Loading...
HomeMy WebLinkAbout20090544 Ver 1_More Info Received_20100915Since 1979 THE JOHN R. McADAMS COMPANY, INC. 09-0544 September 14, 2010 Mr. Joseph Gyamfi NCDENR - 401 Oversight and Express Permitting Unit 2321 Crabtree Boulevard Suite 250 Raleigh, North Carolina 27604 R?t' ZZ Re: SilverLanding 511--p 2ci0 Charlotte, North Carolina r DcryR WATER QUALI IBC-08030 aNOSroR ,jqE BRpyG{ Dear Mr. Gyamfi: Per your letter requesting additional information dated August 24, 2010, please find the following items enclosed: • Two (2) copies of the signed & notarized O&M agreement. • Two (2) copies of the approved stormwater design calculations. • Two (2) copies of the approved stormwater management construction plans and details. Research Triangle Park, NC Post Office Box 14005 Research Triangle Park North Carolina, 27709 2905 Meridian Parkway Durham, North Carolina 27713 800-733-5646 919-361-5000 919-361-2269 Fax Charlotte, NC 6701 Carmel Road Suite 205 Charlotte North Carolina 28226 800-733-5646 704-527-0800 704-527-2003 Fax Please let me know if you have any questions or need additional information. Sincerely, THE JOHN R. McADAMS COMPANY, INC. Brandon lunkett, P.E. Director of Engineering, Charlotte Region Enclosures Copy: Lorin Silverman Len Rindner www.johnrmcadams.com I Design Services Focused On Client Success Permit Number: O C o SL? 4 (to be provided by DWQ) Drainage Area Number: Subbasin 1 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. til 1 s' tr t,? ry e- Q , 2 BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: Subbasin 1 BMP element: Potential roblem: How I will remediate the roblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 Of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: Subbasin 1 BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 668.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 668.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 673.50 Sediment Removal 668.00 1 667.00 -------- t / Volume' ft Min. Sediment Storage Pool \-----. Sediment Removal Elevation 668.00_____-_--_ Volume Bottom FOREBAY Bottom Elevation 667.00 j 1-ft MAIN POND Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) ?e I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Silver Landing Phase II BMP drainage area number: Subbasin 1 Print name: L9/ /V S. ST-I EF L Title: M&x6n Eze Address: A (o ?Ln- i' Fi9if-y1E- l Ro,4-,?) , C'ffR?L OTTF , J1/C 29210 Phon Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, L)AW,6 _ ,[ A M j E 1 s , a Notary Public for the State of /1/d I& 6/2,0Avi9- , County of , do hereby certify that "ix S. person ly appeared before me this day o - -V j p , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, . ?y f J SEAL My co ission expires Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 EcolEngineering A division of The John R. McAdams Company, Inc. °9-°44 s?P ?S 2G;? vrTC,AaSZWAA? ?ac/ry 4TtR8?? SILVER LANDING PHASE II CHARLOTTE, NORTH CAROLINA crm r71 kill AVI'l1, SWM I DETENTION EROSION CONTROL FOR A PRE-CONSTRUCTION MEETING 48 HRS. PRIOR TO ANY LAND DISTURBING ACTIVITY, CONTACT. DRAINAGE PLAN TREE ORDINANCE CDOT DRIVEWAYS NCDOT DRIVEWAYS STORMWATER IMPACT ANALYSIS STORMWATER MANAGEMENT FACILITY DESIGN APPROVED By Robert Zink at 9:42 am, Sep 01, 2010 C-08030 APPROVED By Robert Zink at 9:43 am, Sep 01, 2010 July 2009 Jennifer C. Diaz., PE Project Engineer James W. Caldwell, PE Project Manager Research Triangle Park, NC Post Office Box 14005 Research Triangle Park, North Carolina 27709 2905 Meridian Parkway 01 North Carolina 27713 80L -5646 919287.4262 919-361-2269 Fax www.ecoengccom I Design Services Focused On Client Success -7-20-091 Silver Landing Phase II Stormwater Impact Analysis Stormwater Management Facility Design General Description Located off of Steele Creek Road, just southeast of the intersection of Steele Creek Road and Byrum Drive in Charlotte, North Carolina, is the proposed development currently known as Silver Landing. Proposed development on this site consists of the construction of industrial buildings along with associated parking and utilities. This site is located within the Central Catawba Watershed. The site is zoned I-2 and the proposed development is considered high density. Per City of Charlotte Post Construction Controls Ordinance, stormwater management on this site shall address water quality and peak discharge rates. Peak discharge rates associated with the proposed development shall be no greater than the pre-development peak discharge rates in the 2-, 10-, and 25-year 6-hour storms events. Additionally, 85% TSS removal is required. One stormwater wet pond is proposed to mitigate the effects of increases in stormwater runoff peak flow rates as a result of the development while also providing water quality. The Pre-Development model consists of two drainage basins. These drainage basins are bound by the site boundary and topography. The site as it exists in the pre-development condition has some minor improvements with the remaining area being approximately 50% wooded and 50% open. The Soil Conservation Service TR-55 method is used to calculate the Time of Concentration ("Tc") for each subbasin. The Post-Development model consists of two drainage basins. Most of Subbasin 2 has been re-directed toward the proposed pond therefore the resulting stormwater effects from the proposed development in Subbasin 2 are less than the predevelopment condition. The drainage area to the pond considers any contributing offsite are to ensure the facility is properly sized for its water quality function. Therefore, the total drainage area in the post-development condition is larger than in the pre-development. The proposed stormwater management facility is located within a permanent detention easement south of the subject property. Because the facility is located offsite, the point of analysis for Subbasin 1 in both the pre and post condition is located offsite as well. This was done to ensure consistency in the pre and post peak flow rate comparison analysis. Stormwater Wet Pond Design The stormwater wet pond is designed in accordance with Charlotte-Mecklenburg BMP Design Manual (April 2008) to achieve a TSS removal efficiency of 85%. The pond also works to achieve peak flow rate control in the post-development condition for the 2-, 10- and 25-year storm events. The facility has been designed to pass the 100-year, 24-hour storm event with a minimum of 0.5 vertical feet of freeboard in the "worst-case" scenario. This scenario assumes that the drawdown orifice is clogged and the basin is full of water to the top of riser elevation at the time of a 100-year storm event. This routing technique ensures adequate freeboard in an unlikely scenario. The permanent spillway for the pond is a riser-barrel spillway system. The spillway crest elevation was set to provide adequate detention. An inverted pvc siphon controls the normal water surface elevation. Calculation Methodolozy • Rainfall data for the project site is from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 (http://hdsc.nws.noaa. og_v). The partial duration series was used for the 2- and10-year storm while the annual duration series was used for the 25- and 100-year storms. • Using the Mecklenburg County Soil Survey, the proposed site contains HSG `B' soils. Composite SCS Curve Numbers were then calculated based on this soil group and land cover conditions. These composite curve numbers were then used in the peak flow calculations. The soil survey map from which the soils were determined for this analysis has been included in this report. • Onsite topography is from the survey prepared by the John R. McAdams Company, Inc. Off-site topography is from Mecklenburg County GIS. • The time of concentration for each subbasin was calculated using the SCS Segmental Approach (TR-55, 1986). The Tc path was divided into segments consisting of overland flow, concentrated flow, and channel flow. The overall time of concentration is the sum of the individual segment times. • HEC-HMS Version 3.3.0, by the U.S. Army Corps of Engineers, was used to generate pre- and post-development peak flow rates and volumes as well as model the proposed stormwater management facilities. • PondPack Version 8.0, by Haestad Methods, was used to generate the stage- discharge rating curve for the proposed stormwater management facilities. An additional curve was generated to represent the worst-case scenario. This pond routing assumed a starting routing elevation set to the top of the weir structure for the 100-year storm. Discussion of Results The proposed stormwater management facility provides detention for the site for the 2-, 10-, and 25-year storm events. The facilities also pass the 100-year storm with adequate freeboard. All calculations associated with pre- and post-development as well as the design of the stormwater facility are shown in this report. If the development is built as proposed within this report, all applicable design criteria will be met. However, modifications to the proposed development that change assumption made in this report will invalidate this report. Some modification may include, but are not limited to: 1. Changes in the amount of proposed site impervious surface area. 2. Changes in proposed grading, to affect drainage breaks presented in post- development. Please refer to the design drawings and the appropriate sections of this report for additional details of the methodologies and design details. Silver Landing Phase II STORMWATER MANAGEMENT CALCULATIONS J.C. Diaz, PE IBC-08030 Summary of Results 7/16/2009 Subbasin #1 Event Pre-Development [cfs] Post-Development [cfs] Change [cfs] 2-Year 4.0 1.1 -70% 10-Year 19.6 8.4 -60% 25-Year 31.9 31.0 -3% Subbasin #2 Event Pre-Development [cfs] Post-Development [cfs] Change [cfs] 2-Year 0.5 0.3 -30% 10-Year 2.7 1.4 -50% 25-Year 4.6 2.1 -55% Stormwater Wet Pond Design Summary WQ„ / PPS Ratio = 0.4 Norwal Water Surface Elevation [ft] = 673.50 To of Dam [ft] = 680.00 2-Year WSE [ft] = 676.43 10-Year WSE [ft] = 677.71 25-Year WSE [ft] = 678.04 100-Year WSE [ft] (Worst Case Scenario) = 679.35 Worst Case Scenario (100-Year) Freeboard [ft] = 0.65 X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\SOR Page 1 of 1 1 CITY OF CHARLOTTE DESIGN SUMMARIES 2 BACKGROUND INFORMATION 3 PRE-DEVELOPMENT HYDROLOGIC CALCULATIONS 4 POST-DEVELOPMENT HYDROLOGIC CALCULATIONS 5 STORMWATER MANAGEMENT FACILITY DESIGN CITY OF CHARLOTTE DESIGN SUMMARIES SILVER LANDING PHASE II IBC-08030 chadattwMeckknMnp STORM WATER _. Sernees -U BMP Inset Table Wet Pond Project Name: Silver Landing Phase II Se uence ID: Surface Areas . ft.: 37,880 Drainage Area acres : 35.3 Land Use/Development Type: Office / Warehouse Percent Built-Upon Area: 61% Permanent Pool Depth ft.: 6.5 Foreba Permanent Pool Depth ft.: 6.5 Flow Diverter Present Y/N : N Regulated B : PCCO - Central Catawba Treatment Effectiveness: TSS Only NC State Plane X eastin : 1416291 NC State Plane Y northin : 528701 31? vsm? ?! ?'