, OR THOSE WHICH WILL RECEIVECONCENTRATED FLOWS. AREAS CONSIDERED TO BE UNDER HARSH CONDITIONS WILL BE CONSIDERED THE AREAS GRADED FOR THE WETLAND VALLEY.4.RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS LESS THAN 80% COVERAGE, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DONOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE.NOTES1.TEMPORARY ANNUAL SEED SELECTION SHOULD BE BASED ON SEASON OF PROJECT INSTALLATION.2.A SINGLE SPECIES FOR TEMPORARY COVER IS ACCEPTABLE3.IN SOME CASES WHERE SEASONS OVERLAP, A MIXTURE OF TWO OR MORE SPECIES MAY BE NECESSARY. HOWEVER, APPLICATION RATES SHOULD NOTEXCEED THE TOTAL RECOMMENDED RATE PER ACRE.4.TEMPORARY SEED SHOULD BE MIXED AND APPLIED SIMULTANEOUSLY WITH THE PERMANENT SEED MIX IF OPTIMAL PLANTING DATES ALLOW.PERMANENT SEEDING SCHEDULE:PLANT MATERIAL SELECTION1.REFER TO TABLE 6.24C ON THIS SHEET FOR APPROPRIATE SELECTIONS OF NATIVE PERMANENT SEEDS.2.PERMANENT SEED INCLUSION IN THE MIXTURE SHOULD TOTAL 15 LBS OF PURE LIVE SEED (PLS) PER ACRE DRILLED OR 15-20 LBS pls/AC BROADCASTAPPLIED.3.AT LEAST 4 SPECIES SHOULD BE SELECTED FOR THE MIXTURE INCLUDING ONE SPECIES FROM EACH TYPE (WARM SEASON, COLD SEASON, WETLAND).SELECTION OF MORE THAN 4 SPECIES IS RECOMMENDED FOR INCREASING CHANCES OF SUCCESSFUL VEGETATION ESTABLISHMENT.4.IF OTHER SPECIES SUCH AS WILDFLOWERS ARE ADDED TO THE MIX, THEY SHOULD NOT BE COUNTED IN THE MINIMUM SEEDING RATE FOR GRASSES.SEEDBED PREPARATION1.DISTURBED SOILS WITHIN RIPARIAN AREAS MUST BE AMENDED TO PROVIDE AN OPTIMUM ENVIRONMENT FOR SEED GERMINATION AND SEEDLINGGROWTH.2.THE pH OF THE SOIL MUST BE SUCH THAT IT IS NOT TOXIC AND NUTRIENTS ARE AVAILABLE.3.SOIL ANALYSIS SHOULD BE PERFORMED TO DETERMINE NUTRIENT AND LIME NEEDS OF EACH SITE.4.APPROPRIATE pH LEVELS ARE BETWEEN 5.5 - 7.5.RIPARIAN BUFFERS REGULATED FOR NUTRIENT MANAGEMENT MAY BE LIMITED TO A SINGLE APPLICATION OF FERTILIZER.6.SUITABLE MECHANICAL MEANS SUCH AS DISKING, RAKING, OR HARROWING MUST BE EMPLOYED TO LOOSEN COMPACTED SOIL PRIOR TO SEEDING.PLANTING1.APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP-TYPE SPREADER, DRILL, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED.2.IN FINE SOILS, SEEDS SHOULD BE DRILLED 0.25 - 0.5 INCHES. IN COARSE SANDY SOILS, SEEDS SHOULD BE PLANTED NO DEEPER THAN 0.75 INCHES.MULCH1.MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING.2.IF PLANTING ON STREAM BANKS STEEPER THAN 10% OR AREAS SUBJECT TO FLOODING, A BIODEGRADABLE ROLLED EROSION CONTROL PRODUCT ISRECOMMENDED TO HOLD SEED AND SOIL IN PLACE.MAINTENANCE1.THE RECOMMENDED PERMANENT GRASS SPECIES MAY REQUIRE TWO YEARS FOR ESTABLISHMENT, DEPENDING ON SITE CONDITIONS.2.INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS, SOIL AMENDMENTS, AND RE-SEEDINGS.3.IF WEEDY EXOTIC SPECIES HAVE TAKEN OVER THE AREAS AFTER THE FIRST GROWING SEASON, THE INVASIVE SPECIES MUST BE ERADICATED TO ALLOWNATIVE SPECIES TO GROW.4.MONITOR THE SITE UNTIL LONG-TERM STABILITY HAS BEEN ESTABLISHED.N.T.S. 10.23.2020 December 3, 2020 Regulatory Division Action ID. SAW-2016-00095 Landon Walls Lennar Carolinas, LLC 1100 Perimeter Park Drive, suite 112 