Loading...
HomeMy WebLinkAboutNCC205399_NOI Application_20201208Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/20/2020 12:00:55 PM (NCG01 NOI Submission) Approve by Morman, Alaina 11/21/2020 12:16:43 AM (Review- Construction NOI 36758) • • The task was assigned to Morman, Alaina by round robin distribution 11/20/2020 12:01 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 24, 2020 5:00 PM 11/20/2020 12:01 PM Submit by McCoy, Suzanne 12/8/2020 2:36:00 PM (Payment Verification for NCC205399) * County of Dare • McCoy, Suzanne assigned the task to McCoy, Suzanne 12/8/2020 2:35 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 4, 2021 5:00 PM 11 /21 /2020 12:17 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * College of the Albemarle New Academic Building 1 b. Specific Lot This field nay be used to list specifc lot numbers. Numbers 2. County* Dare 3. Highway or Street US Hwy 64 Address* Street narre only is acceptable if no address number assigned yet 4.City orTownship* Manteo 5. State * NC 6. Zip Code * 27954 7. Latitude* Enter the latitude in decirral degrees 35.9039 8. Longitude* Enter the longitude in decir al degrees (M.JST be negative) -75.6722 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/20/2020 Estimated Construction Project Start Date 10. Date to End* 04/01/2022 Estinated Construction Project End Date 11. SIC (Primary) * Other (9999) Standard Industrial aassification for Developrrent 12. Acres to be 8.50 disturbed* (including off -site borrow and waste areas) 13. Total site area 14.90 (acres) * 14. Post- 4.72 construction (Estimated) impervious area (acres) * NCC Project NCC-DARE-2020-College of the Albemarle New Academic Building Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Shallowbag Bay Waterbody* Narre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 30-21-3 Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Dare County It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Robert If Corporation, enter Faegistered Agent First %rre 3. Last Name* Outten It Corporation, enter Pbegistered Agent Last %rre 3b. Title County Manager 4. Permitee E-mail outten@darenc.com Address* 5. Permittee 252-475-5800 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box 1000 Address Line 2 City Manteo Fbstal / Zip Code 27954 Check box if the F Yes street address the same as mailing address State / Frovince / i egion NC Country us 7. Permittee Street Street Address Address* 954 Marshall C Collins Drive Address Line 2 City State / Frovince / Region Manteo NC Fbstal / Zip Code Country 27954-8007 us 8. Type of Government - Municipal Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Nick Contact - First Name * 2. Primary Site McKeel Contact - Last Name * 3. Title Project Manager 4. Site Contact E- nmckeel@barnhillcontracting.com mail Address* 5. Site Contact 919-524-6254 Telephone No. 6. Organization Barnhill Contracting Name 7. Site Contact Street Address Mailing Address* PO Box31765 Address Line 2 city Raleigh Fbstal / Zip Code 27622 8. Consultant Name (Optional) Kim Hamby First and Last nacre 9. Consultant E-mail kim.hamby@timmons.com This person will be copied on all correspondence. 10. Consultant 252-621-5029 Telephone No. State / Rovince / Region NC Country Us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/30/2020 Approved * 2. E&SC Plan Project Dare-2021-006 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Washington (WaRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan 45567-E&S Approval Letter.pdf 768.42KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Mist be RDFfornat (lint 20 NB) D - 45567-Quad Map-Stormwater.pdf 1.51VIB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NCGO1 Notice Dare COA Project.pdf 1.29MB Form Wst be RDFfornal This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Robert Outten Title County Manager Organization Legally Plesponsible Entity Dare County Date * 11/20/2020 F. Tracking and COC Info NOI Tracking No. 36758 NC Reference No. NCG01-2020-5399 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205399 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5399 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205399-2020 Invoice Due Date 12/21/2020 Initial Fee $ 100.00 Invoice Status OPEN