.`uti. w. u , :,a k?rc ?"s'',fi? e:rt: »t'ri..a !w n }4?rr:?.att2a,ra.: ?., x ..,1: t .?• t, ut.r Design Procedure Form Wet pond ?. , .._, i. L.:-.. ,. _,t:l,.. ::yY t:i ?,5'. ??• } X':, 1.... ._.. r. _ ?, ..L,i W.. ....? :'zi,?.4? oA....n,.l:;;. eel 'futT.rK?.: ..,r, ... .. .l J,?i?.? ? vyi.. WET POND FEASIBILITY 1. Is the use of a wet pond appropriate? 2. Confirm other design criteria and applicability. PRELIMINARY HYDROLOGIC CALCULATIONS 3. Compute, WQ„ water quality volume requirements Compute Runoff Coefficient, R, Compute WQv Volume requirements 4. Compute WQP peak flow Compute modified SCS curve number 5. Compute CP„ Compute S (maximum retention) Compute 1-yr, 24-hr total rainfall depth Compute Qd (runoff volume) Compute CP„ (chnnnel protection volume) Estimate t, (time of concentration) Estimate q„ Compute approximate storage volume 6. Compute release rates Compute WQ„ release rate Compute CP„ release rate 7. Compute site hydrologic input parameters Development Conditions Area CN (SCS curve number) Adjusted CN (curve number adjusted for 1-inch storm) Time of concentration NOTES: The Silver Landing Phase II development requires a wet pond to meet the PCCO requirements of 2-, 10-, and 25-year storm event detention and 85% TSS removal since it is a high density project in the Central Catawba and zoned 1-2. The Modified SCS Curve Number and Channel Protection Volume were not calculated as part of this analysis since they were not used in any aspect of design. For further details please refer to the stormwater impact analysis. Rv = 0.60 WQ„ = 1.76 acre-ft WQP = N/A cfs CN = N/A S = N/A Rainfall Depth = N/A inches Qd = N/A inches CPv = N/A acre-ft tc = N/A hours q, = N/A cfs/mil/inch Storage volume = N/A acre-ft Release Rate = 0.30 cfs (peak siphon flow) Release Rate = N/A cfs (SB1) (SB1-TOSWMF) Pre-developed Post-developed 29.92 acres 35.30 acres 59 84 N/A N/A 0.21 hours 0.08 hours STORM WATER DETENTION BASIN DESIGN 8. Pretreatment volume Volpre = Acres of Impervious Area(0.2")(1712") 9. Compute Permanent Pool Volume and Water Quality Extended Volume Compute WQv/PPv Compute PP„ Size extended detention - pool volume is greater of WQ„ or CP„ WQpre = 0.35 acre-ft WQv/PP„ = 0.4 PPv = 4.09 acre-ft ED Pool Volume = 1.76 acre-ft 10. Conduction grading and determine storage available for permanent pool (and WQv_ED volume if applicable) Prepare an elevation-storage table and curve using the average area method for computing volumes. Elevation SL Area F Average Area SF Depth t Incremental Volume CF Cumulative Volume CF Volume above Permanent Pool (acre-ft) 667.00 21227 -6.5 - 668.00 22932 22080 -5.5 22080 22080 - 669.00 24688 23810 -4.5 23810 45890 - 670.00 26498 25593 -3.5 25593 71483 - 671.00 28363 27431 -2.5 27431 98913 - 672.00 30354 29359 -1.5 29359 128272 - 673.00 33385 31870 -0.5 31870 160141 - 673.50 37880 35633 0.0 17816 177957 - 674.00 42256 40068 +0.5 20034 197991 20034 674.50 43788 43022 +1.0 21511 219502 41545 675.00 45688 44738 +1.5 22369 241871 63914 676.00 48477 47083 +2.5 47083 288954 110997 677.00 51312 49895 +3.5 49895 338848 160891 678.00 54193 52753 +4.5 52753 391601 213644 679.00 57128 55661 +5.5 55661 447261 269304 680.00 60114 58621 +6.5 58621 505882 327925 /: , 1 12. WQv Orifice Computations Average ED release rate Average head, h = (ED elev. - Permanent pool elev.) / 2 Area of orifice from orifice equation: Q = CA(2gh)0.5 13. Compute release rate for CPv control and Establish CPv elevation Release rate Average head h = CPv elev. - Permanent pool elev) 12 Area or orifice from orifice equation: Q = CA(2gh) 0. 14. Calculate Qp release rate and water surface elevation Release Rate = 0.21 cfs (average siphon flow) h=0.88ft A = 0.05 ft2 Diameter = 3 in WSEL = N/A ft Release Rate = N/A cfs h=N/Aft A = N/A ft2 Diameter = N/A in Set up a stage-storage-discharge relationships. 16. Assess maintenance access and safety features. 17. Attach landscaping plan v, Peak stage for (WQv), the 1-inch, 6-hour storm Peak Stage= 674.75 ft Peak stage for (CPv), the 1-yr, 24-hour storm Peak State = N/A ft Peak Q1o - Undeveloped Q1o-..dev = 19.6 cfs Peak Q1o - Developed Q10-dev = 8_4 CfS Peak Q25 - Undeveloped Q25-undev = 31.9 CfS Peak Q25 - Developed Q25-dev = 31.0 cfs Size emergency spillway, calculate 50-year WSEL and set top of embankment elevation WSEL100 = 679.35 ft Embankment Elevation = 680.00 ft 15. Investigate potential wet detention basin hazard Notes: Refer to construction drawings, sheets SW- classification 1A, SWA B, SWA C, SWA D, SWA E, SWA LS for pond details. City of Charlotte Land Development Division Post Construction Controls/Detention Worksheet The following section is information that is required by the City's NPDES permit for permanent tracking of proposed BMPs and compliance with the Post Construction Ordinance. Complete all information. Project Name: Silver Landing Phase II Date: July 16, 2009 Project Address: 6821 Steele Creek Road Subdivision Name (if different from above): Phase: Developer Name: Development Type (circle one): Single-Family Multi-Family Mixed-Use Commercia Institutional Owner Name: Davidland LLC Owner Address: 6707-C Fairview Road Charlotte, NC 28210 Owner Phone: Main: (704) 362-0404 Fax: (704) 362-2279 Owner e-mail: Total Project Area: 31.99 acres Total Disturbed Area: 37.60 acres Zoning: I-2 CD Watershed: Central Catawba X Western Catawba Yadkin Six Mile Original Parcel ID(s) portions of the following parcels: 14104107, 14104104, 14104103, 14104102 % Built-Upon Area: 66% Stream Buffer Area: 0.16 Natural Area: N/A Mitigation Distressed Business Distri ? YON Is site under one acre? Y Natural Area mitigation? Y Revised: August 2008 Transit Station Area? Y NO Total Phosphorous Mitigation? Y O Pagel of 4 The following sections help to provide information on volume and peak controls for the site. Attach BMP Inset tables and Design Procedure Forms for each BMP to show that each is sized appropriately per the design requirements. Project Description: Attach brief explanation of detention plans and any assumptions if necessary. This detention worksheet applies to Subbasin 1 only. There are no stormwater management facilities proposed in Subbasin 2. Subbasin 1 has two parts in the post-development condition; 35.30 acres goes to the proposed pond while 3.67 acres are undetained. Refer to the appropriate sections in the design report for maps detailed descriptions and calculations. PRE-DEVELOPED SUMMARY Basin area: 29.92 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpre: 12.50 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Mecklenburg Storm Water Design Manual - SCS Travel Time. Curve Number, Cnpre: 59 POST-DEVELOPED SUMMARY Basin area: To SWMF = 35.30, Bypass = 3.67 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpost: 5 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Mecklenburg Storm Water Design Manual - SCS Travel Time. Runoff Coefficient, Rv-0.60 Water Quality Volume, WQv (ac-ft)- 1.75 Curve Number, Cnpost: To SWMF = 84, Bypass = 61 Curve Number, CNpost(modificd)-N/A(see WOv and siphon sizing ca!2L Channel Protection Volume, CPv (ac-ft) - N/A CPv Release Rate (cfs) N/A DETENTION SUMMARY Computer Method Used*: HEC-HMS version 3.3.0 *Land Development Plan Review Staff will verify all detention submittals using HEC-I for compliance with the City of Charlotte Zoning Ordinance, Section 12.6 This summary is to accompany all detention analysis and is not intended to replace that requirement. Pre (cfs) Post (cfs) Routed (cfs) Elevation (Comments) 1" N/A - - 674.75 (see WQv Calcs) 1 yr. N/A - - - 2 yr. 4.0 97.5 1.1 676.43 10 yr. 19.6 162.1 8.4 677.71 25 yr. 31.9 194.7 31.0 678.04 50 yr. N/A - - - 100 yr. N/A - - 679.35 Note- 2-year storm is required only for sites required detention per Chapter 12 of the zoning ordinance. If a downstream analysis has been performed, submit complete justification for the results. Revised: August 2008 Page 2 of 4 PRE-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: 1 (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannin s (n) Time (min.) Sheet Unpaved 50 2.8 0.24 6.98 Sheet Paved - - - - Shallow Conc. (Unpaved) 478 7.6 - 1.79 Shallow Conc. Paved - - - Channel 1299 3.1 0.045 3.74 Pie - - - TOTAL N/A N/A N/A Tc pre = 12.50 min Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreage/Total Area) x (CN) 0.24 Impervious 98 14.70 Wooded CeB2 C D2 PaE B 55 0.30 Water - 100 14.68 Open --CeB2. 2 CNPre = 61 POST-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: SubbasinI - To SWMF & Bypass (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved Sheet Paved Shallow Conc. (Unpaved) Shallow Conc. Paved Channel Pipe TOTAL N/A N/A N/A Tc po.t = 5 min *Per SCS Segmental Approach, a min Tc of 5 min was used for a conservative design Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreage/Total Area) x (CN) 21-45 To SWMF -Impervious 98 12.8 To WMF - Open eB2 D2 PaE B 61 0,87 T SWMF - Water - - 100 1. 