Morrisville, North Carolina 27560 Dear Mr. Walls: Reference the Department of the Army (DA) permit issued on November 4, 2016, for the permanent discharge of fill material into 0.95 acre of wetlands and 355 linear feet of stream channel and temporary placement of fill material into 20 linear feet of stream channel for the construction of the Oak Pointe residential subdivision in the town of apex, Wake County, North Carolina. This modification requests additional permanent stream channel impact of 95 linear feet at Impact area E for the installation of stream bank armoring/rip rap for the protection of a sewer line crossing. I have determined that the proposed project modifications described above are not contrary to the public interest and are consistent with the 404 (B) (1) Guidelines and therefore, the DA permit is hereby modified. The authorized work shall be completed in accordance with the attached revised drawings. All other conditions of the original permit remain applicable and the expiration date is unchanged. The permit modification is as follows: Special Condition(s): a) CONSTRUCTION PLANS: All work authorized by this permit must be performed in strict compliance with the attached plans dated August 8, 2016 and November 2, 2020. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation REPLY TO ATTENTION OF: DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 This approved modification should be attached to the original permit and will be utilized for future compliance reviews of the project. If you have questions, please contact James Lastinger of the Raleigh Regulatory Field Office, at telephone 919-554-4884 ext 32. Sincerely, Benjamin A. Bennett Colonel U.S. Army District Commander Enclosures: Copies Furnished (electronic): McAdams Company Attn: Jennifer Burdette 2905 Meridian Parkway Durham, NC 27713 NC Division of Water Resources 401 & Buffer Permitting Branch Attn: Paul Wojoski 512 N. Salisbury Street Archdale Bldg. 9th Floor Raleigh, NC 27604 SOIL LIFTS - RIGHT BANK \/-:7 // / / f J y (SEE DETAIL I /j ON EXHIBIT 3) // BODER TOE REVETMENT 3 I / �)(f \9 \ (SULEE DETAIL ON EXHIBIT 2) r — /I ) TOP OF MANHOLE \( § i�/ \ )\ l / EXISTING TOE / ELEV.: 329.42' AERIAL i EXISTING NK r SEWER PIER I ,� EXISTING TOP 20' JORDAN �,L ./.� �%r �/ OF BANK / LAKE ZONE 2 T/I�\I / TOP OF PIPE �. _ y`Lj > ,j2�O l� V/ BUFFER (TYP.) / / 20, / ELEV.: 327.83'/ 0 �t/� V'. BOTTOM OF PIPE30' JORDAN - ✓ \ 1 ) ELEV.: 325, 90' / LAKE ZONE 1 J // X " JQ, EXISTING TOP BUFFER (TYP.) // / �� \\/� x OF BANK 841 SF IMPACT P- �/ EXISTING TO IOF BANK / 1/ / / /� / ) EXISTING TOP // PROPERTY / OF BANK 9 'ASBUILT FEMA FLOODPLAIN /// �// Ir / I ` � /(PENDING APPROVAL) ASBUILT FEMA FLOODWAY EXISTING (PENDING APPROVAL) STREAM CENTERLINE GENERAL NOTES: 1. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE OWNER AND DESIGN ENGINEER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 2. THE EXISTING GRADE SHOWN IN THIS DRAWING IS BASED ON SURVEY BY THE JOHN R. MCADAMS CO. CONDUCTED FEBRUARY 2020. CONTRACTOR TO RESTORE THE TOE OF THE CHANNEL BANK TO APPROXIMATE LOCATION SHOWN ON THESE PLANS. CONTRACTOR SHALLTIE PROPOSED TOP OF BANK BASED ON SITE CONDITIONS ATTIME OF CONSTRUCTION. SITE LEGEND ASBUILT FEMA FLOODWAY / (PENDING APPROVAL) i \ 30' JORDAN ✓ LAKE ZONE 1 BUFFER (TYP.) / \ 841 SF IMPACT NCDOT CLASS I RIPRAP CHINKED WITH CLASS B RIPRAP. \ X, RIPRAP TO BE FLUSH WITH PROPOSED CHANNEL BANK FACE. TO BE LINED WITH GEOTEXTILE FABRIC OR ENGINEER -APPROVED / EQUIVALENT. L \ 20' JORDAN LAKE ZONE 2 / \ BUFFER (TYP.) SOIL LIFTS - (EFT BANK ASBUILT LOODPLMA SEE DETAIL 1 ON EXHIBIT 3) (PENDING APPROVAL) \ EXISTING AERIAL SEWER PIER TOP OF PIPE ` J / ELEV.: 328.82' / BOTTOM OF PIPE '( ELEV.: 326.82' �S BOULDER TOE REVETMENT _f PERMANENT (SEE DETAIL ON EXHIBIT 2) `- y STREAM IMPACT / sF 95 LF (0.02 AC) / / 'k LD LD LIMITS OF DISTURBANCE WOODED AREA zjU MAJOR CONTOUR 252 MINOR CONTOUR _______ 250_______ EXISTING MAJOR CONTOUR ------- 252 ------ EXISTING MINOR CONTOUR EXISTING STREAM CENTERLINE CLASS I RIPRAP BOULDER TOE REVETMENT 6;" SOIL LIFTS EROSION CONTROL BLANKET KK�x AND PERMANENT SEEDING GRAPHIC SCALE 0 10 20 40 1 inch = 20 ft. 0 p��pwuugq� CAR 04 =p�pFEss�O rQ� SEAL 6 049073 LLI r L, � Z Z 2 O Q H CC u OO x O Y U w Z Q d a Q o- GENERAL NOTES: 1. FOOTER BOULDERS SHOULD BE FLATAND RECEANGULARAND PROVIDE AN EVEN SURFACE FOR STACKING. 2. BOULDERS SHALL BE ANGULAR, FLAT, OR CUBED ROCK. INDIVIDUAL ROCK FRAGMENTS SHALL BE DENSE, SOUND, AND FREE FROM CRACKS, SEAMS OR OTHER DEFECTS CONDUCIVE TO ACCELERATED WEATHERING. NO CONCRETE, MAN-MADE ROCKS, OR SOFT ROCKS SHALL BE USED FOR THE CONSTRUCTION OF THE BOULDER TOE REVETMENT. 3. FOOTINGS SHOULD BE LEVEL. THE LONGEST AXIS OF THE BOULDER SHOULD BE ORIENTED AT A NEAR VERTICAL ANGLE. 4. BOULDERS SHALL BE PLACED BY MECHANICAL OR OTHER ACCEPTABLE METHODS, MINIMIZING VOIDS. THE BOULDERS SHALL BE PLACED TO FORM A NEAT AND UNIFORM SURFACE AREA. NO MORTAR IS PERMITTED. 6. COMPACTED FILL MATERIAL SHALL BE CONSIDERED SUITABLE SOIL MATERIAL, FREE OF ROOTS, STICKS, ROCKS, BRUSH, LITTER AND OTHER OBJECTIONABLE MATERIAL. 7. NO SIGNIFICANT VOIDS SHOULD EXIST BETWEEN ADJOINING FOOTER AND TOP ROCK. IN ORDER TO PREVENT PIPING OF WATER THROUGH STRUCTURE ROCKS, THE CONTRACTOR SHALL CHINK BY HAND OR EQUIPMENT ALL UNDESIRABLE VOIDS WITH SMALLER ROCKS SUCH AS ANY EXISTING STREAMBED MATERIAL OR SPECIFIED SUBSTRATE. 8. FILTER FABRIC SHALL BE MIRAFI 18ON OR ENGINEER APPROVED EQUAL (NON -WOVEN FABRIC) AND IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION (SEE DETAIL ON EXHIBIT 3). CONSTRUCTION GUIDELINES: 1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHOULD BE INSTALLED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN. 2. CHANNEL FLOW SHOULD BE DIVERTED AWAY FROM THE WORK AREA IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SITE SHOULD BE DEWATERED. 3. LOOSE MATERIAL AT THE TOE OF THE EMBANKMENT SHOULD BE EXCAVATED UNTIL A STABLE FOUNDATION IS REACHED. 