Loading...
HomeMy WebLinkAbout20071875 Ver 1_DCM Permit_20100915Permit Class 01-1%')s Permit Number MODIFICATION/MINOR 14-08 STATE OF NORTH CAROLINA ?" Department of Environment and Natural Resources and Coastal Resources Commission r -4l?urmtt for X Major Development in an Area of Environment a Concern 1 pursuant to NCGS 113A-118 f1 ,te*R 8111" 4i and/or filling pursuant to NCGS 113-229 Nosy o¢ CR y BR 'C Issued to A.B. Cooper Jr., PO Box 250, Atlantic Beach, NC 28512 Authorizing development in Carteret County adj. to Bogue Sound, at North Shore Dr. 1 in Atlantic Beach , as requested in the permittee's letter dated dated received in Morehead City on 8/10/10, includinp- the attached workplan drawings (7), all dated 8/9/10 This permit, issued on September 3, 2010 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may 1) Unless specifically altered herein, this minor modification authorizes the boatlift to the existing pier and platform at lot 118 N. Shore Drive II, that is expressly and specifically set forth in the attached workplan drawings. 2) The boatlift shall not extend further waterward than the existing platform. Any reference to the boatlift extending waterward of the existing platform in the attached workplan drawings is hereby null and void. 3) This minor modification shall be attached to the original Permit No. 14-08, which was issued on 2/13/03 and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on November 17, 2015 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. James 'fl. Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee A.B. Cooper Jr. Permit # 14-08 Page 2 of 2 ADDITIONAL CONDITIONS 4) All conditions and stipulations of the active permit remain in force under this minor modification unless specifically altered herein. NOTE: The expiration date of this permit has been extended in accordance with Session Law 2009-406, `as amended by Session Law 2010-177.