1 Bypass - Open CeB2 CeD2 PaE B 61 CNPost = To SWMF = 84; Bypass = 61 Revised: August 2008 Page 3 of 4 STORAGE / DISCHARGE CALCULATIONS *(If applicable) Complete Underground Storage Volume Table Elevation Underground * Above Ground Total Acc. Volume (cf) Acc. Volume for all Structures c Area (sq. ft.) Inc. Volume (cf) Acc. Volume (cf) (Above and Underground) NWSE = 673.50 23927 674 29454 26691 26691 26691 676 32669 31062 57752 57752 678 34995 33832 91584 91584 680 37371 36183 127767 127767 Stage Discharge Co= orifice coefficient: Cw = weir coefficient. Orifice Area unit shall be square feet (sf). Elevation / Orifice 1 Orifice 2 Weir 1 Weir 2/Em. Outlet Emergency Total Q Stage 3 In. In. Ft. Spillway Control Pipe Spillway (cfs) (ft) 673.50 Inv. Inv. Inv. (Controlled by 48 Dia. (Free flow out of 0.05 sf Area Area Cw= outlet pipe/struct) 96 Length pond) Co= 0.60 Co= 24 Ft. 667.00 Inv. Ft. 677.50 Inv. Co=0.6 Inv. Cw= 3.0 Cw= 673.50 0.00 0.00 0.00 0.00 677.50 0.47 0.00 0.47 0.47 678.00 0.49 25.46 25.95 25.95 680.00 0.00 202.56 202.56 202.56 Underground Storage Volume Table (If applicable) Provide additional storage volume tables if more structures are used. Elevation Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) • aM. ENGINEERING 4 PROPERTY MANAGEMENT Land Development Division 600 East Fourth Street, Charlotte, North Carolina 28202-2844 Revised: August 2008 Telephone: 704/336-6692 Fax: 704/336-6586 landpermits.charmeck.org Page 4 of 4 BACKGROUND INFORMATION SILVER LANDING PHASE II IBC-08030 Mecklenburg County, North Carolina POLARIS Property Ownership Land Records Information System Date Printed: Tue Jul 14 200915:08:22 GMT-0400 (Eastern Daylight Time) Silver Landing Phase II 14120102 t ? t'i y t f J. __ ti 14120201 _-_- i 14120107 11120103 11472145 14120106 _ 14112120 14123103 14172148 14120106 --_'__ - =rf S 4TS 1 1/172118 14112110 11 = 14104103 - 14112126 i41121ZS I _ ~--- t 14104104 14104102 14112123 -- - :n _ i 14112109 --- ?? _ _ e 7/112124 114126184 14104107 ' - -- 14104108 1/126169 - jJ 14104122 -- i - /1 14104101 14126183 26182 14126192 141,26181 14126150 14126149 L •? 14126151 ' i 114126/8S 14104123 i 141t26179 14126152 1- \x? 14121101 14126155 14126146 14126186 14126146 ', l1 ~ -_ - - i' 14126147 S.+ /14121111 14121t12 _ --- 1 1 r 74126140 - F -_ --_. 14121120 _ •. ? .?? 14126141 14126143 14126145 t- CKLENBURG LUUh iY GIS, 717261// + "It utz673a""""14126142' 1 1, I 0 545ft _ This map is prepared for the inventory of real property within Mecklenburg County and is compiled from recorded deeds, plats, tax maps, surveys, planimetric maps, and other public records and data. Users of this map are hereby notified that the aformentioned public primary information sources should be consulted for verification. Mecklenburg County and its mapping contractors assume no legal responsibility for the information contained herein. Jl1 t 4? ? 1 ) O O f,'?> ts' \u Y7 } 1 f'. 'a. ?` f +?'t• garA'?nri` { ,1..11. r 10 CI) d 1_ " ?' { 1 + v f S 1 .'` f off ' i •) ` y ,. ?;, mil` _-? S '.? Y ?i ! 'tia ?- ! 1 •?L'!).? 1 ln?A ?•.? .s" Q/I 1 A:,r 3 irk I 1 1 ?. "« y. ' ".,r 1255 r t-- f f, r f !!11" r" o M l ."'.? f !(rr I i ? ?A._ t ( •\? `1 ? ? \ _??1?1 ? 11 {? ?1$ a i,- P r° ? d y' ?,Fr?) t? °j r i.. .,,,,_„?,, - . ;? { _ ..,1 r e `?r i ? ?a{?r Y? -+'•? -'i(.f i ?F'j• I.? f r(r __ } 4 - f? ?r? '7il r rl_ :. "a z {3' LO .' rr' { < t ?t et j?i f>, !z_ ? .-? Y / •>•r ? rt ?? ? ? wa,?'"?.'1? ` ,? ? ?. {?? '? •? : F ..-"J.'fsf..? } i «_•y ``. i?..J } ? ? .T?"^-mow. •. ? ... r I i, .% ? ? , "•..r%?I 1t..,...,?..i` t ? 1 zzj 9 r ? p.. a f.r f t:. ? -.. ?"_."_ 7? ' ? ? - ? _ ?.. ?{A ;ti "` ? .? r? ? • f -a, t '? t 1 S le: ?'. ? /r. -" a''' .?'r 1 w ?f?? $ +'a ?. +t`.. ? ` `'? ?'i ? r _ ?'.., `A ? 1:. ^ - / t t •.. 4 1 7{ s" L fV X 1 1 ?I .. T -: P•.!F ?. ?" ,•{+ _9r 74 1 a ? •J1 F ?t +\a ? f ?' ,e.?+. ? 1 :'`-+M IS I' ' '..A /! I ! i `0 a Crock' o 0- 4 lip C, V, _ - i i rr ? i s t ^'?...,,,•.. {t? ? ?''r? +.+C . ?' 'ti. '"d' • _ ? tr ?' -' i ? ? rJ 'i j. ?"`°?? • . nk LO • CI) Cl) C, F , r t y 1 Name: M:\NC5pro\35080B8A.P24 Location: 035° 11'20.22" N 080° 57'28.97" W Date: 7/14/2009 Caption: Silver Landing Phase II Scale: 1 inch equals 1000 feet i v aF per WkF to i CeB2 ? ? PaF pa tl O PaF f ems? ?t > PaE - C ..; eeU i J PaF a A A CeD2 aF dF CeD ?Ya? o n f ? t 82 _ O ?.ep? -'PSI PaF PaF ?CeD? PO? PaE i .o ...P .r ' Ce0 tia D2 - CeB2 PaL, t ... R 1' ` CeD2 5 A 'S4 . L 2 ceD k s i t . ' ? L..r i r rpl Ce C 02 , k ei Aa r '?4 F sib. . 0 e { " w Cet)2 d ? Ge r'l?a? PaE a« t p per a '. aF 5 h a/ aE 1'aE Ce82( r MO. CeD2 i??92, Dab Q ? k? ? $ t" w S a 4 S ` e MeD .- .., _ ' MeD '-o r ? .? 'PaE -z d , ; PaE 1. c. j v w 0 ? b Mee b / - 3 MeD M6B ba ?1SI AAeB-. D59 ? e'er PaE i IrB i i Ifl1e8 I?B Mg0 . CeE e '? M? "1rB ` ? !e u'o ,DaD ?'? • ti IrB ".? . , ~. +.. e MeB l D - 1' \ 4 5 ?` 3 dap k 2i UJ He..' CeB2 . t w , r_ ion ... - .. Y. 0 I 2 Wes es 5000 4000 3000 2000 1000 0 Scale 1:24000 5000 10000 Feet MLCKLENRURG COUN 1 Y, NORTH CAROLINA NO. 6 SHEET NUMBER 6 eD2 " C.eD2 La = ( MECKLENBURG COUNTY, NORTH CAROLINA K CeB2 PaE Ac D ?? M a e 2 U HOB F CeD2 5 , W 4a? S DWe ? Q m " K 2 ? fir. C \, - CeB2 EnD< ' ?? / web ? 02 H. ? 4 C?If2 : „?\ e C Cee scQ c3333 55 3 7 J ° a a N p ° d 05c m i ' G 0 0° ° o , 3 3 3 u S ? " < u ? O ? ? ? m W N 0 0 • 00 - m u -`° " ?m a N O - ° X 3 m A? u 33 N^ m - - c m m 0 ? m -I » 3 o 0 0 ? N N > N N r N < i u fT 2 ... ? o < o c ? ? a c 7 d .ate c m m v ° o ^ ° „ o o a O. > j c° c c yc m A R G G O??ag C ? u u 3 d° ? r m n < a 3 3 G v N y G D > > 0vNiw o m °m > >,?,a m 333 a D' a00 ? 00 7 x-'o xAN 333 N •00 ? N Cam... C m m W N °p, D L N- n a x 0 0 D OJ n n 0 0 ° L n ? A u m DO O" a 3 0 0 m u u ?» O u n n ^' 3 H N N 0 H a ? 6 a? H H N m m ° d ? N a3 O N O d < < D o 3 3 0 0 - W DJN3 x? 0 0 m N N " O o O n D m 00 O] m ^ ? m D uo if ? n ? ? m 3 u u O .?. O ? m a 0a a < < d J ] < n > 7 00 0. a.G >jyy a? O]N ?:?? oo u °°m 33 3 3 3 3 d d o jF j as r.? W N tnD 33.3 xx o0 O O -. ap W N d) N.+ W ND A ?9 O O O 0 0 "a NtrO 0DnA ^ ?" O ?L m D m " ? - O D D m a n i+ .?. n u m° O " A u O p ^ ? i ? ° tLe ? O u p ? r ? m O o a ? a a z D m N ? I O 0 G x p n D o j O a d d - d 3 3 N ry o ? a Q? 0 m d d o H c °<? d a r- *r -0 m m O m D O D O O O D Z tni D N = m r x o m O m y m a n p : m rm c c m 0. O v .n.0 ?. m 3 o 1 i rD O Z C m m c c N TO 3m 3 3 a d m d i O D m mm m a g m 3 = y Ua E a ch op o °- n 3 a a n ao . d m o ° o < q 0 J 0 D 3 C d a .? K .Z7 D a d O m ... c n < V; d A- co 0 O ? o m c y y A. < O 0 m ° y N J 7 7 y ° ° ° 3 r o. n D 3 m 7- a A ce D Z ,d.. O 1 » • ?. ° J N m d : ? a a . . . O 3 Q 3 Z p ° z z j N o N V y ?. d N N - . . p o o !n >N .7 N n c0 d "• z J- : O o' = o > > `"OZ s O m ? f w Mm m gA' < -4 nn d A 0 J "tea D o m < - m m > x a O o 5 O Z y a d 6 = - = I ? o CO Q G i > ;?? + s ?_1, I i ?L L? N y om m o'? T. T f7 O ? D X ? --1 r y J n m 0 - 7' d a M r cD - N O O d d 1 d fD M A fD eo D = CL ` d x O n d 7 T c d O 3 m (? ,a 00 r z v "0 1 ' 0 c o m d ° m = 3 d Z N m z O ? ao ° n m 3 o ? m 0 Q J o. m o' lu c o y N Z d J to o. ?- o° n m J c? ate' c O y O o c ?' m T Q Q ° m m m - .? m coo .? fD- .? r -M m d T v c 1 m N J D T m m m C C m "; I l m c " -? _' a o on m c d c a J 3 N ? C7 L7 an M W O cn N N N N m v 0 0 0 A co n 'v r O O w n O ?e w m ^ _o c c A JD O' n n n rn O 14 r D o D 3 N y O. J So x v 3 m y o H o m ° Z d O m N d m z _ < m c , N? =v da x p gm z oQ o° _ a r cy a d o = m .. dr.0 d C to J o-4 c 0 CL N O ?/ . N a a , u N N m - O a ti z o ?' o $ Ja D m d d " 3 Q o oO m 'o o D c N D a z D c d fir: .,?.N b < D a c cn n N 3 3 - N Silver Landing Phase II IBC-08030 Watershed Soil Data Project Site J.C. Diaz, PE 7/16/2009 Symbol Name Soil Classification Ce132 Cecil sandy clay loam B CeD2 Cecil sandy clay loam B PaE Pacolet sandy loam B References: 1. SOIL SURVEY: MECKLENBURG COUNTY. NORTH CAROLINA. UNITED STATES DEPARTMENT OF AGRICULTURE: SOIL CONSERVATION SERVICE (IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT STATION). 2. SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. H, 1 M1 1 } r OAT Cover Condition HSG'B' Wooded 55 Open 61 Impervious 98 Water 100 X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Watershed Soil Data Page 1 Precipitation Frequency Data Server yr POINT PRECIPITATION { FREQUENCY ESTIMATES { ?? `' FROM NOAA ATLAS 14 'v,,,,, ,,? North Carolina 35.1884816 N 80.9613194 W 695 feet from "Precipitation-Frequency Atlas ofthe United States" NOAA Atlas 14, Volume 2, Version 3 GM. Bonin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D Riley NOAA. National Weather Service, Silver Spring, Maryland, 2004 F.rztrae A Tun FA In )nno Confidence Limits Seasonality Location Maps Other Info. GIS data Maps Docs R Precipitation F nen Estimates (inches) ZQ ?4 4? O , ?Q ? ?4 I [ l5 [ 1]5 '4 121 I il 1 P m ,n = min ?&X ?y m La 3 - C d hr 41-k H H ku -n M m HhK r -21® .70 0.87 1.21 1.52 1.76 [58-712.26 2.69 .10 .63 4.05 4.62 5.29 7.03 8.65 10.83 12.84 0T-5-4Q 0.86 1.09 1.55 198 .32 .48 3.00 3.57 .13 .80 5.30 5.97 - - - 6.75 8.81 10.67 13.13 15.39 10 F 6 0 1 ®1.21 1.76 2.29 2.70 .89 3.51 .20 .85 5.62 6.18 6.90 7.73 10.00 11.98 14.58 16.97 ®.67 1.06 1.35 ®® 3.17 ® 4.18 5.04 5.79 6.68 7.32 8.14 9.00 11.52 13.60 16.32 18.86 ®0.71 1.13 1.44 .16 .93 .51 .85 .70 5.69 6.52 7.49 8.20 .08 9.95 F]2-6-61 H79] 17.59 20.21 100 0.75 120 1.51 .32 .19 3.86 .27 5.23 .36 726 8.32 9.10 10.04 10.92 13.81 15.97 18.81 21.50 ®0.79 1.25 1.58 2.46 ® 20 .71 5.77 7.07 8.02 9.17 10.02 11.-03 11.90 1497 7-1-51 F 20 00 22.76 ®0.83 1.31 1.65 ®.77 .65 5.29 6.52 8.05 10.33 11.27 12.37 13.21 16.54 18.-7-11 F 156 24.40 1000 0.86 1.35 1.70 .75 Ol ®5.75 7.11 8.84 .87 11.23 12.25 13.42 14.23 17.74 19.90 22.72 25.62 * These P1eitWalion kte*w y edmales ant based on an amudmaimamm AEP a the Amtal Etaceedalce Probabidy. Please refer b NOAA Alas 14 Document for more inkinwimt. NDTF- FanW%Totes es6nales Itew zao tp appear a zero. * Upper bound of the "% confidence interval Precipitation Frequency Estimates (inches) AEP** 60 IZII 3 6 12 24 48 4 7 10 20 30 45 60 (14n- 10 15 Il] mm n min hr hr hr hr hr day [day day day day day day [Ma min mi F i 0.47 0.?5 0.95 1.31 1.64 1.94 2.06 .48 .95 .35 3.92 4.35 .93 5.65 7.46 9.14 11.35 13.42 ?? 0.58 0.93 1.18 1.68 .15 .55 2.72 .29 91 1 -1 ®5.17 5.70 6.37 7.20 9.34 - 11.28 13.76 16.08 10 0.65 1.04 1.3 111 .90 .47 ®3.18 .85 .59 5.24 -5-71 6.63 7.37 8.24 10.60 - 12.66 15.28 17.74 11 L?J 0.72 1.15 1.46 2.16 .87 3.47 .78 .57 5.49 6.25 7.19 7.86 8.68 9.59 12.22 14.37 17.12 19.72 ®0.77 122 1.55 .33 .16 3.85 F2-315.13 6.19 7.03 8707 8.81 .69 10.61 13.43 15.64 18.45 21.15 100 0.81 129 1.63 .50 3.44 ?® 5.71 6.91 7.83 118.96 9.77 10.72 11.65 14.65 16.91 19.75 22.51 ®0.85 1.35 1.70 .65 0 .61 5.16 6.30 7.67 8.65 .88 10.77 11.79 12.69 15.89 18.17 21.03 23.85 ®0.90 1.42 1.79 .85 .08 5.11 5.82 7.13 8.72 .78 11.15 12.12 13.24 14.11 17.58 19.85 22.69 25.58 1000 0.93 1.47 1.84 .98 .35 5.49 6.34 7.78 9.59 10.66 12.13 13.17 14.37 15.21 18.89 • 21.15 23.95 26.89 The ttppa bound are eaidgrce inlelwl A90% 11 tgce lave) B the value ttdtidt sAama dwAled quartk values for a pirat teoutm are wester a m These precipision kagteo y esinales we based on an jamwLma4nLWdM AEP is to Anatol Eweedace Pmbabny. Please Rifer to NOAH Alas 14 Document for mom irlonmiaR NOTE: Fgng111M pram is esGnales new zero to appear as zero. * Lower bound of the 90•/w confidence interval Preci itation F nen Estimates (inches) AEP* (14* 5 10 15 30 60 12,011 3 6 12 24 nh 4 7 20 30 45 Y) main min min min min hr hr hr hr day day day day day day day ?? 