4. EXCAVATE THE STREAM BANK UNTIL A STABLE SLOPE ANGLE IS ACHIEVED. THE SUBGRADE SHOULD BE SMOOTH, FIRM, AND FREE FROM PROTRUDING OBJECTS OR VOIDS THAT WOULD EFFECT THE PROPER POSITIONING OF THE FIRST LAYER OF STONES AND FILTER FABRIC. REMOVE ROOTS, TWIGS, AND OTHER DEBRIS IN BOULDER TOE EXCAVATION LIMITS. S. PLACE NON WOVEN GEOTEXTILE FILTER FABRIC LOOSELY AND EVENLY ON PREPARED FILL SLOPE AND SECURE WITH STAPLES 2 FEET ON -CENTER MAXIMUM. RETAIN A SUITABLE LENGTH OF NON WOVEN GEOTEXTILE FABRIC TO CONTINUE 12" PAST THE FOOTER ROCK. ADJACENT STRIPS SHOULD OVERLAP 12 INCHES AND BE STAPLED ON 12 INCH CENTERS. UPSTREAM OR UPSLOPE FILTER FABRIC SHOULD ALWAYS BE PLACED OVER THE DOWNSTREAM OR DOWNSLOPE FILTER FABRIC. IF THE FILTER FABRIC IS TORN OR DAMAGED DURING CONSTRUCTION, IT SHOULD BE REPAIRED OR REPLACED, STAPLES SHALL BE 0.125 INCHES DIAMETER NEW STEEL WIRE FORMED INTO A "U" SHAPE NOT LESS THAN 6INCHES IN LENGTH WITH ATHROAT OF 1INCH WIDTH. 6. FOOTER ROCKS SHALL BE PLACED INDIVIDUALLY AND KEYED INTO THE CHANNEL, BED, STREAM BANK AS SHOWN IN THE DETAIL. THE TOP ROCKS OF THESE STRUCTURES SHALL BE PLACED LINEARLY, WITH TIGHT AND CONTIGUOUS SURFACE CONTACT WITH ADJACENT ROCK. ENSURE THE ROCKS ARE STACKED SO THE PLACED STONE RESTS ON TWO STONES IN THE TIER BELOW IT. HEADER BOULDERS SHOULD BE SET SLIGHTLY BACK FROM FOOTER BOULDERS SUCH THAT PART OF THE HEADER BOULDER IS RESTING ON THE POROUS BACKFILL. 7. PLACEMENT OF COARSE BACKFILL SHOULD OCCUR CONCURRENTLY WITH THE PLACEMENT OF EACH CONSECUTIVE ROCK LAYER. THE BACKFILL SLOPE ANGLE SHOULD BE 2H:1V OR FLATTER BUT SHOULD ALWAYS PROVIDE AT MINIMUM POSITIVE DRAINAGE. 8. IF GEOTEXTILE IS PUNCTURED DURING BOULDER PLACEMENT, THE BOULDERS SHALL BE FULLY REMOVED FOR AT LEAST THREE FEET OUTSIDE THE LIMITS OF THE FABRIC PUNCTURE AND A NEW GEOTEXTILE PATCH WITH MINIMUM OVERLAP SHALL BE SECURELY FASTENED OVER THE PUNCTURE WITH SECURING PINS. EROSION CONTROL BLANKET (SEE DETAIL ON EXHIBIT 5) SOIL LIFTS (SEE DETAIL ON EXHIBIT 4) MIN. 3.51 X 3.5'W X 2'H BOULDERS BASEFLOW 17 EXISTING GRADE STREAM BED —III— BOULDER TOE REVETMENT 6" MIN EXISTING GRADE TOPSOIL (TYP.) (TYP.) !� 3 ®c INSITU SOILS oU III �yI MWTED SUITABLE -I I III —IS17 GENERAL NOTE 6) — —WOVEN j EEO -TEXTILE -IIIP-I ;6ARSE BACKFILL COMPOSED TTI �(IF AASHTO NO. 57 STONE — (MAX OF 5% FINES) MIN EXCAVATION LIMITS 11=1 I I I I (TYP ) EMBED FOOTER BOULDERS (MINIMUM 1') NON WOVEN GEOTEXTILE FABRIC TO EXTEND MIN. 12" PAST FOOTER ROCK �� CARD( O,ZO�QFESS/..••� 9 �. _ SEALWN 049073 e� nun W Ln Z >z_ z N 0 Q U d m r Z = p Y~wZ aw w J d J Q Oco m NOTE: GEOTEXTILE FABRIC (NON —WOVEN) SHALL CONFORM TO THE FOLLOWING SPECIFICATIONS. MECHANICAL PROPERTIES TEST METHOD UNIT MINIMUM AVERAGE VALUE ROLL MD CD GRAB TENSILE STRENGTH ASTM D 4632 N (Ibs) 912 (205) 912 (205) GRAB TENSILE ELONGATION ASTM D 4632 % 50 50 TRAPEZOID TEAR STRENGTH ASTM D 4533 N (Ibs) 356 (80) 356 (80) CBR PUNCTURE STRENGTH ASTM D 6241 N (Ibs) 2225 (500) APPARENT OPENING SIZE (AOS)i ASTM D 4751 mm (U.S. SIEVE) 0.18 (80) PERMITTIVITY ASTM D 4491 c -1 1A FLOW RATE ASTM D 4491 I/min/m' (gal/min/ft') 3870 (95) UV RESISTANCE (AT 500 HOURS) ASTM D 4355 % STRENGTH RETAINED 70 'ASTM D 4751: AOS IS A MAXIMUM OPENING DIAMETER VALUE PHYSICAL PROPERTIES TEST METHOD UNIT TYPICAL VALUE WEIGHT ASTM D 5261 g/m' (o /yd') 271 (8.0) THICKNESS ASTM D 5199 mm (mils) 1.8 (72) ROLL DIMENSIONS (WIDTH X LENGTH) — ft 12.5 X 360 15 X 300 ROLL AREA — m' (yd') 418 (500) ESTIMATED ROLL WEIGHT — kg (lb) 120 (265) NON —WOVEN GEOTEXTILE FABRIC MATERIAL SPECIFICATIONS \,\\\\\\IIIIIIIII CAR p� SEAL�9rs• 049073 GENERAL NOTES: 1. DO NOT EXCEED A 2H:1V SLOPE FOR SOIL LIFTS 2. MAXIMUM LIFTTHICKNESS 12", MINIMUM, 6". 