Loading...
HomeMy WebLinkAbout20090366 Ver 3_Application_20100913NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary 0 of v Ch 0 North Carolina Division of Water Quality Transportation Permitting Unit In-Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Waters Permit Modification 1//S J Project Name= Project No.: NO 2-37/1 Date: ?? DWQ Project No./Permit Type: '2SO 3C(o vex. 3 /N"A DOT Division:5-County: A/9 K .C_ DOT Staff: N egfti pl` 1417 q h t DWQ Staff: ?0 13 //?1 I i1pp/G.5 // l ACE Staff: DWQ Regional Office: rl/lllz?/a i Modification Description: Modification Sketch: Transportation and Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crahtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-7336693 Internet httpJfh2o.enr.state.nc.ustnavetlandsl NorthCarolina Nahmallry An Equal Opportunity 1 Affirmative Action Employer In-Field Modification .,V Page 2 of 3 This in-field modification is required for the following reason(s): The information contained in the application or presented in support thereof is incorrect in the following manner: X Conditions under which the original certification was issued have changed in the following manner: 11+ This in-field modification is valid only if issued by an authorized agent of the NC Division of Water Quality, Transportation Permitting Unit. This in-field modification authogqs the NCD T to - I i v n of r4 inlzyl , `n •?A ISO -t- 4 cJ ?O4e in 1,4 /A K jL- County. The project shall be constructed as described in the Modification Description and SkeItch on Page 1 of this document dated 9 -/ y - 16 to improve/construct the section of ?,. r,144 I NI'that extends from e9/! SR 20 5,3 to . The approved design is that described in the Modification Description and Modification Sketch on Page 1 of this document dated ??_ /0'- 10 . Any further changes to the original Water Quality Certification dated 4-I' ZI ' y I may require a formal written modification request. The description of the proposed action provides adequate assurance that the proposed action in the River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Should your project change, you are required to notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non-discharge and Water Supply watershed regulations. This Modification Approval shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Condition(s) of Modification Approval: 1. As-built drawings of the proposed action shall be submitted to the NC DWQ Transportation Permitting Unit within 30-days of the completion of the action. 2. All the authorized activities and conditions of the certification associated with the original Water Quality Certification dated G/- 21-0 and all other corresponding modifications still apply except where superceded by this certification. In-Field Modification Page 3 of 3 3. Additional Conditions / ZMI Failure to construct the proposed action as described in the Modification Description and Sketch on Page 1 of this document and/or violations of any condition herein set forth may result in revocation of this modification approval and may result in criminal and/or civil penalties. This modification approval shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404 permit for the, proposed action, then NC DWQ must require a formal written modification to the 401 WQC, and therefore, this in-field modification is invalid. If additional (wetland, stream, buffer) impacts for this project (now or in the future) exceed (one acre, 150 linear feet, or one-third of an acre/150 linear feet, respectively), or if mitigation is required above and beyond the current mitigation requirements for this project, this in-field modification is invalid and a formal written modification is required. This in-field modification is effective upon the date the last party signs this document. This in-field modification'is made upon mutual agreement between DOT and DWQ as indicated by the signatures below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made within sixty (60) days of notification pursuant to the contested case provisions of the Administrative Procedure Act, N.C. Gen. Stat. § 1505-23 et_ seq. DWQ Staff Signature: Date: 7113 / DOT Staff Signature: Date: Staff Signature: Date: I 7 An authorized agent of the Transportation Permitting Unit is defined as DWQ staff that are DOT-funded and review and issue 401 Water Quality Certifications for DOT projects. These staff include Central Office and Regional Office personnel. i t i • I (a STATE OF NORTH CAROLINA BEVERLY EAVES PERDUE GOVERNOR ARTMENT OF TRANSPORTATION EUGENE A. CONTI, JR. SECRETARY September 10, 2010 Transportation 2321 Crabtree Raleigh, NC 2 Attention: Mr. Reference: Neuse Subject: Mo regi the ml The North Carolina.I r bridge``replacement v crossing Austin Creel Creek. However, whe plans now include an the plans attachcd.;to' (:..roomrfor -utility_:reloct weret'reported-T only -t easement area.. Therefore Division 5 i; a buffer authorization and 200 SF within B: information, please col Unit 250 Riding, NCDOT Project Coordinator Authorization (DWQ Project No. 20090366 and 20090366 ver. 2). ration request due to additional buffer impacts associated with easement rent beyond right-of-way limits to facilitate utility relocation activity on quadrant of the crossing of Smiths Creek at Bridge No:-140: on SR 2053 -County, Federal Aid Project No. BRZ-2053(1); Division 5; TIP B-3919. apartment ofrTransportation (NCDOT).has' B-3919'under.contract.. and t rk as'.,well'asutility.relocation work is.:underway;atBridge-No 448 Constriction activity has not started' at Bridge:No. 140 crossingSmiths recently staking the project limits at Bridge No. '140 it obviousthat the' "- asement block,.beyond the right-of-.way limits, whicbmasn't depicted: on "I., ie original permit application(s). This easement is necessary.to provide on work within the NE quadraot: Original proposed, buffer impacts,h'ere t to the right-of:way']imits:and did not -include:impacts,withimthts, providing this letter to report these extra proposed impacts and to request nodification for the :additional buffer impacts totaling 150 SF within 3Z1 2 (see attached drawing). If you have any questions or need additional tact Ms. Heather Montague at (252)492-0111 Sincerely, J.W. Bowman, P.E. Division Engineer VVV cc: Mr. Eric NCDOT Coordinator, U.S. Army Corps of Engineers Five - 26t2 \nTlh Duke Street, Durham, North Cam] ina 27704 Tc]ephune: 919-2204600 Fax: 419-560-3371 - ` ? - _ 4,O GHAVLL n 7 Op ? O cu) 0 _- OV t0 j N ?C52 rW vI ??y('? O • ,'? T ? I I W N _U ?? O W 0 011 (0 CO pv 00 p ? J N O m w, q ti D X C) w o m ,z N fmn z = ile, N o m _ 7rd Z Z NQ'NW N?CO? (? 31 i - m??aD .NW i •?O N? ? is ?; 0 O1lwl - ? J. 01 N `. `U - N .? N 'O to O m yN-1?1j W . m It N V `? CO ol CID 4 ?- tn0 C p r a S in A yp ":? ??3?? . II N • m roam-iOC_ ZEI K ?l 1 E - r 71 N m 2° cl co =03 o La Ox ?0o t oN (?jt ? ,? :: II I m mz 1( . R O I I N N N °r-Ai d! I I a @? gN m i ?I. ?' ?' I CA ?7 L9e -- C ' N I IT o trp ? ~ D m ro?a zmI + IA? J? Z t I ? ? 'A m w w 3 °^ ?- H o m ? a