2 0.40 ® 0.81 1.12 1.40 1.61 1.71 .07 .47 .89 3.38 3.77 .33 .97 6.65 8.20 10.32 12.28 5 0.50 .79 1.00 1.43 1.83 .1 I 26 .75 ® 3.84 4.46 .93 5.59 6733 8.32 10.10 12.51 14.71 10 0.55 .88 1.12 1.62 .11 .45 .63 3.21 3.84 .50 5.21 5.73 6.46 7.24 9.43 11.33 13.88 16.22 Z 0.61 ®124 1.83 ®.87 .11 .80 .57 5.35 6.18 6.77 7.58 8.40 10.83 12.85 15.52 HE ® 0.65 1.03 1.31 1.97 .67 .16 .47 .24 F5.112-f--0-11 6.92 7.56 8.44 9.28 - - - 5 11.88 13.94 16.69 19.27 100 0.68 1.09 F 3 71FI 0 1 ®3.45 3.82 ® 5.67 6.68 7.66 8.38 9.32 10.16 12.93 15.03 17.81 20.47 200 0.71 1.13 1.42 .21 .10 .74 .17 5.1 I 6.23 7.35 8.43 9.20 10.20 11.04 13.98 16.09 18.92 21.64 ®0.74 1.17 1.47 ®.36 ®_61 5.69 6.98 8.27 ®10.32 11.40 12.22 15.39 17.52 20.34 23.14 1000 0.76 1.19 1.50 .43 3.54 .34 ® 6.13 7.57 8.99 10.26 11.18 12.33 13.14 16.48 18.57 21.41 24.26 Thy brrer band d tle coltdace ilkrval at 90X calydace lord is tle trahle which 5%d tle aitaAaYd auatdie values for a aim f emancw are am- than 'toe "Waen tregtratty agnates am based an an MEP is the AnnW F.xceedatce ProbAft. Page 1 of 3 eturn to State Map http://`hdsc.nws.noaa.gov/cgi-binlhdsclbuildout.perl?type=pf&units=us& series=am&staten... 2/10/2009 Precipitation Frequency Data Server POINT PRECIPITATION F FREQUENCY ESTIMATES FROM NOAA ATLAS 14 w% ti,,w North Carolina 35.1884816 N 80.9613194 W 695 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzyhok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring Maryland, 2004 F:tractnl- Tne Feh to )MU Confidence Limits. Seasonality Location Maps Other Info. GIS data Maps Docs R Precipitation Frequency Estimates (inches) AR min ? 4! a M Min a? 1 C hr Pcwa??1 da 1 0.40 0.64 0.80 1.09 1.36 1.58 1.69 2.04 2.42 2.79 .27 3.67 4.21 4.83 6.47 7.99 10.04 11.94 L 2 J 0.47 0.76 0.95 1.31 1.65 1.91 2.03 2.46 2792 3.37 3.94 4.40 5.02 5.74 7.64 9.39 11.76 13.94 5 CS? 0.55 0.8 2.5 81. 11 I.58 2.03 2.37 3 3.07 3.65 4.22 .91 5.42 6.11 6.91 9.01 10.92 13.43 15.74 10 0.61 0.97 1.23 1.78 2.31 .72 2.92 3.55 .24 4.90 5.67 6.24 6.97 7.81 10.10 12.10 14.72 17.14 25 0.67 1.07 1.35 2.00 .67 3.18 3.45 .20 5.06 5.82 6.71 7.35 8.17 9.04 11.57 13.65 16.39 18.94 so 0.71 1.14 1.44 .17 94 .53 3.87 4.72 5.71 6.55 7.53 8.23 9.12 9.99 12.71 14.85 17.66 20.29 100 0.76 1.20 1.52 2.33 3.20 3.87 .29 5.25 6.39 7.29 8.36 .13 10.08 10.96 13.86 16.04 18.88 21.59 ® 0.79 1.25 1.58 2.46 3.46 .21 4.72 5.80 7.10 8.05 9.21 10.06 11.07 11.94 15.03 17.22 0.08 22.85 ®0.83 1.32 1.66 2.64 3.79 4.67 5.31 6.55 8.08 F-0-91,0-3-8 11.32 12.42 13.27 F16-6-01F18-7-91F] 64 24.49 1000 0.86 1.36 1.70 2.76 .03 5.01 5.78 7.14 8.88 9.91 11.28 12.30 13.47 14.28 17.81 19.98 .81 25.72 t rase Pretapcsoon ftaq CY eswrrates are eased on a OKULAuMumli, AN is the Average Rwirrence In erval. Please refer to N9M Atlas 14 Docurrgnt for more iMamaft. NOTE Formatting forces estimates new mo to appear as zero. * Upper Precipi bound of the 90% confidence interval tation Frequency Estimates (inches) ARI** 5 10 15 30 60 120 (years min min min min min min ] 3 6 12 24 48 4 7 10 Fill - 30 45 60 hr hr hr hr hr [d J- 0.43 0.69 0.86 1.18 1.47 1.74 L " y , da day day 11 day 1.86 2.24 2.65 3.01 3.53 3.94 .49 5.16 6.87 8.44 10.55 12.51 ? LJ 0.51 0.82 1.03 1.42 1.78 2.10 2.23 2.70 3.20 3.63 4.25 .73 5.36 6.13 8.10 9.93 12.33 14.57 0.59 0.95 1.21 1.71 .20 2.61 2.79 3.37 4.00 4.56 5.29 5.83 6.52 7.36 9.56 11.54 14.08 16.45 10 0.65 1.05 1.32 1.92 2.50 2.99 3.21 3.89 .63 5.29 6.11 6.70 7.44 8.33 10.71 123 9 15.43 17.91 [5I 0.72 1.15 1.46 .16 2.88 3.48 3.79 .59 5.51 6.27 7.21 7.89 8.71 9.63 12.27 14.43 17.18 19.80 50 0.77 1.23 1.55 ® 3.17 3.86 - - - - 4.25 5.15 6.21 7.06 8.10 8.84 9.73 10.65 13.49 15.71 18.53 2123 100 0.81 1.29 1.64 V 5 11[3 74 5] 4.24 4.70 5.73 6.93 7.86 9.00 .81 10.77 11.69 14.71 16.98 19.83 22.60 ®0.85 1.36 1.71 ®.73 4.63 5.18 6.33 7.70 8.68 9.92 10.81 11.83 12.74 15.96 18.24 1.1 I 95 ® 0.90 1.43 1.80 .86 .10 5.13 5.84 7.16 8.75 9.81 11.19 12.17 13.29 14.17 17.65 19.93 22.78 25.68 1000 0.94 1.47 1.85 2.99 .37 5.51 ' 6.37 7.82 .62 10.70 12.18 13.22 14.43 15.27 18.97 1.23 24.05 27.00 The Wiper he nd dfhe twrr6derrce inletvel >r 90%rnrridstrce bvel is the vahte which 5%dthe akreaakd drtanae wives for a d van tmattenw a a ?..dr awn . tame P? eegeerrCY 85011rae5 ore Daeeb 011 a AW i5 the Average Reatar&It8 Inlerwal. Please refer to NOAA Atlas 14 Document for more hAormdon. NOTE Fo wrig prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval Preci itation Fre uenc Estimates inches ARI** 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 (years) min min min min min min hr hr hr hr hr day day da day a day 11 day C1 0.37 0.59 0.74 1.01 1.26 1.45 1.54 1.87 2.22 2.59 3.04 3.42 3.94 4.54 6.11 7.57 ® 11.44 2 0.44 0.70 0.88 1.22 1.52 E71]1.86 2.25 2.68 3.13 3.67 4.10 .71 5.39 7.22 8.90 11.21 13.33 ? 5 0.51 T87171 1.03 1.46 1.87 2.16 2.31 2.81 3.35 3.92 .56 5.04 5.72 6.47 8.51 10.34 12.80 15.05 10 0.56 0.89 1.13 1.64 13 2.47 2.66 3.24 .88 4.54 5.26 5.78 6.52 7.31 .52 11.45 14.02 16.38 25 0.61 0.98 1.24 1.84 2.45 2.88 3.12 3.81 .58 5.38 6.21 6.80 7.61 8.44 10.87 12.90 15.58 18.09 50 0.65 1.04 1.31 1.98 .68 3.17 3.48 4.26 5.14 6.04 6.95 7.59 8.48 9.31 11.93 14.00 16.76 1935 100 0.69 1.09 1.38 .11 2.91 3.47 3.83 4.70 5.69 6.71 7.69 8.41 9.36 10.20 12.98 15.09 17.89 20.56 On 0.71 1.13 1.43 2.22 .11 3.75 4.18 5.13 6.25 7.38 8.46 9.24 10.24 11.09 .16.16 18.99 173 0.74 1.17 1.48 2.35 3.37 .10 .63 5.71 7.01 8.31 9.50 10.36 11.45 12.27 15.45 17.59 20.42 23.2 1000 0.76 1.20 1.50 2.44 3.56 4.36 4.98 6.16 7.60 9.02 10.30 11.22 12.38 13.19 16.54 18.65 21.49 24.36 "1 -1 4 The borer hound of the twrtfidence irr0erval at 90%txnfiderrce level is the value which 5%of the simul?ed tptardNe values fora given hequerrcy are less dwn. Page 1 of 3 eturn to State Map http://`hdsc.nws.noaa.gov/cgi-binlhdsclbuildout.perl?type=pf&units=us&series=pd&statena... 2/10/2009 PRE-DEVELOPMENT HYROLOGIC CALCULATIONS SILVER LANDING PHASE II IBC-08030 ?a X11 ?? I I 1 ._/ '11 II' I Ill ?i ?__--\ - •,,?? ?•"- O O _ ?'i/ii?ir/ 1 \ ?\ ?i/i/ii err ? ?\?? . \`\ ?'%,:-:.,:, ?`: ,.\:?`,`:?•,? ? 1 1: 11 1; -- I I ?4 Lr) (IJ 111 '- :111 ?/ / ?, ,/ ,yeY-h/ "- gg _c== " _ %ti%.,a;%',•%'• - fA _- \ .14101 A,- I "I -_- --_ ?•" ,pry z ??,,{{'}} I \ \ \ 1 bf j - I J \ \ \ \ 1j' J I O `? - - I I I L0 - it 1 N _ _ c9 1 1 \ 1 .\ / / IJ / / -- -- ' 1111 l Iy I ?' 1 A4V ` J1 \ a t ` Y a / r 7 l I / S _ mr%,+ ?C \ I I I_j ?, '111.1'1 I \ / / I \ ?. 11 I \ I \ 1 \ \ /r F 1 r r I \ \ 1 I 'Vli;? ? i' / I I / i 1iRI Y I I / I 1 \ / V 1 `?1 \ r r \ \ \\.I / 1,// / 11 , 1 \ '1 _ I{li It li / ! I I / I 11 / / I 1 1'•I ? ?\1, / 1 111 \ 1 1 I I I I / I -- r \ / \ ? Pas \ I J? I II I - II / 1 / I I \\ \ =- ? _. 1 1 1 1 1 1 10 11" 11 --- 4a , I \ III , ? / 111 a ?• ?' -- ® PROJECT NO. IBC-08030 Ec E FILENAME: I13C08030-PRE SILVER LANDING PHASE II A o ngineering A divisio f Th J h R M d SCALE: 1 ° 25 ' P RE-DEVELOPMENT n o e o n . cAdams Company, Inc. a = 0 ENGINEERS-PLANNERS-SURVEYORS-ENVIRONMENTAL Vl DATE: 7-17-2009 I CHARLOTTE, NORTH ?'.ARDI.nV?I RESEARCH TRIANGLE PARK - CHARLOTTE. NIIJUNGTON 2M Meridian Parirny, Durham NC mu 500-M55dd-www,1ohmm ada mm.Ila No.: C-am 'v% , 7 'I ; I(;'? • I. ,• ? , ,?, 1?1,\s6UIMEJ(1 lU2JJf1')\s6UIMBJ( uoitonJ3SU07\W101R\opnRn-7fllV,)Ri\S308f01r{\:) a p rn C) 00 ?? :f y p o 0 0 rn 0 rn U ? v O O O o ? O O O 3 O O o 0 U b r= b rn O rn , 0 0 0? O C? U ? 0 0 0 , 7 ? '?r 4r p 0 O O O .? G; O O O OINIv'? v ? U ?, 'x ? ° •o c ? 3 O M 0 O O 0 44 o ? d • F r ? N O i ,t w ? O O IpI?IO?C, y 'n C, Cd h ? ? ? 6, p L F INI? IM N ? q Q .. C o C ' II y O C cl y M cad ? ? cn ? CA N a 00 ?o > U a Silver Landing Phase II Pre-Development Hydrolo2ic Calculations J.C. Diaz, PE IBC-08030 Subbasin 1 7/9/2009 Cover Description SCS CN Comments Wooded 55 HSG 'B' Soils (assume good condition) Open 61 HSG 'B' Soils (assume good condition) Impervious 98 HSG'B' Soils Water 100 HSG'B' Soils I. Watershed Composition: Cover Description SCS CN Area [acres] Onsite Impervious 98 0.24 Onsite Open 61 13.70 Onsite Wooded 55 13.71 Offsite Impervious 98 0.00 Offsite Open 61 0.98 Offsite Wooded 55 0.99 Offsite Water 100 0.00 Total = 29.92 Acres Onsite Water 100 0.30 0.0468 Sq Miles Composite SCS CN = 59 11. Time of Concentration Information: *** Tc was calculated using SCS TR-55 Segment 1: Overland Flow Surface Manning n (see below) = 0.24 grass Flow Length, L (<=300') = 50 feet 2-Year, 24 Hour Rainfall Depth = 3.37 inches Begin EL. 730.9 ft Land Slope = 0.0280 ft/ft End EL. 729.5 ft Travel Time = 6.98 min Segment 2: Concentrated Flow Surface Description = unpaved (paved or unpaved) Flow Length, L = 478 ft Begin EL. 729.5 ft Watercourse Slope = 0.076 ft/ft End EL. 693.0 ft Average Velocity = 4.46 ft/s Travel Time = 1.79 min Segment 3: Channel Flow Length = 1299 ft Begin EL. 690.Oft Slope = 0.0306 ft/ft End EL. 650.2ft Manning's n = 0.045 natural channel Flow Area = 9.00 sf (Assume 3'x3' cha nnel) Wetted Perimeter = 9.00 ft (Assume 3'x3' channel) Channel Velocity = 5.80 ft/sec Travel Time = 3.74 min Total Travel Time = 12.50 min SCS LAG TIME = 7.50 min (SCS Lag = 0.6* Tc) Time Increment = 2.18 min (= 0.29*SCS Lag) X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Pre-Development Hydrologic Calculations Page 2 Silver Landing Phase II Pre-Development Hydrologic Calculations IBC-08030 Subbasin 2 J.C. Diaz, PE 7/9/2009 Cover Description SCS CN Comments Wooded 55 HSG 'B' Soils (assume good condition) Open 61 HSG'B' Soils (assume good condition) Impervious 98 HSG'B' Soils Water 100 HSG'B' Soils I. Watershed Composition: Cover Description SCS CN Area [acres] Onsite Impervious 98 0.00 Onsite Open 61 2.02 Onsite Wooded 55 2.02 Offsite Impervious 98 0.00 Offsite Open 61 0.00 Offsite Wooded 55 0.00 Onsite Water 100 0.00 Offsite Water 100 0.00 Total = 4.04 Acres 0.0063 Sq Miles Composite SCS CN = 58 It. Time of Concentration Information: *** Tc was calculated using SCS TR-55 Segment 1: Overland Flow Surface Manning n (see