3. KEY -IN AND OVERLAP LIFTS A MINIMUM OF 1'. 4. EACH SOIL LIFT WILL BE SECURELY STAKED AND KEYED INTO THE EXISTING BANK. S. WOODEN STAKES SHALL BE DESIGNED TO SAFELY AND EFFECTIVELY SECURE EROSION CONTROL BLANKETS, COIR LOGS, FASCINES, AND OTHER BIOENGINEERED STRUCTURES FOR TEMPORARY OR PERMANENT APPLICATIONS. 6. SOIL LIFT FILL MATERIAL SHALL BE TOPSOIL OR 50 PERCENT MIX OF TOPSOILAND SUITABLE SOIL MATERIAL AS DETERMINED BY THE DESIGN ENGINEER. ALL FILL MATERIAL SHALL BE FREE OF ROOTS, STICKS, ROCKS, BRUSH, LITTER AND OTHER OBJECTIONABLE MATERIAL. 7. LIVE CUTTINGS SHALL MEET ALL OF THE SPECIFICATIONS STATED IN THE LIVE CUTTING NOTES ON THIS SHEET. THE LIVE BRANCHES SHOULD BE RELATIVELY STRAIGHT, WITH NO VISIBLE SIGNS OF DISEASE, DAMAGE OR DEFORMITY. 1. AREASNOTED AS LIVE CUTTINGS WITHIN THE SOIL LIFTS SHALL BE PLANTED WITH SILKY DOGWOOD(CORNUSAMOMUM), SILKY WILLOW (SALIX SERICEA), AND BLACK WILLOW (SALIX NIGRA). 2. ALL LIVE CUTTINGS SHALL BE DORMANT AT TIME OF ACQUISITION AND PLANTING. 3. LIVE CUTTINGS SHALL BE 1/2-2" IN DIAMETER. LIVE CUTTINGS SHALL ALSO BE 2-4 FEET INLENGTH. 4. DURING PREPARATION, THE BASAL ENDS OF THE LIVE STAKES SHALL BE CLEANLY CUT AT AN ANGLE TO FACILITATE EASY INSERTION INTO THE SOIL, WHILE THE TOPS SHALL BE CUT SQUARE OR BLUNT FOR TAMPING. ALL LIMBS SHALL REMAIN ON THE SIDES OF THE LIVE CUTTING PRIOR TO INSTALLATION. S. CUTTINGS SHALL BE HARVESTED IN A MANNER SUCH THAT THEY ARE CUT, IMMEDIATELY PUT INTO WATER TO BE SOAKED FOR 10 DAYS, AND THEN PLANTED IMMEDIATELY AFTER THE 30 DAYS ARE COMPLETED. CUTTINGS SHALL REMAIN WET UNTIL THEY ARE PLANTED, OUTSIDE STORAGE LOCATIONS SHOULD BE CONTINUALLY SHADED AND PROTECTED FROM WIND AND DIRECT SUNLIGHT. 6. LIVE CUTTINGS SHALL BE BUNDLED AND PLACED IN BETWEEN EACH SOIL LIFT AND STAKED. THE BRANCHES SHALL BE CRISS-CROSSED ON TOP OF THE LIFT AT 8 TO 12 BRANCHES PER LINEAR FOOT. THE BASAL END OF THE BRANCHES SHALL EXTEND AT LEAST 1 FOOT PAST THE BACK OF THE SOIL LIFT. NO MORE THAN 6 INCHES OF THE BUDDING END OF THE LIVE BRANCH SHALL EXTEND PAST THE FRONT OR FINISHED FACE OF THE SOIL LIFT. ANY STAKES THAT ARE SPLIT OR DAMAGED DURING INSTALLATION SHALL BE REMOVED AND REPLACED. 7. ONE TO TWO INCHES SHALL BE CUT CLEANLY OFF OF THE TOP OF EACH LIVE STAKE (WITH LOPPERS) AT AN ANGLE OF APPROXIMATELY 15 DEGREES FOLLOWING INSTALLATION. 1. INSTALLS BGRADE GRADING AND BOULDER TOE TO FINISHED ELEVATIONS, REMOVING ROOTS, TWIGS, AND OTHER DEBRIS WHICH WOULD PREVENT THE MATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE. 2. PLACE EROSION CONTROL BLANKET ON TOP OF THE SUBGRADE/BOULDER TOE PERPENDICULAR TO THE DIRECTION OF STREAM FLOW. RETAIN A SUITABLE LENGTH OF EROSION CONTROL BLANKET TO CONTINUE MATTING UP THE SLOPE. INSTALL THE EROSION CONTROL BLANKET SUCH THAT THE UPSTREAM SIDE WILL BE ON TOP AND WILL OVERLAP THE DOWNSTREAM SIDE BY AT LEAST ONE FOOT AS NECESSARY TO COVER THE LONGITUDINAL LENGTH REQUIRED. 