Loading...
HomeMy WebLinkAbout20081754 Ver 1_Information Letter_20100831 North Carolina Eeverly Eaves Perdue Governor Q#0 NCDEENR Department of Environment and Division of Water Quality Colleen H. Sullins Director August 31, 2010 Mr. J. B. Setzer. P.E. Division 14 Engineer !N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Natural Resources Dee Freeman Secretary Subject: Stormwater Inspection US 25/1-26 Connector DWQ Project No. 081754 TIP No. R-0505 Henderson County Dear Mr. Setzer: On August 5, 2010, 1 conducted a stormwater inspection for TIP Project No. R-0505, US Highway 2511-26 Connector construction project in Henderson County. The rainfall data and erosion control records appear to be maintained in good order. Continue to ensure that these records are maintained during the life of the project. Please refer to the attached inspection report for additional comments and/or recommendations. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell, P.E. Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Selzer) R-0505 August 2010 Storrnwater Inspection Location: 2090 U.S. Hghway 70, Swannanoa, North Carolina 28778 Phone: 828-296-05001 FAX: 828-29970431 Customer Service: 1-877 623-6748 Internet: www.navaterquality org An Equal Opportunity \ Affirmative Action Employer NorthCarolina Naturally Form A June 2005 Site Inspection form- Consh uction Stormvvater Permit NPDES NCG010000 Site Name: DWQ RO: k Inspector: A? : k E t o ; ' 1. DWQ Inspection date: (Al) u F - •,• ?' %s , Location: 2. County: (A2)1 r: 5. Stream (A5)L4.pcv. ( ?"tr. rltys ?; 3. Basin: (A3) 6. Class A6 ; G 4. Location description. _ (A4 , a; Lam?=are ,.': =Gi4 .0 `LL.1,4 p.='Gtd - r - xq 4 (fopographi 1 vicini map of site is attached for case file) 7. Land disturbance due to construction/ development? (A7) Lt. r ? ;r- No rzii 6. On-site representative available during inspection? . AS) 'r Yes r- No ,? j'. `• Name(s) : N k\ Title(s) Employer(s) 9. Erosion and Sedimentation Control Plan (Part 1. Section A• No. 2.) Is a copy of the approved plan on site and available for review? 10. Rain Gauge ( Part I. Section B. No. 1.) Is a rain gauge present on the site at the time of inspection? 11. Rain Gauge Data ( Part I. Section B. No. 1.) Is rain gauge data measured and recorded? Data from past 14 days: Week1 Date Amount: 'aD ©l3,a w .'pa> Week 2 Date Amount: (A9) z )"i No ,r. Not Inspected' R1 (At 0) P.; Y s a4(f-' No `; ir- Not L Inspected' (A11) 'r vos a It No r Not: Inspected- 1 12. Minimum Monitoring & Record Keeping (Part I. Section B. No. 3.) Are inspection records of erosion & sedimentation control facilities complete available n re nest? (Al 2)>. v '.-Nnospected, Dates of documented ins ections du n the ast 14 da s: Weeks Week 2 13. Sedimentation impacts to waters 14. Linear ft of stream Im acts Typical range of sediment depth: (A13a) (A14) Maximum depth of sediment: (A136) ?;_? ; 15. Photo Documentation: Were photos taken? (Al 5) ;;r Yes ,' No . , Photos (r. impacted water, 2. sedimentation depths, 3. sediment control measures, and 4 un impacted upstream and sketcNmap of where photos were taken are attached for case file 16. Notes: Project personnel not available during DWO site inspection 1-4