below) = 0.24 grass Flow Length, L (<=300') = 50 feet 2-Year, 24 Hour Rainfall Depth = 3.37 inches Begin EL. 716.5 ft Land Slope = 0.0960 ft/ft End EL. 711.7 ft Travel Time = 4.26 min Segment 2: Concentrated Flow Surface Description = unpaved (paved or unpaved) Flow Length, L = 374.3 ft Begin EL. 711.7 ft Watercourse Slope = 0.042 ft/ft End EL. 696.0 ft Average Velocity = 3.30 ft/s Travel Time = 1.89 min Se.ement 3: Channel Flow Length = 354.85 ft Begin EL. 696.Oft Slope = 0.0172 ft/ft End EL. 689.9ft Manning's n = 0.045 natural channel Flow Area = 9.00 sf (Assume 3'x3' channel) Wetted Perimeter = 9.00 ft (Assume 3'x3' channel) Channel Velocity = 4.34 ft/sec Travel Time = 1.36 min Total Travel Time = 7.51 min SCS LAG TIME = 4.51 min (SCS Lag = 0.6* Tc) Time Increment = 1.31 min (= 0.29*SCS Lag) X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Pre-Development Hydrologic Calculations Page 3 6At HEC-HMS Project : IBC-08030 Basin Model : Pre-Development Jul 09 18:54:16 EDT 2009 I tF1 Subbasin-1 LE54 Subbasin-2 Project: IBC-08030 Simulation Run: Pre 2 Start of Run: 30Jun2009, 00:00 Basin Model: Pre-Development End of Run: 30Jun2009, 06:00 Meteorologic Model: 2yr, 6hr Compute Time: 09Ju12009, 18:54:48 Control Specifications: dt1 min, 6hr Volume Units: AC-FT Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (AC-FT) Subbasin-1 0.0468 3.97 30Jun2009, 03:19 0.34 Subbasin-2 0.0063 0.48 30Jun2009, 03:17 0.04 Project: IBC-08030 Simulation Run: Pre 10 Start of Run: 30Jun2009, 00:00 Basin Model: Pre-Development End of Run: 30Jun2009, 06:00 Meteorologic Model: 10yr, 6hr Compute Time: 09Ju12009, 18:54:40 Control Specifications: dt1 min, 6hr Volume Units: AC-FT Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (AC-FT) Subbasin-1 0.0468 19.60 30Jun2009, 03:13 1.25 Subbasin-2 0.0063 2.73 30Jun2009, 03:09 0.16 Project: IBC-08030 Simulation Run: Pre 25 Start of Run: 30Jun2009, 00:00 End of Run: 30Jun2009, 06:00 Compute Time: 09Ju12009, 09:21:18 Basin Model: Pre-Development Meteorologic Model: 25yr, 6hr Control Specifications: dt1 min, 6hr Volume Units: AC-FT Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (AC-FT) Subbasin-1 0.0468 31.87 30Jun2009, 03:12 1.95 Subbasin-2 0.0063 4.62 30Jun2009, 03:08 0.25 POST-DEVELOPMENT HYDROLOGIC CALCULATIONS SILVER LANDING PHASE II IBC-08030 -7 l ?l ?? II?ffI1? f-`?? 1 (ll X111 Ali N ? _z I Q \ `I N Z a cn in w _ C\l r1l \ I ( ??1 1 1// (( jr///?/f ib )I r a 0 \\\ \ r? U' \ I ?1 ??? _ llll Q Q X\?? ' 11111I?/ll?j? ?? I \ I ` ?j11111111 Illl(? i \111\\\\\? ?? ? J 1111 ?? ` ? \X\\\\? , ( ,/ ? ? x`11\ l? 1 I J I / ?? 1111 ? ,?\ 111 I I l I 11111111 ll l I 1 v I i I 111111)1//// Jll)I(llllllll r? ( l I I II IIIV////'?' M/;l//ll l)lll?) /? ? 111111(/?//ice//////// I ?s II V I I I 1\\\I`1111111f 1/( 1;11111 ?? I IIIIIII?IIIII I\? ? ?? 1111\1\\ 1111 I II 1111 ` ? ? / f ??j ill ? ? II))I///j//1111111?111111IIID 1 111` /l/ Illlll?lllll/ill ? ??I?III ?? 1 ?' 11 / %/ lIl 111 11111ti? I ? i I 111 ?\\ \ ??\\?? 1 ? . 0 N IN PROJECT N0. IBC-08030 ftoEngineering 4: O FILENAME: IBC08030-PO7 SILVER LANDING PHASE II A division of The John R. McAdams Company, Inc. a SCALE: 1"=250' POST-DEVELOPMENT ENGINEERS S • PLANNERS • SURVEYORS • ENVIRONI[ENTA TAL ?T i7 RESEARCH TRIANGLE PARR • CHARLOTTE • WILMINGTON DATE: ?_7-ZOOS tv A T1?T A l ARLOl rE. 1?T 1?O? tw[fA?OU A C 2905 Meridian Partway, Durham NC ma 000-709-5910. W Johmumadwwxem. license Ne.: C-OM L: L 'ZBID 'wd bL:JV L L AnOW ui 'BMD• I cni-ncnRnnans6um-in weJJn7\S6uime1n uolonJisuonkwJoiskngnRn-nannansioefo. r0 W o A-, o Q ? U C O •.r v 0 U A a t4 'd O ? M .7 O ?. O > U un m ? ? M M M a y +-' O O O ?..? H ? O O O z 00 1.0 ?c . g o o ? a 0Ir- 100 "D - w A v, ? N ,G Q C Ul Un FL x Silver Landing Ph. II Post-Development Hydrologic Calculations IBC-08030 Subbasin 1 - To SWMF J.C. Diaz, PE 7/16/2009 Cover Description SCS CN Comments Wooded 55 HSG'B' Soils (assume good condition) Open 61 HSG 'B' Soils (assume good condition) Impervious 98 HSG'B' Soils Water 100 HSG'B' Soils 1. Watershed Composition: Cover Description SCS CN Area [acres] On-site Impervious 98 21.02 On-site Open 61 7.75 On-site Wooded 55 0.00 On-site Water 100 0.00 Off-site Impervious 98 0.43 Off-site Open 61 5.23 Off-site Wooded 55 0.00 Off-site Water 100 0.87 Total = 35.30 Acres 0.0552 Sq Miles Composite SCS CN = 84 If . Time of Concentration Information: *** Tc assumed to be minimum = 5min Total Travel Time = SCS LAG TIME _ Time Increment = 5.00 min 3.00 min (SCS Lag = 0.6* Tc) 0.87 min (= 0.29*SCS Lag) X:\Projects\tBC\IBC-08030\Storm\Construction Drawings\Design Files\Post-Development Hydrologic Calculations Page 2 Silver Landing Ph. II Post-Development Hydrologic Calculations J.C. Diaz, PE IBC-08030 Subbasin 1 - Bypass 7/16/2009 Cover Description SCS CN Comments Wooded 55 HSG'B' Soils (assume good condition) Open 61 HSG 'B' Soils (assume good condition) Impervious 98 HSG'B' Soils Water 100 HSG'B' Soils 1. Watershed Composition: Cover Description SCS CN Area [acres] On-site Impervious 98 0.04 On-site Open 61 2.00 On-site Wooded 55 0.00 On-site Water 100 0.00 Off-site Impervious 98 0.00 Off--site Open 61 1.63 Off-site Wooded 55 0.00 Off-site Water 100 0.00 Total = 3.67 Acres Composite SCS CN = 0.0057 Sq Miles 61 II . Time of Concentration Information: *** Tc assumed to be minimum = 5min Total Travel Time = 5.00 min SCS LAG TIME = 3.00 min (SCS Lag = 0.6* Tc) Time Increment = 0.87 min (= 0.29*SCS Lag) X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Post-Development Hydrologic Calculations Page 3 Silver Landing Ph. II Post-Development Hydrolouic Calculations IBC-08030 Subbasin 2 J.C. Diaz, PE 7/16/2009 Cover Description SCS CN Comments Wooded 55 HSG'B' Soils (assume good condition) Open 61 HSG'B' Soils (assume good condition) Impervious 98 HSG'B' Soils Water 100 HSG 'B' Soils I. Watershed Composition: Cover Description SCS CN Area [acres] On-site Impervious 98 0.02 On-site Open 61 1.16 On-site Wooded 55 0.00 On-site Water 100 0.00 Off-site Impervious 98 0.00 Off-site Open 61 0.00 Off-site Wooded 55 0.00 Off-site Water 100 0.00 Total = 1.18 Acres 0.0018 Sq Miles Composite SCS CN = 62 II . Time of Concentration Information: *** Tc assumed to be minimum = 5min Total Travel Time = 5.00 min SCS LAG TIME = 3.00 min (SCS Lag = 0.6* Tc) Time Increment = 0.87 min (= 0.29*SCS Lag) X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Post-Development Hydrologic Calculations Page 4 C-1-7-7 71 Project : IBC-08030 Basin Model : Post-Development HEC-HMS Jul 09 18:56:54 EDT 2009 To SWMF 1®1 SWMF Subbasin-1 Bypass Subbasin-2 Project: IBC-08030 Simulation Run: Post 2 Start of Run: 30Jun2009, 00:00 Basin Model: Post-Development End of Run: 30Jun2009, 06:00 Meteorologic Model: 2yr, 6hr Compute Time: 14Ju12009, 16:05:28 Control Specifications: dt1 min, 6hr Volume Units: AC-FT Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (AC-FT) Bypass 0.0057 0.86 30Jun2009, 03:10 0.06 Subbasin-1 0.0609 1.14 30Jun2009, 03:10 0.14 Subbasin-2 0.0018 0.33 30Jun2009, 03:09 0.02 SWMF 0.0552 0.39 30Jun2009, 06:00 0.09 To SWIVIF 0.0552 96.65 30Jun2009, 03:05 3.18 Project: IBC-08030 Simulation Run: Post 2 Reservoir: SWMF Start of Run: 30Jun2009, 00:00 Basin Model: End of Run: 30Jun2009, 06:00 Meteorologic Model: Compute Time: 14Jul2009, 16:05:28 Control Specifications: Volume Units: AC-FT Computed Results Post-Development 2yr, 6hr dt1 min, 6hr Peak Inflow : 96.65 (CFS) Date/Time of Peak Inflow : 30Jun2009, 03:05 Peak Outflow : 0.39 (CFS) Date/Time of Peak Outflow : 30Jun2009, 06:00 Total Inflow : 3.18 (AC-FT) Peak Storage : 3.09 (AC-FT) Total Outflow : 0.09 (AC-FT) Peak Elevation : 676.43 (FT) Project: IBC-08030 Simulation Run: Post 10 Start of Run: 30Jun2009, 00:00 Basin Model: Post-Development End of Run: 30Jun2009, 06:00 Meteorologic Model: 10yr, 6hr Compute Time: Wu12009, 16:05:45 Control Specifications: dt1 min, 6hr Volume Units: AC-FT Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (AC-FT) Bypass 0.0057 3.93 30Jun2009, 03:06 0.18 Subbasin-1 0.0609 8.36 30Jun2009, 04:03 1.46 Subbasin-2 0.0018 1.37 30Jun2009, 03:06 0.06 SWMF 0.0552 7.96 30Jun2009, 04:04 1.28 To SWMF 0.0552 158.20 30Jun2009, 03:04 5.80 R Project: IBC-08030 Simulation Run: Post 10 Reservoir: SWMF Start of Run: 30Jun2009, 00:00 Basin Model: Post-Development End of Run: 30Jun2009, 06:00 Meteorologic Model: 10yr, 6hr Compute Time: 14Jul2009, 16:05:45 Control Specifications: dt1 min, 6hr Volume Units: AC-FT Computed Results _ Peak Inflow : 158.20 (CFS) DateMme of Peak Inflow : 30Jun2009, 03:04 Peak Outf ow : 7.96 (CFS) DateRme of Peak Outflow : 30Jun2009, 04:04 Total Inflow : 5.80 (AC-FT) Peak Storage : 4.58 (AC-FT) Total Outflow : 1.28 (AC-FT) Peak Elevation : 677.71 (FT) Project: IBC-08030 Simulation Run: Post 25 Start of Run: 30Jun2009, 00:00 Basin Model: Post-Development End of Run: 30Jun2009, 06:00 Meteorologic Model: 25yr, 6hr Compute Time: 14Ju12009, 16:05:48 Control Specifications: dt1 min, 6hr Volume Units: AC-FT Hydrologic Element Drainage Area (M12) Peak Discharge (CFS) Time of Peak Volume (AC-FT) Bypass 0.0057 6.12 30Jun2009, 03:05 0.27 Subbasin-1 0.0609 30.98 30Jun2009, 03:33 3.14 Subbasin-2 0.0018 2.09 30Jun2009, 03:05 0.09 SWMF 0.0552 29.41 30Jun2009, 03:33 2.86 To SWMF 0.0552 188.54 30Jun2009, 03:04 7.41 Project: IBC-08030 Simulation Run: Post 25 Reservoir: SWMF Start of Run: 30Jun2009, 00:00 Basin Model: Post-Development End of Run: 30Jun2009, 06:00 Meteorologic Model: 25yr, 6hr Compute Time: 14Jul2009, 16:05:48 Control Specifications: dt1 min, 6hr Volume Units: AC-FT Computed Results Peak Inflow : 188.54 (CFS) Date/Time of Peak Inflow : 30Jun2009, 03:04 Peak Outflow : 29.41 (CFS) Date/Time of Peak Outflow : 30Jun2009, 03:33 Total Inflow : 7.41 (AC-FT) Peak Storage : 4.97 (AC-FT) Total Outflow : 2.86 (AC-FT) Peak Elevation : 678.04 (FT) STORMWA TER WET POND DESIGN SILVER LANDING PHASE II IBC-08030 Silver Landing Ph. 2 Stormwater Management Facility Design J.C. Diaz, PE IBC-08030 Stage-Storage 7/14/2009 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 673.50 0.0 37880 674.00 0.5 42256 40068 20034 20034 0.51 674.50 1.0 43788 43022 21511 41545 1.00 675.00 1.5 45688 44738 22369 63914 1.48 676.00 2.5 48477 47083 47083 110997 2.46 677.00 3.5 51312 49895 49895 160891 3.46 678.00 4.5 54193 52753 52753 213644 4.48 679.00 5.5 57128 55661 55661 269304 5.55 680.00 6.5 60114 58621 58621 