3. PLACE SALVAGED AND/OR FURNISHED TOPSOIL UPON EROSION CONTROL BLANKET TO APPROPRIATE GRADE ELEVATION AND BANK SLOPE. PLACE SELECT FILL TO A VERTICAL DEPTH OF 6 INCHES (RIGHT BANK) AND 12 INCHES (LEFT BANK) AND MINIMUM OF 4 FEET IN LENGTH. TAMP SOIL FIRMLY. 4. APPLY PERMANENT SEED TO TOPSOIL IN ACCORDANCE WITH PLANTING SCHEDULES, SEED MIXES, AND PLANTING AS DESIGNED AND AS SPECIFIED. SEED MIXTURE TO BE APPLIED TO FRONT PORTION OF LIFT THAT WILL BE LEFT EXPOSED. 5. ENCAPSULATE THE TOPSOIL WITH UNBURIED LENGTH OF EROSION CONTROL BLANKET TO COVER THE LIFT. FASTEN EROSION CONTROL BLANKET WITH WOODEN STAKES. HANDLE THE FABRIC AND SOIL MATERIALS IN A MANNER THAT DOES NOT DAMAGE THE MATTING OR DEPOSIT SOIL MATERIAL IN THE STREAM CHANNEL. REPAIRS AND FABRIC REPLACEMENT ARE THE RESPONSIBILITY OF THE CONTRACTOR. 6. AFTER SOIL LIFT IS COMPLETED, THE LIVE CUTTINGS SHALL BE CRISS-CROSSED ON TOP OF THE LIFT AT 8 TO 12 BRANCHES PER LINEAR FOOT ALONG THE STREAM BANK. THE BASAL END OF THE BRANCHES SHOULD EXTEND AT LEAST 1 FOOT PAST THE BACK OF THE SOIL LIFT, AGAINST THE BACK OF THE EXCAVATION. NO MORE THAN 6INCHES OF THE BUDDING END OF THE LIVE BRANCH SHOULD EXTEND PAST THE FRONT OR FINISHED FACE OF THE SOIL LIFT. ORIENT THE BRANCHES SO THE EXPOSED PORTIONS HAVE THEIR BUDS FACING UPWARDS AND REMOVE THE TERMINAL BUD TO PROMOTE ROOT AND STEM DEVELOPMENT. LIVE CUTTINGS (SEE GENERAL NOTE 7 AND LIVE CUTTING NOTES) SOIL LIFTS MAX HEIGHT 12" TOPSOIL OR 50% MIX (SEE NOTES) 7. COVER THE LIVE BRANCHES WITH TOPSOIL TO CREATE AN EVEN SURFACE FOR THE CONSTRUCTION OF THE NEXT LIFT. SOIL LIFTS DETAIL 8. REPEAT TO FORM UNTIL A MINIMUM 2 SOIL LIFTS HAVE BEEN CREATED AT A SLOPE NO STEEPER THAN 2H:SV. J L FIJ CIF1 L 9. APPLY PERMANENT SEEDING ON THE FINISHED SLOPE ACCORDING TO PLANTING PLAN (SEE EXHIBIT 6). N.T.S. INSTALL EROSION CONTROL BLANKET IN — 6" TRENCH, ANCHOR WITH WOODEN STAKE (PREFERRED) OR STAPLE, BACKFILL, AND COMPACT. RESTORE DISTURBED AREA WITH TOPSOIL, SEEDING, AND PLANTING ESTABLISHED PERMANENT SEEDING (SEE EXHIBIT 6) EROSION CONTROL BLANKET (SEE EXHIBIT 5) 2 (MAX) + + + + + + MATTING EMBEDMENT i+ + + + + + + + + + + _+/+, + tq SECTION VIEW LEFT BANK: 2 SOIL LIFTS WITH 12" HEIGHT RIGHT BANK: 2 SOIL LIFTS WITH 6" HEIGHT EXISTING GRADE (TYP.) W N Z z Z Q p O U co III 9 YzWZ Lu —III III —I Q J a I —III —III —I IIIIIIII; Q 000 IIIIIII INSITU SOILS II —III WOODEN STAKE COARSE AGGREGATE FILTER LAYER - a S' �� CARO( �'. O�.OF ESS /..••• 9 �i SEAL�9rs• 049073 •S•F fit• •,CINE; r•���: NOTES: 1. AN EROSION CONTROL BLANKET SHALL BE USED TO STABILIZE THE NEWLY CONSTRUCTED CHANNEL FROM THE TOP OF BANK TO TOE OF SLOPE AND SHALL BE 100% BIODEGRADABLE. 2. THE CHANNEL SIDE SLOPES SHALL BE FINE GRADED, SEEDED, FERTILIZED, AND LIMED PRIOR TO INSTALLING THE EROSION CONTROL BLANKET. REMOVE ROOTS, TWIGS, AND _ OTHER DEBRIS WHICH WOULD CAUSE BULGES IN THE MATTING AS WELL AS PREVENT THE III= MATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE. 3. KEY -IN EDGES OF MATTING A MINIMUM OF 6INCHES INTO FINISHED GRADE. LAY BLANKET MATTING SHINGLED DOWNSTREAM TO UPSTREAM, OVERLAPPING AT EDGES A MINIMUM KEYED 6" MIN OF FOOT. 4. INSTALL STAKES TO ENSURE GOOD GROUND CONTACT OF THE MATTING TO WITHSTAND MEDIUM TO HIGH FLOWS. STAKES SHALL BE 100% BIODEGRADABLE AND INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO, THE MANUFACTURER'S RECOMMENDED DENSITY AND PATTERN. 