HomeMy WebLinkAbout820051_Plan of Action (POA)_20200128 PLAN OF ACTION (POA) FOR LAGOON SLUDGE'.REDUCTION : -
• Facility Number: Z County:
Facility Name: 1 tto5
Certified,Operator Name: iQ ra a ruck Operator#: fri by,/
"Attach a copy of Lagoon Sludge Survey Form and volume worksheets
Note:A certified Sludge Management Plan may be submitted in lieu of this POA: .
•
Lagoon 1- Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6
a.Lagoon Name/Identifier 2(06
b.Total Sludge Depth(ft) y
c.Sludge Depth to be
Removed for Compliance
/.
/
(ft)
d.Sludge Volume to be
Removed(gallons) 0 adb.
e.Sludge PAN
(lbs/1000gal) � (i
• f.Liquid PAN
• (Ibs/1000 gal).
• g:PAN of Sludge(Ibs) -r
(d x e)/1000 lY i ;
Compliance Timeframes:
If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level
results in an elevated waste analysis, a sludge management plan that meets the requirements of SB ..
Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to
DWQ within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance
with NRCS Standard 359 must be achieved within two years of the original sludge survey.
If the sludge level is non-compliant but below the stop pump level of the lagoon, a POA must be filed
.within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the
original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in :
sludge levels, DWQ may require.the owner to develop a sludge management plan that meets the
requirements of SB Interagency Group Guidance Document 1.26.
SPOA 3-22=2010 Pagel of 2
•
•
•
NARRATIVE: Use this section to describe the method(s)that will be used to lower the sludge
' depth. If microbe use is planned,specify the product to be used.
Sludge Management/Operation Plan
Sludge Management Guidance
Lagoon evaluation data developed by NCSU and a review of lagoon management records of several •
lagoons showed that the treatment capability of the swine lagoons evaluated in NC was not
significantly adversely affected by sludge accumulations of 50P/0 or more of the planned treatment
- volume of the lagoon.Therefore it is felt that it is permissible to allow sludge accumulation into the
planned treatment zone of properly monitored and managed lagoons provided that
. • Nutrient values of the lagoon effluent are within the normal Operating range.
•
• There is no noticeable increase in lagoon odor.
o Nutrients land applied from the lagoon are properly accounted for in the application plan -
• • . (WUP)with no excess application.
•
, • Stop-pump level Is easily attained with no adverse deposition of sludge into temporary
storage.
Sludge Management
Sludge in my lagoon will be managed by the following:
• Adequately monitor to define sludge volume,location,,and rate of accumulation by
• conducting an annual sludge survey.
Maintain a minimum 2.5 feet deep zone,free of sludge at the pump intake during irrigation. , .
9 Position the pump intake and manage the irrigation operation such that the material ' : • ,,
irrigated is not more concentrated than the nutrient analysis samples.
0 Sufficient monitoring to address concerns that nutrients are not over applied.
s Other items as required by DWQ.. •
.
•
• I hereby certify that I have reviewed the information listed above- in.d included within the.attached
• Plan of Action,and to the best of my knowledge and ability,the information is accurate and
correct. I further certify and acknowledge that compliance with regard to sludge accumulation
must be achieved within two years of the original sludge survey indicating non-compliance. •
Sludge Survey Date: >/—/ 9 Compliance Due Date: //--•1 2 /
ra 6 •
• rcis Phone: q/b 7C
Facility Owner/Manager(print)
Date: ,2 Y-2 020
Facility Owner/Manager(signature)
Return this form tof
•
Animal Feeding Operations Unit
• NC Division of Water Quality
1636 Mail Service Center •
• Ra!eigh, NC 27699-1636 •.-
•
SPOA 3-22-2010 Page 2 of 2 •
•
•