327925 6.65 350000 300000 250000 LL v 200000 m m 150000 0 100000 50000 0 Storage vs. Stage y = 41, 706.2961 x1.0887 R2 = 0.9997 0.0 2.0 4.0 6.0 8.0 Stage (feet) Ks = 41,706.3 b = 1.0887 X:\Projects\I3C\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 1 Silver Landing Ph. 2 Stormwater Management Facility Design IBC-08030 Stage-Storage Function Ks = 41706.3 b = 1.0887 Zo = 673.50 Elevation Stora a Worst Case Scenario Storage feet [cfl [acre-feet] [acre-feet] 673.50 0 0.000 - 673.60 3400 0.078 - 673.80 11245 0.258 - 674.00 19610 0.450 - 674.20 28285 0.649 - 674.40 37187 0.854 - 674.60 46266 1.062 - 674.80 55495 1.274 - 675.00 64850 1.489 - 675.20 74318 1.706 - 675.40 83884 1.926 - 675.60 93541 2.147 - 675.80 103280 2.371 - 676.00 113094 2.596 - 676.20 122978 2.823 - 676.40 132927 3.052 - 676.60 142938 3.281 - 676.80 153006 3.513 - 677.00 163128 3.745 - 677.20 173302 3.978 - 677.40 183524 4.213 - 677.50 188653 4.331 0.000 677.60 193794 4.449 0.118 677.80 204107 4.686 0.355 678.00 214464 4.923 0.593 678.10 219658 5.043 0.712 678.20 224861 5.162 0.831 678.40 235298 5.402 1.071 678.60 245773 5.642 1.311 678.80 256284 5.883 1.553 679.00 266830 6.126 1.795 679.20 277410 6.368 2.038 679.40 288024 6.612 2.281 679.60 298669 6.856 2.526 679.80 309345 7.102 2.771 680.00 320052 7.347 3.016 J.C. Diaz, PE 7/14/2009 X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 2 Silver Landing Ph. 2 Stormwater Mana gement Facility Desig n J.C. Diaz, PE IBC-08030 Below NWSE 7/14/2009 Average Incremental Accumulated Contour Contour Contour Contour Contour Stage Area Area Volume Volume (feet) (feet) (SF) (SF) (CF) (CF) 667.00 0.0 21227 668.00 1.0 22932 22080 22080 22080 669.00 2.0 24688 23810 23810 45890 670.00 3.0 26498 25593 25593 71483 671.00 4.0 28363 27431 27431 98913 672.00 5.0 30354 29359 29359 128272 673.00 6.0 33385 31870 31870 160141 673.50 6.5 37880 35633 17816 177957 Storage vs. Stage 200000 180000 160000 Y = 21, 542.349x1.11 s 140000 R2 = 0.999 v 120000 d 100000 80000 CO 60000 40000 20000 0 0.0 2.0 4.0 6.0 8.0 Stage (feet) X:\Projects\IBC\H3C-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 3 Silver Landing Ph. 2 Stormwater Management Facility Desig n IBC-08030 Forebay 1 Average Incremental Accumulated Contour Contour Contour Contour Contour Stage Area Area Volume Volume (feet) (feet) (SF) (SF) (CF) (CF) 667.00 0.0 3564 668.00 1.0 4056 3810 3810 3810 669.00 2.0 4573 4315 4315 8125 670.00 3.0 5116 4845 4845 12969 671.00 4.0 5683 5400 5400 18369 672.00 5.0 6276 5980 5980 24348 673.00 6.0 7890 7083 7083 31431 673.50 6.5 9018 8454 4227 35658 Storage vs. Stage 40000 35000 30000 v 25000 20000 M 15000 10000 5000 0 0.0 2.0 4.0 6.0 8.0 Stage (feet) X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design J.C. Diaz, PE 7/14/2009 Page 4 Silver Landing Ph. 2 Stormwater Management Facility Design J.C. Diaz, PE IBC-08030 Water Quality Volume 7/14/2009 [L, CALCULATION OF I" VOLUM19 FOR WAT_J?R QUALITY The runoff to the pond for the 1" storm detention requirement is calculated using the Schueler Method in accordance with the Charlotte-Mecklenburg BMP Design Manual, (April 2008). WQ v = (P)(R v)(A)112 WQv= water quality volume (in acre-ft) Rv = 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Impervious area = 21.45 acres Total area, A = 35.30 acres Percent impervious cover, I = 60.8 % Rainfall, P = 1 inches Calculated values: Rv = 0.60 WQv= 1.76 acre-ft Therefore, total runoff from precipitation in question = 76,484 CF This amount of runoff must be stored in the pond above and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. ?It D U I II l? ?! .. ? P( RUHOI F , 0$ 1 $ Nol€21YtAL POOL) Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 76484 CF Ks = 41706.3 b = 1.0887 Invert Elevation= 673.50 Stage (above invert) associated with this storage = 1.75 feet Therefore, depth required above normal pool for storm storage = 1.75 feet 20.95 inches Therefore set crest of principal spillway at stage = 4.00 feet and EL = 677.50 feet At principal spillway crest, storm pool storage provided = 188,653 CF X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 5 Silver Landing Ph. 2 Stormwater Management Facility Design J.C. Diaz, PE IBC-08030 Basin Sizing 7/14/2009 .M a _.. Per NCDENR "Stormwater Best Management Practices the forebay volume should equal about 20% of the total basin volume. A. Water Quality Pond - Below Normal Pool Accumulated Contour Volume = 177957 ft3 B. Forebay Volume Accumulated Contour Volume = 35658 ft3 Foreba = 20.0% C. Forebay Weir Per Charlotte-Mecklenburg design standards, the forebay shall be designed to be stable in the 1-year event. For a conservative design, the forebay berm is designed to pass the 2-year event with a maximum depth of 1'. Q2-year event = 96.65 cfs Cweir = 3 Hdesign I ft L = Q = 96.65 = 32.22 ft of wier length required CH 3/2 3 Wier Length Provided = 35 ft L k '',. i Cr tK,? Mq R Per Charlotte-Mecklenburg design standards, a wet pond shall have a minimum average depth of 3 feet. Average Depth = Permanent Pool Volume / Surface Area PPS, = 177,957 cf SA = 37,880 sf Average Depth = 4.7 ft. - C.,. f., t? ...t.i??7?d?.`SF ?{?<._i??''.a._•*___d?: l? : s?f i.s?. :., a.-. Design Values and Pollution Removal Rates from the Charlote-Mecklenburg BMP Design Manual, (April 2008) Threshold Min. WQv Minimum WQv/PP„ Pollution Removal Rate Detention Time Ratio Optimal Efficiency 4 days 0.3 85% TSS 70% TP Standard Efficiency 2 days 0.6 60% TSS 40% TP TSS-Only Efficiency 4 days 0.4 85% TSS 0% TP WQv = 76,484 ft3 PPv = 177,957 ft3 WQ'/PP' = 0.4 Therefore, the SWMF will achieve TSS-Only Efficiency with a WQv detention time of4 days, X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 6 r Silver Landing Ph. 2 Stormwater Management Facility Design IBC-08030 Siphon Sizing Calculation J.C. Diaz, PE 7/14/2009 Siphon D No. siphons Ks b Cd siphon Normal Pool Elevation WSEL @ 1" Runoff Volume Calculated WSEL increment 3 inches 1 41706.3 1.0887 0.60 673.50 feet 675.25 feet 0.153 feet WSEL (feet) Vol. Stored c Siphon Flow cfs) Avg. Flow cfs) Incr. Vol. c Incr. Time sec 675.245 76484 0.300 675.092 69191 0.286 0.293 7293 24882 674.938 61960 0.270 0.278 7231 25997 674.785 54798 0.254 0.262 7163 27306 674.632 47711 0.237 0.245 7087 28873 674.478 40709 0.218 0.227 7002 30798 674.325 33804 0.197 0.208 6905 33250 674.171 27013 0.174 0.186 6791 36536 674.018 20360 0.148 0.161 6653 41297 673.864 13882 0.115 0.132 6478 49221 673.711 7648 0.065 0.090 6233 69230 Drawdown Time = 4.25 days Conclusion : Use 1 - 3" Diameter Water Quality Orifice to drawdown the accumulated volume from the 1.0 " storm runoff, with a required time of about 4 days. X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 7 Silver Landing Ph. 2 Stormwater Management Facility Design IBC-08030 Anti-Flotation Block Sizing W. ? CULA,TJM ro " Amt-.1Fi flTA?1V Input Data -> Inside wall dimension of riser (1) = Inside wall dimension of riser (2) = Min. wall thickness of riser = Inside height of Riser* = Orifice area = Concrete unit weight = OD of barrel exiting riser = Size of drain pipe (if present) = Volume of Trashrack = *Note- from riser floor to inside of top Concrete Present -> Total amount of concrete: J.C. Diaz, PE 7/14/2009 6.0 feet 6.0 feet 6.0 inches 10.50 feet 0.05 square feet 142.0 PCF Note: NC Products lists unit 59.5 inches wt. of riser concrete at 142 PCF. 8.0 inches 78.4 CF Riser Walls = 136.50 CF Adjust for openings: Opening for barrel = 9.65 CF Opening for drain pipe = 0.17 CF Opening for weirs = 0.02 CF Total Concrete present, adjusted for openings = 126.646 CF Weight of concrete present = 17984 lbs Amount of water displaced -> Total water displaced by riser/barrel structure = 592.900 CF Weight of water displaced = 36997 lbs Calculate amount of concrete to be added to riser -+ Safety factor to use = 1.15 (recommend 1.15 or higher) Calculate size of base for riser assembly -+ Outside Dimension (1) = 10.000 feet Outside Dimension (2) = 10.000 feet Thickness = 42.0 inches Concrete Present = 350.000 CF Check validity of base as designed --+ Total Water Displaced = 942.900 CF Total Concrete Present = 476.646 CF Total Water Displaced = 58837 Ibs Total Concrete Present = 67684 lbs Actual safety factor = 1.15 Results of design --* Outside Base Dimensions (rectangular) = 10.00 feet x 10.00 feet Base Thickness = 42.00 inches CY of concrete total in base = 12.96 CY E:? Concrete unit weight in added base >= 142 PCF X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 8 Silver Landing Ph. 2 Stormwater Management Facility Design IBC-08030 Outfall J.C. Diaz, PE 7/14/2009 .,,Y ,..,... .Y. #.r?i .dam v'4. Z. Based on Army Corps of Engineers Reports H-70-2 H-72-5, and N.J. Standards for Soil Erosion and Sediment Control (1999) In ut: Pipe Diameter, Do 48 Inches or 4 Feet Peak Flow, Q10 9 ] CFS (Used design storm flow. See pond routing results.) Tailwater depth, Tw 0.8 Feet ( If Unknown, use 0.2 x Diameter in Feet) Design: La= (1.8 x Do/Q) +7Do, If TW <Do/2, Wa = 3Do + La Do^0.5 If TW > Do/2,Wa = 3Do+ 0.4La Apron Length, La = 30.0 Feet Long Apron Width, Wa = 42.0 Feet Wide (Only if no well-defined channel downstream) d50 Stone Size = 0.06 d50 in Feet 0.7 d50 in Inches d50 = 0.016/TW x (q) 1.33 RIP RAP G RADATION PER NCDOT SPECIFICATIONS RIP RAP MINIMUM MIDRANGE MAXIMUM CLASS (IN.) (IN.) (IN.) A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 SOIL TEXTURE ALLOWABLE VELOCITY Sand Loam 2.5 fps Silt Loam, Loam 3.0 fps Sand Clay Loam 3.5 s Clay Loam 4.0 s Clay, fine Gravel 5.0 s Cobbles 5.5 fps X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\Design Files\Stormwater Management Facility Design Page 9 CA O d ? H rn x r z ?y x r d N H o x r rn z N y o x N r N x N C, ? o x H C 00 00 d H z d r z y x cn y o ? 0 C b7 ?'• n< oCD 00 t- o? N o a ?s aro b ?e N O ? Type.... Outlet Input Data Page 1.01 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 673.60 ft Increment = .20 ft Max. Elev.= 680.00 ft Spot Elevations, ft 678.10 OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Inlet Box RI ---> BA 677.500 680.000 Orifice-Circular OR ---> BA 673.500 680.000 Culvert-Circular BA ---> TW 667.000 680.000 TW SETUP, DS Channel SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Outlet Input Data Page 1.02 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type ---- = Inlet Box ------------- # of Openings ------------- = 1 ------ Invert Elev. = 677.50 ft Orifice Area = 36.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 29.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 673.50 ft Diameter = .2500 ft Orifice Coeff. _ .600 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Outlet Input Data Page 1.03 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 4.0000 ft Upstream Invert = 667.00 ft Dnstream Invert = 666.00 ft Horiz. Length = 96.00 ft Barrel Length = 96.01 ft Barrel Slope = .01042 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .004925 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.155 T2 ratio (HW/D) = 1.302 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below Tl elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 671.62 ft ---> Flow = 87.96 cfs At T2 Elev = 672.21 ft ---> Flow = 100.53 cfs SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Outlet Input Data Page 1.04 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maxi mum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.05 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (Inlet Box) -- -------------- ---------- Upstream --- ID ------- = ( - - Pond Water Surface) DNstream ID = BA (Cu lvert-C ircular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Ch an. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- 673.50 ------- .00 - ------- ... -- ------ ... -- ----- ... ------ ------ ... ... ----- Free -- ------- Outfall WS below an invert; no flow. 673.60 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 673.80 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 674.00 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 674.20 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 674.40 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 674.60 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 674.80 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 675.00 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 675.20 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 675.40 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 675.60 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 675.80 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 676.00 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 676.20 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 676.40 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.06 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (Inlet Box) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 676.60 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 676.80 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 677.00 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 677.20 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 677.40 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 677.50 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 677.60 2.28 677.60 Free 667.72 .000 .000 Free Outfall Weir: H =.10 677.80 11.83 677.80 Free 668.57 .000 .000 Free Outfall Weir: H =.30 678.00 25.46 678.00 Free 669.34 .000 .000 Free Outfall Weir: H =.50 678.10 33.46 678.10 Free 669.72 .000 .000 Free Outfall Weir: H =.60 678.20 42.16 678.20 Free 670.10 .000 .000 Free Outfall Weir: H =.70 678.40 61.47 678.40 Free 670.86 .000 .000 Free Outfall Weir: H =.90 678.60 83.06 678.60 Free 671.66 .000 .000 Free Outfall Weir: H =1.10 678.80 106.72 678.80 Free 672.56 .000 .000 Free Outfall Weir: H =1.30 679.00 132.27 679.00 Free 674.10 .000 .000 Free Outfall Weir: H =1.50 679.20 159.58 679.20 Free 676.11 .000 .000 Free Outfall Weir: H =1.70 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.07 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (Inlet Box) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 679.40 188.77 679.40 679.40 679.40 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 679.60 198.60 679.60 679.60 679.60 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 679.80 200.58 679.80 679.80 679.80 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 680.00 202.56 680.00 680.00 680.00 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.08 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID -------- = OR (Orifice-Circular) Ups ---- tream ID -------- = ( ---------- Pond Water -------- Surface) DNs tream ID = BA (Culvert-C ircular) Pond WS. Device (into) C onverge Next DS HGL Q SUM DS Ch an. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft -------- cfs ---- ft ft ft +/-ft + /-cfs ft +/-ft 673.50 --- .00 - ------- - ... ------- ... ------- ------ - ... ----- ... ----- Free -- ------- Outfall WS below an invert; no flow. 673.60 .02 673.60 Free 667.05 .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .022f t Dcr= .078ft CRIT.DEPTH 673.80 .10 673.80 Free 667.13 .000 .000 Free Outfall H =.17 674.00 .14 674.00 Free 667.16 .000 .000 Free Outfall H =.38 674.20 .18 674.20 Free 667.18 .000 .000 Free Outfall H =.57 674.40 .21 674.40 Free 667.20 .000 .000 Free Outfall H =.77 674.60 .23 674.60 Free 667.21 .000 .000 Free Outfall H =.97 674.80 .26 674.80 Free 667.22 .000 .000 Free Outfall H =1.17 675.00 .28 675.00 Free 667.23 .000 .000 Free Outfall H =1.38 675.20 .30 675.20 Free 667.23 .000 .000 Free Outfall H =1.57 675.40 .31 675.40 Free 667.24 .000 .000 Free Outfall H =1.77 675.60 .33 675.60 Free 667.25 .000 .000 Free Outfall H =1.97 675.80 .35 675.80 Free 667.25 .000 .000 Free Outfall H =2.17 676.00 .36 676.00 Free 667.26 .000 .000 Free Outfall H =2.38 676.20 .38 676.20 Free 667.26 .000 .000 Free Outfall H =2.57 676.40 .39 676.40 Free 667.27 .000 .000 Free Outfall H =2.77 SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.09 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = OR (Orifice-Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 676.60 .41 676.60 Free 667.27 .000 .000 Free Outfall H =2.97 676.80 .42 676.80 Free 667.28 .000 .000 Free Outfall H =3.17 677.00 .43 677.00 Free 667.28 .000 .000 Free Outfall H =3.38 677.20 .45 677.20 Free 667.29 .000 .000 Free Outfall H =3.57 677.40 .46 677.40 Free 667.29 .000 .000 Free Outfall H =3.77 677.50 .47 677.50 Free 667.29 .000 .000 Free Outfall H =3.88 677.60 .47 677.60 Free 667.72 .000 .000 Free Outfall H =3.97 677.80 .48 677.80 Free 668.57 .000 .000 Free Outfall H =4.17 678.00 .49 678.00 Free 669.34 .000 .000 Free Outfall H =4.38 678.10 .50 678.10 Free 669.72 .000 .000 Free Outfall H =4.47 678.20 .51 678.20 Free 670.10 .000 .000 Free Outfall H =4.57 678.40 .52 678.40 Free 670.86 .000 .000 Free Outfall H =4.77 678.60 .53 678.60 Free 671.66 .000 .000 Free Outfall H =4.97 678.80 .54 678.80 Free 672.56 .000 .000 Free Outfall H =5.17 679.00 .52 679.00 674.11 674.10 .002 .000 Free Outfall H =4.89 679.20 .42 679.20 676.11 676.11 .000 .000 Free Outfall H =3.09 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.10 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ---------- ID = OR -- (Orifice-Circular) Upstream ------- ID = ------------------- (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft -------- cfs - ft ft ft +/-ft +/-cfs ft +/-ft 679.40 ------ .00 - ------- 679.40 -------- 679.40 ------- ------ 679.40 .000 ------ .000 ------- ------- Free Outfall Full riser flow. Q=0 this opening. 679.60 .00 679.60 679.60 679.60 .000 .000 Free Outfall Full riser flow. Q=0 this opening. 679.80 .00 679.80 679.80 679.80 .000 .000 Free Outfall Full riser flow. Q=0 this opening. 680.00 .00 680.00 680.00 680.00 .000 .000 Free Outfall Full riser flow. Q=0 this opening. SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.11 Name.... SWMF File.... X:\Projects\IBC\I BC-08030 \Storm\Constru ction Drawin gs\PondPack\IBC-08030.PPW • Title... Project Date: 7/7 /2009 Project Engineer: J.C. Di az, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABL E FOR ON E OUTLET TYPE Structure I D = BA (Culvert-Circ ular) ----------- Mannings op -------- en chann -------------- el maximum cap ----- acity : 157.70 cfs UPstream I D's= RI, OR DNstream I D = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Err or Error TW Error ft -------- cfs ft -------- ------- ft - ft +/- ft + /-cfs ft +/-ft 673.50 .00 667.00 ------- Free ------- --- Free --- - .000 ----- .000 ------- ------- Free Outfall 673.60 .02 667.05 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .012ft Dcr= .035ft CRIT.DEPTH 673.80 .10 667.13 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .030ft Dcr= .090ft CRIT.DEPTH 674.00 .14 667.16 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .037ft Dcr= .109ft CRIT.DEPTH 674.20 .18 667.18 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .041ft Dcr= .121ft CRIT.DEPTH 674.40 .21 667.20 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .044ft Dcr= .131ft CRIT.DEPTH 674.60 .23 667.21 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .047ft Dcr= .139ft CRIT.DEPTH 674.80 .26 667.22 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .049ft Dcr= .144ft CRIT.DEPTH 675.00 .28 667.23 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .050ft Dcr= .150ft CRIT.DEPTH 675.20 .30 667.23 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .052ft Dcr= .156ft CRIT.DEPTH 675.40 .31 667.24 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .054ft Dcr= .160ft CRIT.DEPTH 675.60 .33 667.25 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .055ft Dcr= .164ft CRIT.DEPTH 675.80 .35 667.25 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .057ft Dcr= .169ft CRIT.DEPTH 676.00 .36 667.26 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .058ft Dcr= .172ft CRIT.DEPTH 676.20 .38 667.26 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .059ft Dcr= .176ft CRIT.DEPTH 676.40 .39 667.27 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .060ft Dcr= .180ft CRIT.DEPTH S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.12 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 157.70 cfs UPstream ID's= RI, OR DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Elev. Q HW HGL DS HGL ft -------- cfs ft ft 676.60 -------- .41 ------- 667.27 -------- Free CRIT.DEPTH CONTROL 676.80 .42 667.28 Free CRIT.DEPTH CONTROL 677.00 .43 667.28 Free CRIT.DEPTH CONTROL 677.20 .45 667.29 Free CRIT.DEPTH CONTROL 677.40 .46 667.29 Free CRIT.DEPTH CONTROL 677.50 .47 667.29 Free CRIT.DEPTH CONTROL 677.60 2.75 667.72 Free CRIT.DEPTH CONTROL 677.80 12.31 668.57 Free CRIT.DEPTH CONTROL 678.00 25.95 669.34 Free CRIT.DEPTH CONTROL 678.10 33.96 669.72 Free CRIT.DEPTH CONTROL 678.20 42.67 670.10 Free CRIT.DEPTH CONTROL 678.40 61.99 670.86 Free CRIT.DEPTH CONTROL 678.60 83.59 671.66 Free CRIT.DEPTH CONTROL 678.80 107.26 672.56 Free INLET CONTROL... 679.00 132.80 674.10 Free INLET CONTROL... 679.20 160.00 676.11 Free INLET CONTROL... Next DS HGL Q SUM DS Chan. TW DS HGL Error Error TW Error ft +/-ft +/-cfs ft +/-ft ------- ------ ------ ------- ------- Free .000 .000 Free Outfall Vh= .061ft Dcr= .183ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .062ft Dcr= .185ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .063ft Dcr= .188ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .064ft Dcr= .191ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .065ft Dcr= .193ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .066ft Dcr= .195ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .163ft Dcr= .477ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .364ft Dcr= 1.025ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .558ft Dcr= 1.506ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .658ft Dcr= 1.733ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .762ft Dcr= 1.953ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= .989ft Dcr= 2.374ft CRIT.DEPTH Free .000 .000 Free Outfall Vh= 1.258ft Dcr= 2.771ft CRIT.DEPTH Free .000 .000 Free Outfall Submerged: HW =5.56 Free .000 .000 Free Outfall Submerged: HW =7.10 Free .000 .000 Free Outfall Submerged: HW =9.11 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.13 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 157.70 cfs UPstream ID's= RI, OR DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next Elev. Q HW HGL DS HGL DS HGL ft cfs ft ft ft ------- -------- ------- -------- ------- 679.40 188.77 679.40 Free Free INLET CONTROL... Submerged: 679.60 198.60 679.60 Free Free INLET CONTROL... Submerged: 679.80 200.58 679.80 Free Free INLET CONTROL... Submerged: 680.00 202.56 680.00 Free Free INLET CONTROL... Submerged: DS HGL Q SUM DS Chan. TW Error Error TW Error +/-ft +/-cfs ft +/-ft ------ ------ ------- ------ .000 .000 Free Outfall HW =12.40 .000 .000 Free Outfall HW =12.60 .000 .000 Free Outfall HW =12.80 .000 .000 Free Outfall HW =13.00 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Composite Rating Curve Page 1.14 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: WS Elev, Total Q Elev. Q ft ------ cfs -- 673.50 ------- .00 673.60 .02 673.80 .10 674.00 .14 674.20 .18 674.40 .21 674.60 .23 674.80 .26 675.00 .28 675.20 .30 675.40 .31 675.60 .33 675.80 .35 676.00 .36 676.20 .38 676.40 .39 676.60 .41 676.80 .42 677.00 .43 677.20 .45 677.40 .46 677.50 .47 677.60 2.75 677.80 12.31 678.00 25.95 678.10 33.96 678.20 42.67 678.40 61.99 678.60 83.59 678.80 107.26 679.00 132.80 679.20 160.00 679.40 188.77 679.60 198.60 ***** COMPOSITE OUTFLOW SUMMARY **** -------- Converge TW Elev Error ft +/-ft -------- ----- Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes ------------------------- Contributing Structures (no Q: RI,OR,BA) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) OR,BA (no Q: RI) RI,OR,BA RI,OR,BA RI, OR, BA RI,OR,BA RI,OR,BA RI,OR,BA RI,OR,BA RI,OR,BA RI,OR,BA RI,OR,BA RI,BA (no Q: OR) RI,BA (no Q: OR) SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Type.... Composite Rating Curve Page 1.15 Name.... SWMF File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- -------- Converge ------------------------- Elev. Q TW Elev Error ft cfs ft +/-ft -------- ----- Contributing Structures -------------------------- -------- 679.80 ------- 200.58 Free Outfall RI,BA (no Q: OR) 680.00 202.56 Free Outfall RI,BA (no Q: OR) SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:03 PM Date: 7/17/2009 Worst Case Scenario Routing SILVER LANDING PHASE II IBC-08030 N HEC-HMS Project : IBC-08030 Basin Model: Worst Case Jul 09 18:53:16 EDT 2009 To SWMF Lmi SWMF Project: IBC-08030 Simulation Run: Worst Case Reservoir: SWMF Start of Run: 30Jun2009, 00:00 Basin Model: Worst Case End of Run: 01Ju12009, 00:00 Meteorologic Model: 100yr, 24hr Compute Time: 14Ju12009, 16:06:11 Control Specifications: dt1 min, 24hr Volume Units: AC-FT Computed Results Peak Inflow : 253.11 (CFS) Date/Time of Peak Inflow : 30Jun2009, 12:04 Peak Outflow : 187.64 (CFS) Date/Time of Peak Outflow : 30Jun2009, 12:08 Total Inflow : 15.85 (AC-FT) Peak Storage : 2.22 (AC-FT) Total Outflow : 15.74 (AC-FT) Peak Elevation : 679.35 (FT) Type.... Outlet Input Data Page 1.01 Name.... SWMF-100 File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW " Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 677.60 ft Increment = .20 ft Max. Elev.= 680.00 ft Spot Elevations, ft 678.10 OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box RI ---> BA 677.500 680.000 Culvert-Circular BA ---> TW 667.000 680.000 TW SETUP, DS Channel SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:07 PM Date: 7/17/2009 Type.... Outlet Input Data Name.... SWMF-100 .5 Page 1.02 File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Inlet Box ----------------- # of Openings ------------ = 1 ------- Invert Elev. = 677.50 ft Orifice Area = 36.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 24.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 S/N: 6217012070C3 PondPack Ver. 8.0058 The John R. McAdams Company Time: 2:07 PM Date: 7/17/2009 Type.... Outlet Input Data Name.... SWMF-100 rt Page 1.03 File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type - -- = Culvert-Circular ------------------ --------- ------ No. Barrels = 1 Barrel Diameter = 4.0000 ft Upstream Invert = 667.00 ft Dnstream Invert = 666.00 ft Horiz. Length = 96.00 ft Barrel Length = 96.01 ft Barrel Slope = .01042 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .004925 Kr = 5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.155 T2 ratio (HW/D) = 1.302 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 671.62 ft ---> Flow = 87.96 cfs At T2 Elev = 672.21 ft ---> Flow = 100.53 cfs SIN: 6217012070C3 PondPack Ver. 8.0058 The John R. McAdams Company Time: 2:07 PM Date: 7/17/2009 Type.... Outlet Input Data Name.... SWMF-100 • Page 1.09 File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs SIN: 6217012070C3 PondPack Ver. 8.0058 The John R. McAdams Company Time: 2:07 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.05 Name.... SWMF-100 File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (Inlet Box) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 677.50 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 677.60 2.28 677.60 Free 667.66 .000 .000 Free Outfall Weir: H =.10 677.80 11.83 677.80 Free 668.54 .000 .000 Free Outfall Weir: H =.30 678.00 25.46 678.00 Free 669.32 .000 .000 Free Outfall Weir: H =.50 678.10 33.46 678.10 Free 669.70 .000 .000 Free Outfall Weir: H =.60 678.20 42.16 678.20 Free 670.07 .000 .000 Free Outfall Weir: H =.70 678.40 61.47 678.40 Free 670.84 .000 .000 Free Outfall Weir: H =.90 678.60 83.06 678.60 Free 671.64 .000 .000 Free Outfall Weir: H =1.10 678.80 106.72 678.80 Free 672.53 .000 .000 Free Outfall Weir: H =1.30 679.00 132.27 679.00 Free 674.07 .000 .000 Free Outfall Weir: H =1.50 679.20 159.58 679.20 Free 676.08 .000 .000 Free Outfall Weir: H =1.70 679.40 196.60 679.40 679.40 679.40 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 679.60 198.60 679.60 679.60 679.60 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 679.80 200.58 679.80 679.80 679.80 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 680.00 202.56 680.00 680.00 680.00 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:07 PM Date: 7/17/2009 Type.... Individual Outlet Curves Page 1.06 Name.... SWMF-100 File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW ' Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 157.70 cfs UPstream ID = RI (Inlet Box) DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 677.50 .00 667.00 Free Free .000 .000 Free Outfall 677.60 2.28 667.66 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .148ft Dcr= .434ft CRIT.DEPTH 677.80 11.83 668.54 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .356ft Dcr= 1.004ft CRIT.DEPTH 678.00 25.46 669.32 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .552ft Dcr= 1.491ft CRIT.DEPTH 678.10 33.46 669.70 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .652ft Dcr= 1.720ft CRIT.DEPTH 678.20 42.16 670.07 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .756ft Dcr= 1.940ft CRIT.DEPTH 678.40 61.47 670.84 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .983ft Dcr= 2.364ft CRIT.DEPTH 678.60 83.06 671.64 Free Free 000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= 1.251ft Dcr= 2.762ft CRIT.DEPTH 678.80 106.72 672.53 Free Free 000 .000 Free Outfall INLET CONTROL... Submerged: HW =5.53 679.00 132.27 674.07 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =7.07 679.20 159.58 676.08 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =9.08 679.40 196.60 679.40 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =12.40 679.60 198.60 679.60 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =12.60 679.80 200.58 679.80 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =12.80 680.00 202.56 680.00 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =13.00 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:07 PM Date: 7/17/2009 1 Type.... Composite Rating Curve Name.... SWMF-100 Page 1.07 File.... X:\Projects\IBC\IBC-08030\Storm\Construction Drawings\PondPack\IBC-08030.PPW Title... Project Date: 7/7/2009 Project Engineer: J.C. Diaz, PE Project Title: Silver Landing Ph. II Project Comments: WS Elev, Total Q ---------------- Elev. Q ft cfs 677.50 .00 677.60 2.28 677.80 11.83 678.00 25.46 678.10 33.46 678.20 42.16 678.40 61.47 678.60 83.06 678.80 106.72 679.00 132.27 679.20 159.58 679.40 196.60 679.60 198.60 679.80 200.58 680.00 202.56 S/N: 6217012070C3 PondPack Ver. 8.0058 ***** COMPOSITE OUTFLOW SUMMARY **** Notes -------- Converge ------------------------- TW Elev Error ft +/-ft Contributing Structures -------- ----- -------------------------- Free Outfall (no Q: RIBA) Free Outfall RIBA Free Outfall RI,BA Free Outfall RI,BA Free Outfall RIBA Free Outfall RIBA Free Outfall RIBA Free Outfall RIBA Free Outfall RIBA Free Outfall RI,BA Free Outfall RIBA Free Outfall RI,BA Free Outfall RIBA Free Outfall RI,BA Free Outfall RIBA The John R. McAdams Company Time: 2:07 PM Date: 7/17/2009