5. KEY -IN EDGES OF MATTING A MINIMUM OF 6INCHES, PARTICULARLY NEAR RESTORATION STRUCTURES, BOULDERS, LOGS, ETC. CHECK MATTING FOR LOOSE ENDS, FLAPS, OR OTHER WEAKNESSES OR DAMAGE WHICH MAY CAUSE ITTO BECOME LOOSE UNDER FLOW CONDITIONS. 6. THE EROSION CONTROL BLANKET SHALL CONSIST OF A MACHINE -PRODUCED BLANKET MADE OF COCONUT FIBER AND BE EQUIVALENT OR BETTER THAN THE FOLLOWING SPECIFICATION. SOIL STABILIZATION MATTING WHICH USES PLASTICS, METALS, OR OTHER MAN-MADE MATERIALS IN THE CONSTRUCTION OF THE MATERIAL WILL NOT BE PERMITTED. WEIGHT = 13.6 OZ/SY TENSILE STRENGTH DRY (ASTM D 4595) = 780 LBS/FT MACHINE DIRECTION 744 LBS/FT CROSS DIRECTION 6 INCH DEEP (MIN.) KEY IN TRENCH TENSILE STRENGTH WET (ASTM D 4595) = 672 LBS/FT MACHINE DIRECTION 648 LBS/FT CROSS DIRECTION ELONGATION FAILURE WET (ASTM D4595)= 30% MACHINE DIRECTION 28% CROSS DIRECTION OPEN AREA = 65% RECOMMENDED SHEAR STRESS = 3LBS/SQ.FT. RECOMMENDED FLOW = BETA RECOMMENDED SLOPE </= 1:1 MINIMUM TWINE COUNT PER FOOT= 15X14 OVERLAP ROLL EDGES 1 FOOT MINIMUM (TYP.) 1' MIN BANKFULL STAGE I' EROSION CONTROL BLANKET BLANKET KEYED 6" MIN runcc ccrnnrd \nnnl + O+ PREPARED SLOP E++ WITH SEED IN PLACE (TYP.) EROSION CONTROL BLANKET DETAILS N.T.S. SLOPE APPLICATION ISOMETRIC VIEW FILL MAT VOIDS IF SPECIFIED 6 IN MIN. OVERLAP AT ROLL END (TYP.) \,\\\\\\IIIIIIIII CAR O( SEAL�9rs• 049073 p�1e1 /nun \O��,O W In ZZ z � O Q H u a poor Z = p Y I­—w Z aw J J R Q Oca m TEMPORARY SEEDING SCHEDULE: TEMPORARY SEEDING SHALL BE APPLIED AS NEEDED DURING CONSTRUCTION TO STABILIZE BARE OR DISTURBED AREAS OF SOIL AND AT THE COMPLETION OR ALL GRADING AND EARTHWORK ACTIVITIES WITHIN A PARTICULAR AREA OF THE SITE. PERMANENT SEED MAYBE DISTRIBUTED WITH TEMPORARY SEED UPON THE FINAL APPLICATION OF TEMPORARY SEED. SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 15 - MAY 1 RYE (GRAIN) 30 LBS/AC AUG 15 - MAY 1 W H EAT 30 LBS/AC MAY 1 -AUG 15 GERMAN MILLET 10 LBS/AC MAY 1 -AUG 15 BROWNTOP MILLET 10 LBS/AC SEEDING METHODS 1. EVENLYAPPLYSEED USING A CYCLONE SEEDER, DRILL, CULTI PACKER SEEDER, OR HYDROSEEDER. THIS MUST BE DONE WITHIN 48 HOURS OF LAND DISTURBING ACTIVITIES. 2. MULCH WITH CLEAN WHEATSTRAW. 3. AFTERSEEDING, APPLY MULCH TOAREAS UNDER HARSH CONDITIONS SUCH AS AREASTHAT HAVE BEEN GRADED, OR THOSE WHICH WILL RECEIVE CONCENTRATED FLOWS. AREAS CONSIDERED TO BE UNDER HARSH CONDITIONS WILL BE CONSIDERED THE AREAS GRADED FOR THE WETLAND VALLEY. 4. RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS LESSTHAN 80%COVERAGE, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. NOTES 1. TEMPORARY ANNUAL SEED SELECTION SHOULD BE BASED ON SEASON OF PROJECT INSTALLATION. 2. ASINGLE SPECIES FOR TEMPORARYCOVER IS ACCEPTABLE 3. IN SOME CASES WHERE SEASONS OVERLAP, A MIXTURE OF TWO OR MORE SPECIES MAY BE NECESSARY. HOWEVER, APPLICATION RATES SHOULD NOT EXCEED THE TOTAL RECOMMENDED RATE PER ACRE. 4. TEMPORARY SEED SHOULD BE MIXED AND APPLIED SIMULTANEOUSLY WITH THE PERMANENT SEED MIX IF OPTIMAL PLANTING DATES ALLOW. PERMANENT SEEDING SCHEDULE: PLANT MATERIAL SELECTION 1. REFER TO TABLE 6.24C ON THIS SHEET FOR APPROPRIATE SELECTIONS OF NATIVE PERMANENT SEEDS. 2. PERMANENT SEED INCLUSION IN THE MIXTURE SHOULD TOTAL 15 LBS OF PURE LIVE SEED (PLS) PER ACRE DRILLED OR 15-20 LBS pls/AC BROADCAST APPLIED. 3. AT LEAST SPECIES SHOULD BE SELECTED FOR THE MIXTURE INCLUDING ONE SPECIES FROM EACH TYPE (WARM SEASON, COLD SEASON, WETLAND). SELECTION OF MORE THAN 4 SPECIES IS RECOMMENDED FOR INCREASING CHANCES OF SUCCESSFUL VEGETATION ESTABLISHMENT. 4. IF OTHER SPECIES SUCH AS WILDFLOWERS ARE ADDED TO THE MIX, THEY SHOULD NOT BE COUNTED IN THE MINIMUM SEEDING RATE FOR GRASSES. SEEDBED PREPARATION 1. DISTURBED SOILS WITHIN RIPARIAN AREAS MUST BE AMENDEDTO PROVIDEAN OPTIMUM ENVIRONMENT FOR SEED GERMINATION AND SEEDLING GROWTH, 2. THE pH OF THE SOIL MUST BE SUCH THAT IT IS NOT TOXIC AND NUTRIENTS ARE AVAILABLE. 3. SOILANALYSIS SHOULD BE PERFORMED TO DETERMINE NUTRIENTAND LIME NEEDS OF EACH SITE. 4. APPROPRIATE pH LEVELS ARE BETWEEN 5.5-7. 5. RIPARIAN BUFFERS REGULATED FOR NUTRIENT MANAGEMENT MAY BE LIMITED TO ASINGLE APPLICATION OF FERTILIZER. 6. SUITABLE MECHANICAL MEANS SUCH AS DISKING,RAKING, OR HARROWING MUST BE EMPLOYEDTO LOOSEN COMPACTED SOIL PRIOR TO SEEDING. PLANTING 1. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP -TYPE SPREADER, DRILL, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. 2. IN FINE SOILS, SEEDS SHOULD BE DRILLED 0.25 - 0.5 INCHES. IN COARSE SANDY SOILS, SEEDS SHOULD BE PLANTED NO DEEPER THAN 0.75 INCHES. MULCH 1. MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING. 2. IF PLANTING ON STREAM BANKS STEEPER THAN 10% OR AREAS SUBJECT TO FLOODING, A BIODEGRADABLE ROLLED EROSION CONTROL PRODUCT IS RECOMMENDED TO HOLD SEED AND SOIL IN PLACE. MAINTENANCE 1. THE RECOMMENDED PERMANENT GRASS SPECIES MAY REQUIRE TWO YEARS FOR ESTABLISHMENT, DEPENDING ON SITE CONDITIONS. 2. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS, SOIL AMENDMENTS, AND RE-SEEDINGS. 3. IF WEEDY EXOTIC SPECIES HAVE TAKEN OVER THE AREAS AFTER THE FIRST GROWING SEASON, THE INVASIVE SPECIES MUST BE ERADICATED TO ALLOW NATIVE SPECIES TO GROW. 4. MONITOR THE SITE UNTIL LONG-TERM STABILITY HAS BEEN ESTABLISHED. W Ln Hz z Z Q Q I— U d 0 m ~ Z = O Y~wZ aw JJ d OQ m E3ti i E c E a'oq a n E-E mE E 1 Burdette, Jennifer From:laserfiche@ncdenr.gov Sent:Sunday, November 29, 2020 12:00 AM To:Burdette, Jennifer Cc:rick.trone@ncdenr.gov Subject:Pre-Filing Meeting is not needed for Oak Pointe Residential Subdivision - 20160285 Ver 3 The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form for Oak Pointe Residential Subdivision that you submitted on 10/29/2020 1:49 PM. The ID number for that project is 20160285, Version 3. It has been decided that no meeting is needed for this project. Project file link: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=1337517 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored.